TxDOT contract A00188206 bid tabulation

Resurface Roadway, IH 35 (0.73 MI N of Posey Rd to 0.19 MI S of SH 123). Let by Texas DOT on November 4, 2026, Hays, Austin District. 6 bids received; low bid $2,797,454 by Bobcat Services, Inc., -12% against the engineer's estimate of $3,185,148.

Owner
Texas DOT
Letting
04 NOV 2026
Pay items
61
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Bobcat Services, Inc.$2,797,454Low-12%
2Hunter Industries, LTD.$3,184,282+14%0.0%
3Dean Word Company, LTD.$3,495,937+25%+10%
4Texas Materials Group, Inc.$3,586,449+28%+13%
5Lone Star Paving Company$3,801,261+36%+19%
6Clark Construction of Texas, Inc.$3,825,058+37%+20%
TxDOT contract A00188206: bids by rank

Engineer's estimate: $3,185,148.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Bobcat Services, Inc.2. Hunter Industries, LTD.3. Dean Word Company, LTD.4. Texas Materials Group, Inc.5. Lone Star Paving Company6. Clark Construction of Texas, Inc.
1Backfill (type A) (134-7001)STA207$141.45$145.28$155.00$151.00$150.00$308.00$290.00
2D-GR HMA type D PG76-22 (level-UP) (341-7059)TON1,802$100.00$91.45$90.00$107.25$115.00$116.00$106.00
3Tom-C PG76-22 sac-B (347-7002)TON12,670$105.00$95.02$100.00$109.15$140.00$157.00$147.07
4Flexible pavement structure repair(6") (351-7005)SY21,845$37.50$28.30$35.00$39.00$37.00$41.25$46.62
5Planing asphalt concrete pavement (0"- 1" edge mill) (354-7049)SY694$0.96$2.14$1.00$1.75$2.75$2.55$2.00
6Planing asphalt concrete pavement(1") (354-7050)SY136,291$0.90$0.54$1.00$1.75$1.35$1.18$1.10
7Mobilization (500-7001)LS1$151,675$137,273$299,276$300,000$135,000$55,500$53,000
8Barricades, signs and traffic handling (502-7001)MO7$12,500$3,145.80$4,788.18$2,050.50$1,900.00$1,905.00$1,905.20
9Portable changeable message sign (503-7001)DAY300$83.08$86.65$76.58$87.00$25.00$15.00$60.00
10TMA (stationary) (505-7001)DAY200$196.79$301.98$153.16$15.00$25.00$15.00$60.00
11TMA (mobile operation) (505-7002)HR144$150.00$105.24$102.11$32.00$40.00$50.00$60.00
12Temporary sediment control fence (install) (506-7039)LF2,250$3.90$3.41$3.41$3.50$3.25$3.25$6.50
13Temporary sediment control fence (remove) (506-7041)LF2,250$0.96$1.05$1.05$1.00$1.00$1.00$0.50
14Biodegradable erosion control logs (install) (12") (506-7044)LF2,250$5.50$8.04$5.25$5.50$5.00$5.00$7.65
15Biodegradable erosion control logs (remove) (506-7046)LF2,250$1.17$1.05$1.05$1.00$1.00$1.00$1.00
16Install delineator assembly (D-SW)SZ 1(WFLX)SRF(BR) (658-7008)EACH72$87.62$110.29$110.25$113.00$105.00$100.00$136.75
17Remove delin & object marker assms (658-7078)EACH72$20.53$10.10$24.15$24.75$23.00$5.00$1.25
18Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF20,722$0.30$0.42$0.40$0.50$0.45$0.40$0.40
19Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF677$0.50$1.05$1.00$1.00$1.00$1.00$1.00
20Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF57,302$0.29$0.37$0.35$0.35$0.40$0.35$0.35
21Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF212$0.53$1.05$1.00$1.00$1.00$1.00$1.00
22Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF14,218$0.53$0.53$0.50$0.50$0.40$0.50$0.50
23Work zone pavement marking non-removing (W)12"(lane drop) (662-7014)LF528$0.40$2.10$2.00$2.25$2.00$2.00$2.00
24Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF2,387$2.22$1.79$1.70$1.75$2.00$1.70$1.70
25Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF6,092$3.30$4.20$4.00$4.25$3.00$4.00$4.00
26Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH46$62.01$105.03$100.00$107.75$65.00$100.00$100.00
27Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH43$92.09$105.03$100.00$107.75$85.00$100.00$100.00
28Work zone pavement marking non-removing (W)(RR crossing) (662-7024)EACH4$262.59$250.00$269.00$220.00$250.00$250.00
29Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH8$75.25$131.29$125.00$134.50$95.00$125.00$125.00
30Work zone pavement marking non-removing(W)(word) (662-7030)EACH33$70.95$100.83$100.00$107.75$75.00$100.00$100.00
31Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH30$12.88$21.01$20.00$21.50$30.00$20.00$20.00
32Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF118$0.42$0.40$0.50$0.45$0.40$0.40
33Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF68,847$0.25$0.37$0.35$0.35$0.40$0.35$0.35
34Work zone pavement marking non-removing (Y)12"(solid) (662-7040)LF289$1.42$1.84$1.75$2.00$2.00$1.75$1.75
35Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH60$6.30$5.00$5.50$4.25$5.00$5.00
36Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH8,874$1.60$0.48$1.72$2.00$1.50$0.50$0.70
37Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH2,788$1.26$0.50$1.72$1.75$1.50$0.50$0.70
38Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF437$1.41$1.05$1.00$1.00$1.00$1.00$1.00
39Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF177$1.48$1.05$1.00$1.00$1.00$1.00$1.00
40Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF11,035$1.03$0.95$0.90$1.00$0.95$0.90$0.90
41Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF440$1.31$3.68$3.50$3.75$5.00$3.50$3.50
42Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF1,935$4.69$4.20$3.25$3.50$5.00$3.25$3.25
43Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF3,388$7.30$7.09$6.75$7.25$7.25$6.75$6.75
44Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH46$153.92$183.81$175.00$188.25$195.00$175.00$175.00
45Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH43$173.19$236.33$225.00$242.25$225.00$225.00$225.00
46Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH8$249.43$315.10$300.00$323.00$220.00$300.00$300.00
47Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH33$190.84$210.07$200.00$215.25$200.00$200.00$200.00
48Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH4$525.17$500.00$538.25$550.00$500.00$500.00
49Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH30$48.30$36.76$35.00$37.75$75.00$35.00$35.00
50Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099)EACH3$210.07$200.00$215.25$275.00$200.00$200.00
51Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF241$3.50$4.20$4.00$4.25$5.00$4.00$4.00
52Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF34,574$0.81$1.05$0.85$1.00$0.75$0.85$0.85
53Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF34,312$0.77$0.89$0.85$1.00$0.75$0.85$0.85
54Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF15,679$0.56$0.87$0.73$0.75$0.60$0.73$0.73
55Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF13,178$0.58$0.74$0.67$0.75$0.55$0.67$0.67
56Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF98$0.77$0.73$0.75$0.60$0.73$0.73
57Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF20,909$0.58$0.70$0.67$0.75$0.55$0.67$0.67
58Reflectorized pavement marker type I-C (672-7002)EACH274$4.11$4.73$4.50$4.75$4.25$4.50$4.50
59Reflectorized pavement marker type II-A-A (672-7004)EACH860$4.24$4.73$4.50$4.75$4.25$4.50$4.50
60Reflectorized pavement marker type II-C-R (672-7006)EACH2,031$4.14$4.73$4.50$4.75$4.25$4.50$4.50
61Bonding course (3007-7001)GAL21,627$3.25$4.20$3.75$3.75$4.00$3.25$4.50
TxDOT contract A00188206: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy