Lone Star Sitework, LLC: TxDOT bid record
Lone Star Sitework, LLC submitted 34 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 9 of them (26%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $18,516,081
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 3 | 30% |
| 2021 | 5 | 0 | 0% |
| 2022 | 6 | 3 | 50% |
| 2023 | 1 | 1 | 100% |
| 2024 | 2 | 1 | 50% |
| 2025 | 5 | 0 | 0% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 26 | 8 | 31% |
| San Antonio District | 5 | 0 | 0% |
| Corpus Christi District | 2 | 1 | 50% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Preparing row | 100-7002 | STA | 26 | 20 (77%) | $300.00 | $2,750.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 34 | 13 (38%) | $1,912.50 | $5,000.00 |
| Removing concrete (driveways) | 104-7011 | SY | 15 | 7 (47%) | $17.50 | $21.00 |
| Removing structure (pipe) | 496-7007 | LF | 14 | 6 (43%) | $19.00 | $24.00 |
| Prime coat (multi option) | 310-7015 | GAL | 15 | 5 (33%) | $4.50 | $5.00 |
| Removing concrete (sidewalks) | 104-6015 | SY | 6 | 5 (83%) | $14.65 | $20.00 |
| Excavation (roadway) | 110-7001 | CY | 25 | 4 (16%) | $20.00 | $20.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 15 | 4 (27%) | $115.00 | $108.13 |
| Riprap (concrete)(5 in) | 432-7002 | CY | 8 | 4 (50%) | $575.00 | $640.65 |
| Curb ramps (type 7) | 531-7010 | EACH | 8 | 4 (50%) | $1,902.50 | $2,500.00 |
| Cem stabil BKFL | 400-7010 | CY | 7 | 4 (57%) | $168.00 | $200.00 |
| Cut & restore asphalt paving | 400-7008 | SY | 7 | 4 (57%) | $60.00 | $150.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dan Williams Company | 17 | 10 of 17 |
| Hunter Industries, LTD. | 15 | 8 of 15 |
| Aaron Concrete Contractors, L.P. | 14 | 4 of 14 |
| Acme Bridge Company, Inc. | 11 | 7 of 11 |
| Dean Word Company, LTD. | 9 | 5 of 9 |
| Texas Materials Group, Inc. | 9 | 5 of 9 |
| Aaron Concrete Contractors, LLC | 9 | 5 of 9 |
| Angel Brothers Holdings Corp. | 8 | 5 of 8 |
| Altus Construction LLC | 6 | 1 of 6 |
| Capital Excavation Company | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00206976 | Austin District | Construct Pedestrian Infrastructure, RM 12 (Old Kyle Road to FM 3237) | 1 of 9 | $950,337 | Low, 14% under the second |
| 06 OCT 2026 | A00206378 | Bryan District | Construct Pedestrian Infrastructure, FM 486 (Front Street to Salty Street) | 2 of 10 | $283,379 | +10% |
| 05 FEB 2026 | A00135345 | Austin District | Reconstruct Existing Roadway, FM 487 (COLLEGE AVENUE to SH 195 BYPASS) | 5 of 10 | $3,915,770 | +7.0% |
| 05 FEB 2026 | A00193136 | Austin District | Hazard Elimination & Safety, FM 3405 (0.348 MI E of Ronald Reagan Blvd to 0.228 MI W of Georgetown Heights Dr) | 2 of 9 | $2,803,594 | +2.0% |
| 07 JAN 2026 | A00130902 | Austin District | Hazard Elimination & Safety, RM 150 (AT Onion Creek Double Crossings to .) | 6 of 10 | $1,314,067 | +32% |
| 03 DEC 2025 | A00206306 | Austin District | Highway Improvement, US 183 (0.12 miles north of County Road 309 to 0.92 miles north of County Road 309) | 7 of 7 | $1,988,056 | +29% |
| 06 NOV 2025 | A00193148 | Austin District | Hazard Elimination & Safety, RM 3237 (0.305 MI W of Lone Man Mountain Rd to 0.379 MI E of Lone Man Mountain Rd) | 7 of 7 | $2,701,682 | +36% |
| 02 JUL 2025 | A00206684 | Austin District | Hazard Elimination & Safety, US 281 (Stanton Rd to US 290E) | 7 of 7 | $928,717 | +52% |
| 05 JUN 2025 | A00200605 | Austin District | Construct Curb And Gutter, SH 71 (BEE CREEK ROAD to UPLANDS RIDGE) | 4 of 5 | $2,000,772 | +23% |
| 04 MAR 2025 | A00190692 | San Antonio District | Hazard Elimination & Safety, RM 32 (RM 484 to Carpers Trail) | 3 of 9 | $4,085,612 | +20% |
| 07 NOV 2024 | A00195331 | Austin District | Hazard Elimination & Safety, RM 3237 (RM 150 to RM 12) | 5 of 7 | $6,137,127 | +24% |
| 05 MAR 2024 | 03243015 | Austin District | RM 3237 Hazard elimination & safety from RM 150 to RM 12 | 1 of 8 | $5,105,188 | Low, 1.0% under the second |
| 27 JUN 2023 | 06233436 | Austin District | FM 3177 Widen road - add lanes from 0.11 MI N OF BAGBAY DR. to 0.07 MI S OF CONAGA AVE | 1 of 4 | $2,361,951 | Low, 5.0% under the second |
| 03 AUG 2022 | 08223012 | Austin District | RM 12 Widen road - add lanes from HUGO RD to PIONEER TRAIL | 3 of 7 | $5,231,920 | +3.0% |
| 03 AUG 2022 | 08223041 | Austin District | RM 32 Intersection improvement from AT PURGATORY RD | 1 of 5 | $1,073,850 | Low, 2.0% under the second |
| 30 JUN 2022 | 06223627 | Austin District | SL 275 Install traffic signal from AT RAMBLE LN | 1 of 3 | $1,318,917 | Low, 20% under the second |
| 30 JUN 2022 | 06223635 | San Antonio District | CS Hazard elimination & safety from IN NEW BRAUNFELS ON BARBAROSA RD to AT FM 1101 | 2 of 6 | $2,041,294 | +6.0% |
| 04 FEB 2022 | 02223214 | Austin District | FM 1626 Hazard elimination & safety from SOUTH 1ST STREET to SOMBRERO DRIVE | 2 of 5 | $2,288,440 | 0.0% |
| 04 FEB 2022 | 02223220 | Austin District | FM 973 Bicycle and pedestrian improvements from WEST OF SH 130 to EAST OF SH 130 | 1 of 3 | $969,301 | Low, 10% under the second |
| 04 AUG 2021 | 08213014 | Austin District | US 183 Rehabilitation of existing road from RM 1869 to COLE DRIVE | 8 of 8 | $6,791,862 | +18% |
| 04 AUG 2021 | 08213031 | Austin District | FM 621 Widen road - add lanes from WEST OF DE ZAVALA DRIVE to EAST OF CR 266 OLD BASTROP HWY | 6 of 9 | $4,052,509 | +37% |
| 04 JUN 2021 | 06213219 | Austin District | FM 971 Widen road - add lanes from SS 158 (AUSTIN AVENUE) to GANN STREET/RIVER HAVEN DRIVE | 3 of 5 | $4,661,783 | +15% |
| 05 MAR 2021 | 03213206 | Austin District | FM 2001 Construct new roadway lanes from SUN BRIGHT BLVD. to FM 2001 | 8 of 12 | $6,784,599 | +14% |
| 04 FEB 2021 | 02213025 | Austin District | US 290 Intersection improvements with right and/or left from AT MARTIN ROAD | 6 of 9 | $1,534,795 | +40% |
| 05 JUN 2020 | 06203211 | Austin District | VA Construct ada curb ramps, sidewalk & ped signals from VARIOUS LOCATIONS IN HAYS, TRAVIS, to AND WILLIAMSON COUNTIES | 1 of 4 | $2,592,102 | Low, 16% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.