TxDOT letting results, November 4, 2026
31 contracts let by Texas DOT on November 4, 2026, $347,394,961 in low bids, a median of 4 bidders per contract. On the 31 with an engineer's estimate, the low bid came in under it 19 times; median low bid -7.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 31
- Low bids, total
- $347,394,961
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00212892 | Widen Road - Add Lanes, IH 35 (North of Rector to South of FM 455) | Dallas District | 6 | Indus Road & Bridge, Inc. | $138,145,038 | $143,276,861 | +4.0% | -4.0% | TxDOT |
| A00129572 | Construct New Roadway Lanes, SH 5 (NORTH OF COLLIN COUNTY OUTER LOOP to FM 455 w/TRANSITION N OF HACKBERRY DR) | Dallas District | 4 | Mario Sinacola & Sons Excavating, Inc. | $35,766,135 | $36,656,931 | +2.0% | -10% | TxDOT |
| A00124162 | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | Bryan District | 12 | Fluor Enterprises, Inc. | $30,209,876 | $33,187,594 | +10% | -5.0% | TxDOT |
| A00208301 | Seal Coat, US 84 (Sudan West City Limits to FM 37) | Lubbock District | 4 | Lipham Asphalt and Paving Company, LLC | $22,298,624 | $22,365,549 | 0.0% | -13% | TxDOT |
| A00208936 | Seal Coat, US 287 (.01 MI S OF US 54 IN STRATFORD to MOORE COUNTY LINE) | Amarillo District | 2 | Breedon Investments USA Inc. | $18,301,952 | $18,705,498 | +2.0% | 0.0% | TxDOT |
| A00208598 | Seal Coat, UA 90 (FM 3013 to Wharton C/L) | Yoakum District | 4 | Ronald R. Wagner & Co., LP | $17,597,090 | $17,617,490 | 0.0% | +3.0% | TxDOT |
| A00193963 | Preventive Maintenance, SH 66 (Collin County Line to FM 6) | Paris District | 2 | CDM Holdings | $14,216,814 | $15,276,979 | +7.0% | -25% | TxDOT |
| A00206631 | Hazard Elimination & Safety, FM 485 (1.99 Mi W of FM 979 to 1.86 Mi E of FM 979) | Bryan District | 7 | Big Creek Construction, LTD. | $9,787,627 | $10,182,780 | +4.0% | -7.0% | TxDOT |
| A00197444 | Seal Coat, SL 254 (0.034 MI. S. OF IH 20 N. FRONTAGE RD. N. to IH 20 S. FRONTAGE ROAD) | Brownwood District | 4 | Northeastern Pavers, LLC | $9,329,948 | $9,480,787 | +2.0% | +4.0% | TxDOT |
| A00196925 | Widen Road - Add Shoulders, FM 35 (Creek Dr. to SH 276) | Paris District | 9 | Highway 19 Construction LLC | $6,803,596 | $7,241,746 | +6.0% | +4.0% | TxDOT |
| A00140672 | Preventive Maintenance, US 277 (SOUTH Y IN HASKELL SOUTHBOUND to JONES COUNTY) | Abilene District | 9 | Lone Star Paving Company | $6,732,215 | $7,796,183 | +16% | -10% | TxDOT |
| A00223988 | SWEEPING AND DEBRIS REMOVAL, IH0610 (Various Locations to Various Locations) | Houston District | 2 | Sweeping Corporation of America, LLC | $4,204,328 | $5,156,687 | +23% | +16% | TxDOT |
| A00193521 | Hazard Elimination & Safety, FM 665 (1600 FT W OF CR75 to 1600 FT E OF CR75) | Corpus Christi District | 5 | J E Construction Services, LLC | $3,833,265 | $3,837,222 | 0.0% | -20% | TxDOT |
| A00222974 | ASPHALT PAVEMENT REPAIR, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT) | San Angelo District | 4 | Reece Albert, Inc. | $3,124,443 | $4,241,563 | +36% | +74% | TxDOT |
| A00224395 | AGGREGATE, SH0070 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 3 | L A Fuller & Sons Construction, LTD. | $3,073,285 | $5,458,628 | +78% | -42% | TxDOT |
| A00209149 | Bridge Replacement, MANGANA-HEIN RD (MANGANA HEIN RD to .) | Laredo District | 7 | STX Civil | $2,866,785 | $2,950,000 | +3.0% | +12% | TxDOT |
| A00188206 | Resurface Roadway, IH 35 (0.73 MI N of Posey Rd to 0.19 MI S of SH 123) | Austin District | 6 | Bobcat Services, Inc. | $2,797,454 | $3,184,282 | +14% | -12% | TxDOT |
| A00193012 | Hazard Elimination & Safety, FM 1004 (0.27 MI N OF CR 634 to 2.27 MI N OF CR 634) | Beaumont District | 2 | Texas Materials Group, Inc. | $2,431,741 | $2,827,776 | +16% | +7.0% | TxDOT |
| A00224031 | TRAFFIC CONTROL SERVICES, SH0081 (VARIOUS LOCATIONS to WITHIN WACO DISTRICT) | Waco District | 3 | Awp Safety | $2,308,875 | $2,562,471 | +11% | +7.0% | TxDOT |
| A00224419 | SWEEPING AND DEBRIS REMOVAL, SH0336 (VARIOUS ROADWAYS to Pharr, Mission, and Edcouch MNT Sections) | Pharr District | 3 | Digg Commercial, LLC | $1,688,682 | $1,733,881 | +3.0% | -15% | TxDOT |
| A00224201 | BASE FAILURE PAVEMENT REPAIR, SH0081 (VARIOUS LOCATIONS to ACROSS HILL, FALLS, AND LIMESTONE) | Waco District | 3 | Big Creek Construction, LTD. | $1,603,275 | $1,745,058 | +9.0% | -16% | TxDOT |
| A00041166 | Preventive Maintenance, PW (WITHIN LAKE BROWNWOOD STATE PARK to .) | Brownwood District | 6 | Jay Mills Contracting, Incorporated | $1,561,729 | $1,683,823 | +8.0% | -10% | TxDOT |
| A00224204 | BASE FAILURE PAVEMENT REPAIR, SL0121 (VARIOUS LOCATIONS to WITHIN BELL COUNTY) | Waco District | 3 | Texas Materials Group, Inc. | $1,470,225 | $1,769,425 | +20% | -16% | TxDOT |
| A00221989 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | Dallas District | 7 | Austin Bridge & Road Services, LP | $1,246,988 | $1,317,125 | +6.0% | -11% | TxDOT |
| A00224104 | TRAFFIC CONTROL SERVICES, US0175 (Various Locations within to Henderson and Anderson Counties) | Tyler District | 4 | Highway 19 Construction LLC | $1,217,140 | $1,302,000 | +7.0% | +2.0% | TxDOT |
| A00223370 | TRAFFIC CONTROL SERVICES, US0084 (VARIOUS ROADWAYS to WITHIN WACO DISTRICT) | Waco District | 2 | Awp Safety | $1,186,595 | $1,603,100 | +35% | -1.0% | TxDOT |
| A00206976 | Construct Pedestrian Infrastructure, RM 12 (Old Kyle Road to FM 3237) | Austin District | 9 | Lone Star Sitework, LLC | $950,337 | $1,083,834 | +14% | +1.0% | TxDOT |
| A00209029 | Removal And/Or Replacement And/Or Disposal, IH 37 (1.20 Mi W of SH 358 to @ old UPRR overpass) | Corpus Christi District | 4 | Relmco, Inc. | $849,655 | $979,000 | +15% | -47% | TxDOT |
| A00223826 | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | Childress District | 16 | Blacksmith Ventures LLC | $701,941 | $745,061 | +6.0% | -38% | TxDOT |
| A00221850 | Install Illumination, IH 45 (At Causeway Bridge to .) | Houston District | 5 | Deco Contractors, Inc. | $607,082 | $651,014 | +7.0% | +19% | TxDOT |
| A00222905 | Widen Road - Add Lanes And Shoulders, SH 114 (At Alliance Blvd to .) | Fort Worth District | 7 | Xit Paving and Construction Inc. | $482,224 | $583,959 | +21% | -22% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.