TxDOT letting results, August 3, 2022
45 contracts let by Texas DOT on August 3, 2022, $356,626,752 in low bids, a median of 4 bidders per contract. On the 45 with an engineer's estimate, the low bid came in under it 14 times; median low bid +7.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 45
- Low bids, total
- $356,626,752
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 08223002 | SH 36 Widen road - add lanes from NORTH OF CR 467/HOGG RANCH RD to SH 35 | Houston District | 4 | Webber, LLC | $113,599,269 | $115,744,402 | +2.0% | +5.0% | TxDOT |
| 08223004 | SH 288 Construct bridge from AT CR 57 | Houston District | 4 | Granite Construction Company | $57,486,751 | $58,759,521 | +2.0% | -7.0% | TxDOT |
| 08223005 | FM 16 Widen road - add lanes from 4 MI W OF FM 849 (CR481-E), E to US 69 IN LINDALE | Tyler District | 4 | Highway 19 Construction LLC | $44,362,527 | $45,161,963 | +2.0% | +24% | TxDOT |
| 08223006 | US 380 Bridge replacement from SALT FORK BRAZOS RIVER | Abilene District | 3 | Earth Builders, L.P. | $14,662,526 | $18,693,987 | +27% | -12% | TxDOT |
| 08223007 | IH 35W Reconstruct existing roadway from CR 604/CR707 to US 67 | Fort Worth District | 5 | Ed Bell Construction Company | $13,369,086 | $13,495,250 | +1.0% | +27% | TxDOT |
| 08223016 | IH 35W Rehabilitate existing roadway from ALTAMESA BLVD to LUELLA ST | Fort Worth District | 2 | O. Trevino Construction, LLC | $10,273,783 | $11,573,633 | +13% | +3.0% | TxDOT |
| 08223010 | FM 624 Surfacing/roadway restoration from JIM WELLS COUNTY LINE to FM 666 | Corpus Christi District | 5 | Haas-Anderson Construction, LTD. | $10,116,593 | $10,963,396 | +8.0% | -20% | TxDOT |
| 08223014 | US 181 Resurface roadway from SAN PATRICIO COUNTY LINE to CR 519 | Corpus Christi District | 3 | Haas-Anderson Construction, LTD. | $9,794,886 | $10,367,534 | +6.0% | -17% | TxDOT |
| 08223017 | US 190 Preventive maintenance from SAN SABA C/L to US 183 | Brownwood District | 4 | Big Creek Construction, LTD. | $6,287,281 | $6,982,302 | +11% | +15% | TxDOT |
| 08223011 | VA Hazard elimination & safety from VARIOUS LOCATIONS ON IH 610 & SL 8 | Houston District | 2 | Select Maintenance, L.L.C. | $5,909,098 | $6,838,000 | +16% | +7.0% | TxDOT |
| 08223043 | SH 171 Hazard elimination & safety from JOHNSON COUNTY LINE to FM 2719 | Waco District | 2 | Bear Creek Contracting, LLC | $5,859,953 | $7,547,890 | +29% | -4.0% | TxDOT |
| 08223008 | BS 6-R Install raised median from FM 158 to FM 60 | Bryan District | 4 | Brazos Paving, Inc. | $5,236,845 | $5,506,567 | +5.0% | +10% | TxDOT |
| 08223012 | RM 12 Widen road - add lanes from HUGO RD to PIONEER TRAIL | Austin District | 7 | Dan Williams Company | $5,093,343 | $5,188,430 | +2.0% | +23% | TxDOT |
| 08223013 | FM 917 Hazard elimination & safety from CR 806 to IH 35W | Fort Worth District | 4 | Jay Mills Contracting, Incorporated | $4,410,629 | $5,154,585 | +17% | +7.0% | TxDOT |
| 08223018 | FM 1785 Widen road - add shoulders from HOWARD COUNTY to FM 669 | Abilene District | 3 | Gilvin-Terrill, LTD. | $4,392,391 | $4,561,490 | +4.0% | +34% | TxDOT |
| 08223015 | FM 865 Surfacing/roadway restoration from OLD SPANISH TRAIL (US 90A) to HOLMES ROAD | Houston District | 3 | Texas Materials Group, Inc. | $3,261,337 | $4,988,406 | +53% | -50% | TxDOT |
| 08223020 | IH 610 Bridge replacement from IH 610 SB FRONTAGE RD AT BRAYS BAYO | Houston District | 3 | Harper Brothers Construction LLC | $3,121,847 | $3,277,738 | +5.0% | +47% | TxDOT |
| 08223019 | FM 76 Hazard elimination & safety from AT N YARBROUGH DR | El Paso District | 1 | Tri State Electric, LTD. | $2,492,426 | +9.0% | TxDOT | ||
| 08223033 | UA 90 Hazard elimination & safety from FM 3238 to COLORADO C/L | Yoakum District | 2 | Hill Country Bridge, Inc. | $2,404,305 | $2,960,877 | +23% | +78% | TxDOT |
| 08223027 | BS 31-H Construct pedestrian infrastructure from SOUTH CARROLL STREET to FM 2495 (FLAT CREEK RD) | Tyler District | 3 | Highway 19 Construction LLC | $2,266,624 | $2,349,154 | +4.0% | +11% | TxDOT |
| 08223037 | SH 64 Intersection improvements with right and/or left from AT CR 289 (WOLFE LN) | Tyler District | 4 | L. S. Equipment Co., Inc. | $2,208,247 | $2,213,323 | 0.0% | +25% | TxDOT |
| 08223028 | US 80 Installation of traffic signals and sidewalks from VARIOUS LOCATIONS IN THE CITY OF to DALLAS AND KAUFMAN COUNTY | Dallas District | 3 | Durable Specialties, Inc. | $2,155,024 | $2,430,413 | +13% | +32% | TxDOT |
| 08223030 | US 54 Hazard elimination & safety from 0.22 MI SW OF STATE LINE RD to 0.015 MI NE OF STATE LINE RD | El Paso District | 6 | Del Mar Contracting, Inc. | $2,140,781 | $2,184,997 | +2.0% | +52% | TxDOT |
| 08223045 | FM 436 Hazard elimination & safety from SH 95 to BU190J | Waco District | 5 | Pierce R & B LLC | $2,084,782 | $2,115,898 | +1.0% | +10% | TxDOT |
| 08223024 | US 287 Intersection improvements with right and/or left from 0.1 MI W OF FM 488 to 0.1 MI E OF FM 488 | Bryan District | 3 | Big Creek Construction, LTD. | $2,078,845 | $2,140,930 | +3.0% | +24% | TxDOT |
| 08223025 | SH 114 Hazard elimination & safety from US 385 to LUBBOCK COUNTY LINE | Lubbock District | 3 | Digg Commercial, LLC | $1,890,330 | $2,738,083 | +45% | +1.0% | TxDOT |
| 08223021 | FM 1774 Hazard elimination & safety from FM 1488 to SH 249 | Houston District | 7 | Third Coast Services LLC | $1,870,036 | $1,914,623 | +2.0% | -30% | TxDOT |
| 08223032 | FS 357 Hazard elimination & safety from END OF PAVEMENT to FM 357/FM 233 | Lufkin District | 4 | Cornerstone Paving and Construction, L.L.C. | $1,648,548 | $1,654,633 | 0.0% | +25% | TxDOT |
| 08223026 | US 90 Hazard elimination & safety from SH 146(W), EAST to 0.44 MI E OF FM 1409 | Beaumont District | 4 | Vulcan Materials Asphalt and Construction, LLC | $1,615,491 | $1,976,788 | +22% | -19% | TxDOT |
| 08223038 | US 271 Hazard elimination & safety from 0.25 MI NORTH OF STONE AVE to W SANTA FE | Paris District | 3 | Ti-Zack Concrete, LLC | $1,434,042 | $1,493,609 | +4.0% | +14% | TxDOT |
| 08223039 | SL 301 Bridge replacement from SL 301 (PIPELINE RD) to AT TOWN BRANCH | Paris District | 4 | Highway 19 Construction LLC | $1,347,539 | $1,452,649 | +8.0% | -3.0% | TxDOT |
| 08223022 | SH 359 Construct pedestrian infrastructure from SL 20 to CONCORD HILLS BLVD. | Laredo District | 2 | B & MS Construction, Inc. | $1,341,138 | $1,509,552 | +13% | +13% | TxDOT |
| 08223031 | FM 907 Traffic signal improvements from 0.1 MILES NORTH OF MILE 17 1/2 N. R to 0.1 MILES SOUTH OF MILE 17 1/2 N RD | Pharr District | 5 | D&G Energy Corporation | $1,313,573 | $1,393,187 | +6.0% | +5.0% | TxDOT |
| 08223029 | IH 35 Hazard elimination & safety from US 57 to FRIO/MEDINA CO LINE | San Antonio District | 5 | Dan Williams Company | $1,300,000 | $1,336,599 | +3.0% | -19% | TxDOT |
| 08223023 | SH 3 Hazard elimination & safety from HARRIS C/L to FM 646 | Houston District | 2 | Main Lane Industries LTD. | $1,131,154 | $1,828,578 | +62% | -12% | TxDOT |
| 08223041 | RM 32 Intersection improvement from AT PURGATORY RD | Austin District | 5 | Lone Star Sitework, LLC | $1,073,850 | $1,094,332 | +2.0% | +13% | TxDOT |
| 08223040 | VA Intersection improvement from VARIOUS LOCATIONS DISTRICTWIDE to VARIOUS LOCATIONS DISTRICTWIDE | Lufkin District | 2 | Allstate Signal & Construction, LLC | $899,492 | $1,057,938 | +18% | +1.0% | TxDOT |
| 08223042 | CR Bridge replacement from CR 1590 AT BIG SANDY CREEK | Fort Worth District | 3 | Wesson Construction Services, LLC | $883,443 | $1,013,418 | +15% | +30% | TxDOT |
| 08223035 | US 281 Landscape development | San Antonio District | 4 | Yellowstone Landscape - Central, Inc. | $880,181 | $942,297 | +7.0% | -10% | TxDOT |
| 08223050 | CS Hazard elimination & safety from CALDER AVENUE to SARAH STREET | Beaumont District | 4 | Vaca Underground Utilities Inc | $850,170 | $872,790 | +3.0% | +23% | TxDOT |
| 08223034 | SL 109 Construct pedestrian infrastructure from SL 109 to W CLEVELAND ST | Austin District | 3 | Encino Landscape, Inc. | $668,750 | $746,462 | +12% | 0.0% | TxDOT |
| 08223044 | VA Intersection improvement from FY 2025 DISTRICTWIDE to PREVENTIVE MAINT | Waco District | 1 | Vaca Underground Utilities Inc | $454,340 | -5.0% | TxDOT | ||
| 08223009 | CS Hazard elimination & safety from AT BELMONT ST | Odessa District | 3 | FNH Construction, LLC | $418,688 | $448,473 | +7.0% | +103% | TxDOT |
| 08223046 | SS 290 Install pedestrian crosswalk, install sidewalks from AVE M to AVE R | Waco District | 5 | Cross Plus Construction, LLC | $384,376 | $404,174 | +5.0% | 0.0% | TxDOT |
| 08223051 | FM 2257 Install illumination from SH 199 to FM 730 | Fort Worth District | 5 | Highway Intelligent Traffic Solutions, Inc. | $152,432 | $207,204 | +36% | -32% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.