TxDOT contract A00206306 bid tabulation
Highway Improvement, US 183 (0.12 miles north of County Road 309 to 0.92 miles north of County Road 309). Let by Texas DOT on December 3, 2025, Caldwell, Austin District. 7 bids received; low bid $1,543,699 by Texas Materials Group, Inc., -29% against the engineer's estimate of $2,187,010.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 56
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $1,543,699 | Low | -29% |
| 2 | Hunter Industries, LTD. | $1,651,874 | +7.0% | -24% |
| 3 | Aaron Concrete Contractors, LLC | $1,744,020 | +13% | -20% |
| 4 | Acme Bridge Company, Inc. | $1,798,636 | +17% | -18% |
| 5 | Dan Williams Company | $1,842,152 | +19% | -16% |
| 6 | Dean Word Company, LTD. | $1,849,970 | +20% | -15% |
| 7 | Lone Star Sitework, LLC | $1,988,056 | +29% | -9.0% |
Engineer's estimate: $2,187,010.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Hunter Industries, LTD. | 3. Aaron Concrete Contractors, LLC | 4. Acme Bridge Company, Inc. | 5. Dan Williams Company | 6. Dean Word Company, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 43.40 | $4,000.00 | $1,000.00 | $2,761.70 | $520.00 | $1,080.00 | $2,750.00 | $1,700.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 4,898 | $22.50 | $17.00 | $16.50 | $15.00 | $14.90 | $22.00 | $24.25 |
| 3 | Embankment (final)(OC)(type C1) (132-7007) | CY | 1,841 | $60.00 | $48.00 | $45.20 | $17.00 | $55.40 | $50.00 | $57.25 |
| 4 | Backfill (type B) (134-7002) | STA | 43.40 | $145.50 | $150.00 | $104.50 | $645.00 | $150.00 | $365.00 | $286.25 |
| 5 | Furn & place topsoil (4") (160-7002) | SY | 23,120 | $3.00 | $2.00 | $1.10 | $1.20 | $1.45 | $1.55 | $1.25 |
| 6 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 23,120 | $0.31 | $0.16 | $0.16 | $0.20 | $0.17 | $0.30 | $0.25 |
| 7 | Vegetative watering (168-7001) | TGL | 388 | $40.00 | $17.00 | $26.24 | $20.00 | $58.00 | $2.00 | $74.50 |
| 8 | Soil ret BLKT(SL_mod_clay_short) (169-7001) | SY | 480 | $1.50 | $0.70 | $0.70 | $0.85 | $0.73 | $1.60 | $0.75 |
| 9 | Soil ret BLKT(SL_mod_clay_long) (169-7002) | SY | 22,640 | $1.75 | $0.55 | $0.54 | $0.65 | $0.57 | $1.25 | $0.75 |
| 10 | FL BS (compacted in place)(type D GR 5)(final pos) (247-7191) | CY | 2,947 | $80.00 | $72.00 | $50.66 | $80.00 | $68.30 | $60.00 | $66.00 |
| 11 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 1,769 | $5.25 | $5.00 | $4.44 | $6.00 | $3.35 | $3.30 | $4.00 |
| 12 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 2,384 | $130.00 | $90.00 | $83.76 | $112.00 | $94.20 | $90.00 | $89.75 |
| 13 | D-GR HMA type D PG 76-22 (exempt) (341-7065) | TON | 682 | $212.50 | $100.00 | $95.70 | $124.00 | $125.00 | $118.00 | $123.50 |
| 14 | Tom-C PG76-22 sac-A (347-7001) | TON | 1,710 | $180.00 | $144.00 | $121.66 | $180.00 | $157.00 | $148.00 | $160.00 |
| 15 | Flexible pavement structure repair(6") (351-7005) | SY | 2,507 | $60.00 | $42.00 | $44.91 | $54.00 | $60.80 | $52.00 | $59.25 |
| 16 | RC pipe (CL III)(24 in) (464-7005) | LF | 363 | $120.00 | $100.00 | $183.68 | $101.00 | $101.00 | $100.00 | $81.75 |
| 17 | RC pipe (CL III)(30 in) (464-7007) | LF | 4 | $125.00 | $1,000.00 | $520.56 | $683.00 | $386.00 | $650.00 | $381.00 |
| 18 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $9,000.00 | $9,250.00 | $31,721 | $16,700 | $11,500 | $13,000 | $23,155 |
| 19 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 12 | $2,000.00 | $2,250.00 | $3,586.96 | $1,700.00 | $3,060.00 | $2,500.00 | $2,095.75 |
| 20 | Mobilization (500-7001) | LS | 1 | $159,900 | $100,000 | $142,053 | $128,000 | $152,000 | $180,000 | $144,400 |
| 21 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $6,000.00 | $750.00 | $5,363.86 | $6,100.00 | $14,000 | $15,000 | $10,808 |
| 22 | Portable changeable message sign (503-7002) | EACH | 3 | $7,500.00 | $4,000.00 | $8,118.75 | $2,300.00 | $9,430.00 | $10,000 | $8,449.00 |
| 23 | TMA (stationary) (505-7001) | DAY | 53 | $190.00 | $20.00 | $216.50 | $88.00 | $200.00 | $170.00 | $447.75 |
| 24 | TMA (mobile operation) (505-7003) | DAY | 53 | $230.00 | $20.00 | $433.00 | $263.00 | $400.00 | $0.01 | $0.01 |
| 25 | Rock filter dams (install) (type 4) (506-7004) | LF | 206 | $41.00 | $47.00 | $46.87 | $58.00 | $49.10 | $75.00 | $55.25 |
| 26 | Rock filter dams (remove) (506-7011) | LF | 206 | $14.34 | $13.00 | $12.61 | $15.50 | $13.20 | $18.00 | $15.00 |
| 27 | Sandbags for erosion control (506-7035) | EACH | 72 | $6.00 | $13.00 | $12.86 | $15.80 | $13.50 | $8.20 | $15.25 |
| 28 | Temporary sediment control fence (install) (506-7039) | LF | 4,390 | $4.25 | $3.25 | $3.24 | $4.00 | $3.40 | $4.00 | $3.75 |
| 29 | Temporary sediment control fence (remove) (506-7041) | LF | 4,390 | $0.72 | $0.50 | $0.85 | $1.00 | $0.89 | $1.00 | $1.00 |
| 30 | Driveways (concrete) (530-7006) | SY | 305 | $114.71 | $115.00 | $133.05 | $99.00 | $119.00 | $120.00 | $90.50 |
| 31 | Driveways (ACP) (530-7010) | SY | 642 | $52.99 | $77.00 | $48.18 | $96.00 | $60.60 | $78.00 | $69.25 |
| 32 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 3 | $290.00 | $350.00 | $275.00 | $322.00 | $366.00 | $650.00 | $413.25 |
| 33 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 4 | $712.27 | $1,000.00 | $1,265.00 | $1,478.00 | $1,050.00 | $900.00 | $1,180.75 |
| 34 | Relocate SM RD SN sup&AM type TWT (644-7068) | EACH | 3 | $440.00 | $350.00 | $176.00 | $205.67 | $366.00 | $600.00 | $413.25 |
| 35 | Install delineator assembly (D-SY)SZ 2(WC)GND(BI) (658-7029) | EACH | 2 | $51.00 | $100.00 | $77.00 | $89.98 | $105.00 | $67.50 | $118.00 |
| 36 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 6,566 | $1.30 | $1.50 | $1.53 | $0.90 | $2.10 | $1.50 | $2.50 |
| 37 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 6,566 | $0.65 | $1.50 | $1.53 | $1.80 | $2.10 | $1.50 | $2.25 |
| 38 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 722 | $0.94 | $1.05 | $1.06 | $1.25 | $1.10 | $1.05 | $1.25 |
| 39 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 19 | $180.00 | $145.00 | $124.00 | $145.00 | $152.00 | $145.00 | $171.25 |
| 40 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 249 | $6.00 | $6.50 | $6.10 | $7.15 | $6.80 | $6.50 | $7.75 |
| 41 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 9,022 | $0.40 | $0.25 | $0.16 | $0.20 | $0.26 | $0.25 | $0.25 |
| 42 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 501 | $0.62 | $0.30 | $0.25 | $0.30 | $0.31 | $0.30 | $0.31 |
| 43 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 10,021 | $0.40 | $0.25 | $0.25 | $0.30 | $0.24 | $0.23 | $0.25 |
| 44 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 722 | $0.47 | $0.35 | $0.25 | $0.30 | $0.37 | $0.35 | $0.50 |
| 45 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 19 | $125.00 | $40.00 | $43.00 | $50.00 | $41.90 | $40.00 | $47.25 |
| 46 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 4,656 | $0.35 | $0.25 | $0.25 | $0.30 | $0.26 | $0.25 | $0.25 |
| 47 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 10,439 | $0.40 | $0.25 | $0.25 | $0.30 | $0.24 | $0.23 | $0.25 |
| 48 | Reflectorized pavement marking type II (Y) 24" (solid) (666-7217) | LF | 249 | $3.06 | $2.00 | $2.50 | $3.00 | $6.80 | $1.75 | $2.00 |
| 49 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 10,021 | $1.00 | $0.90 | $1.24 | $1.50 | $0.94 | $0.90 | $1.00 |
| 50 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 10,439 | $1.00 | $0.90 | $1.24 | $1.50 | $0.94 | $0.90 | $1.00 |
| 51 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 9,022 | $0.65 | $0.60 | $0.70 | $0.80 | $0.63 | $0.60 | $0.75 |
| 52 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,656 | $0.35 | $0.60 | $0.70 | $0.80 | $0.63 | $0.60 | $0.75 |
| 53 | Reflectorized pavement marker type I-C (672-7002) | EACH | 184 | $5.50 | $4.00 | $6.10 | $7.10 | $4.20 | $4.00 | $4.75 |
| 54 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 262 | $4.50 | $4.00 | $6.10 | $7.10 | $4.20 | $4.00 | $4.75 |
| 55 | Bonding course (3007-7001) | GAL | 3,691 | $3.25 | $3.75 | $3.24 | $5.00 | $2.95 | $3.00 | $4.00 |
| 56 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 4 | $1,180.00 | $1,500.00 | $2,500.00 | $590.00 | $1,310.00 | $650.00 | $2,325.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.