Aaron Concrete Contractors, L.P.: TxDOT bid record
Aaron Concrete Contractors, L.P. submitted 45 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 AUG 2022, and was the low bidder on 5 of them (11%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $12,654,876
- Latest bid
- 03 AUG 2022
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 19 | 4 | 21% |
| 2021 | 18 | 1 | 6% |
| 2022 | 8 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 44 | 5 | 11% |
| San Antonio District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 45 | 21 (47%) | $2,000.00 | $5,000.00 |
| Preparing row | 100-7002 | STA | 40 | 11 (28%) | $1,000.00 | $2,750.00 |
| TMA (stationary) | 505-7001 | DAY | 43 | 9 (21%) | $260.00 | $230.00 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 15 | 9 (60%) | $0.90 | $1.45 |
| Portable changeable message sign | 503-7001 | DAY | 22 | 7 (32%) | $93.00 | $100.00 |
| Embankment (final)(ord comp)(type B) | 132-6003 | CY | 32 | 6 (19%) | $14.50 | $30.00 |
| Downstream anchor terminal section | 540-7015 | EACH | 14 | 5 (36%) | $1,325.00 | $1,485.00 |
| Cell fiber mulch seed(temporary)(warm) | 164-6029 | SY | 8 | 5 (63%) | $0.38 | $0.50 |
| Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) | 512-7005 | LF | 7 | 5 (71%) | $14.00 | $50.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 44 | 4 (9%) | $1.10 | $1.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 38 | 4 (11%) | $2.00 | $3.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 28 | 4 (14%) | $0.60 | $0.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Angel Brothers Holdings Corp. | 22 | 13 of 22 |
| Hunter Industries, LTD. | 22 | 17 of 22 |
| Dan Williams Company | 21 | 20 of 21 |
| Lone Star Sitework, LLC | 14 | 10 of 14 |
| Altus Construction LLC | 10 | 5 of 10 |
| Jordan Foster Construction, LLC | 10 | 9 of 10 |
| Joe Bland Construction, L.P. | 10 | 8 of 10 |
| Capital Excavation Company | 9 | 6 of 9 |
| Acme Bridge Company, Inc. | 8 | 4 of 8 |
| Texas Materials Group, Inc. | 8 | 8 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 AUG 2022 | 08223012 | Austin District | RM 12 Widen road - add lanes from HUGO RD to PIONEER TRAIL | 7 of 7 | $5,707,280 | +12% |
| 03 AUG 2022 | 08223041 | Austin District | RM 32 Intersection improvement from AT PURGATORY RD | 4 of 5 | $1,172,300 | +9.0% |
| 30 JUN 2022 | 06223627 | Austin District | SL 275 Install traffic signal from AT RAMBLE LN | 3 of 3 | $2,100,927 | +59% |
| 07 APR 2022 | 04223206 | Austin District | US 290 Hazard elimination & safety from EAST OF OLD SAN ANTONIO RD to 1.913 MILES EAST OF RM 1376 | 6 of 6 | $14,915,272 | +22% |
| 06 APR 2022 | 04223027 | Austin District | SH 80 Widen road - add shoulders from SH 21 to CR 266 CALDWELL COUNTY LINE | 6 of 6 | $9,768,163 | +37% |
| 04 FEB 2022 | 02223214 | Austin District | FM 1626 Hazard elimination & safety from SOUTH 1ST STREET to SOMBRERO DRIVE | 3 of 5 | $2,660,342 | +16% |
| 04 FEB 2022 | 02223220 | Austin District | FM 973 Bicycle and pedestrian improvements from WEST OF SH 130 to EAST OF SH 130 | 3 of 3 | $1,647,725 | +70% |
| 07 JAN 2022 | 01223209 | Austin District | RM 150 Hazard elimination & safety from 0.157 MI. EAST OF OAK SPRINGS DRIVE to 2.098 MI. NORTH OF RM 1826 | 3 of 3 | $4,933,961 | +37% |
| 04 NOV 2021 | 11213208 | Austin District | SH 71 Roadway rehabilitation/reconstruction with no add from SPUR 191 to BLANCO/BURNET C/L | 7 of 7 | $12,014,540 | +37% |
| 04 NOV 2021 | 11213210 | Austin District | US 183 Hazard elimination & safety from 0.230 MILES NORTH OF CR 254 to 0.135 MILES NORTH OF LIVE OAK TRAIL | 1 of 2 | $6,654,422 | Low, 21% under the second |
| 02 SEP 2021 | 09213221 | Austin District | FM 969 Widen road - add lanes from FM 973 to HUNTERS BEND RD. | 6 of 6 | $12,341,442 | +38% |
| 02 SEP 2021 | 09214201 | Austin District | FM0020 Scour and erosion control from PLUM CREEK to PLUM CREEK | 8 of 8 | $1,132,915 | +68% |
| 04 AUG 2021 | 08213014 | Austin District | US 183 Rehabilitation of existing road from RM 1869 to COLE DRIVE | 7 of 8 | $6,578,517 | +14% |
| 04 AUG 2021 | 08213023 | Austin District | SH 29 Highway improvement from 0.3 MILES WEST OF RM 2241 to 3.8 MILES EAST OF RM 2241 | 4 of 4 | $11,507,586 | +56% |
| 04 AUG 2021 | 08213027 | Austin District | IH 35 Construct pedestrian infrastructure from GREENLAWN BOULEVARD to FM 1825 | 8 of 9 | $5,686,002 | +96% |
| 04 AUG 2021 | 08213031 | Austin District | FM 621 Widen road - add lanes from WEST OF DE ZAVALA DRIVE to EAST OF CR 266 OLD BASTROP HWY | 9 of 9 | $5,241,444 | +77% |
| 04 AUG 2021 | 08213061 | Austin District | IH 35 Highway improvement from US 79 to SH 45N | 5 of 5 | $12,239,421 | +31% |
| 02 JUL 2021 | 07213242 | Austin District | RM 2243 Install/upgrade roadway lighting from AT ESCALERA PARKWAY | 2 of 2 | $495,329 | +6.0% |
| 01 JUL 2021 | 07213035 | Austin District | RM 1431 Install/upgrade roadway lighting from AT W. REED PARK ROAD | 3 of 3 | $1,750,507 | +44% |
| 01 JUL 2021 | 07213038 | Austin District | US 290 Intersection improvements with right and/or left from AT MARTIN ROAD | 4 of 9 | $1,600,246 | +18% |
| 05 MAY 2021 | 05213018 | Austin District | US 183 Intersection improvements with right and/or left from 0.08 MI SOUTH OF LAVA HILL RD to 0.11 N OF MCKENZIE INTERSECTION | 5 of 6 | $3,591,361 | +26% |
| 08 APR 2021 | 04213217 | Austin District | FM 696 Roadway rehabilitation/reconstruction from FM 112 to SL 123 | 5 of 5 | $3,204,668 | +46% |
| 08 APR 2021 | 04213232 | Austin District | SL 1 Construction of new ramp & intersection improvemt from DUVAL ROAD to 0.8 MILES WEST OF DUVAL ROAD | 2 of 5 | $1,667,420 | +9.0% |
| 04 FEB 2021 | 02213011 | Austin District | FM 971 Adding shoulders with no added capacity from SH 130 to 6.704 MILES EAST OF SH 130 | 13 of 13 | $11,958,076 | +42% |
| 04 FEB 2021 | 02213025 | Austin District | US 290 Intersection improvements with right and/or left from AT MARTIN ROAD | 3 of 9 | $1,390,464 | +27% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.