Encino Landscape, Inc.: TxDOT bid record
Encino Landscape, Inc. submitted 141 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 08 AUG 2025, and was the low bidder on 24 of them (17%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $28,302,773
- Latest bid
- 08 AUG 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 35 | 7 | 20% |
| 2021 | 33 | 6 | 18% |
| 2022 | 23 | 4 | 17% |
| 2023 | 19 | 3 | 16% |
| 2024 | 25 | 4 | 16% |
| 2025 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 15 | 5 | 33% |
| Austin District | 15 | 2 | 13% |
| Yoakum District | 12 | 2 | 17% |
| Fort Worth District | 12 | 3 | 25% |
| Bryan District | 11 | 1 | 9% |
| Tyler District | 11 | 2 | 18% |
| Waco District | 11 | 2 | 18% |
| Dallas District | 7 | 0 | 0% |
| Paris District | 7 | 2 | 29% |
| Lufkin District | 6 | 0 | 0% |
| Atlanta District | 6 | 0 | 0% |
| Houston District | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Vegetative watering | 168-7001 | MG | 77 | 59 (77%) | $10.00 | $29.97 |
| Block sodding | 162-7002 | SY | 72 | 45 (63%) | $4.00 | $6.20 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 77 | 42 (55%) | $1.00 | $1.40 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 97 | 33 (34%) | $1.00 | $1.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 48 | 24 (50%) | $2.00 | $3.00 |
| Concrete curb & gutter (type II) | 529-7009 | LF | 55 | 21 (38%) | $35.00 | $42.58 |
| Barricades, signs and traffic handling | 502-7001 | MO | 139 | 20 (14%) | $5,000.00 | $5,000.00 |
| Driveways (concrete) | 530-7006 | SY | 54 | 20 (37%) | $100.00 | $110.00 |
| TMA (stationary) | 505-7001 | DAY | 99 | 18 (18%) | $300.00 | $230.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 95 | 18 (19%) | $5.00 | $4.00 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 50 | 14 (28%) | $5.00 | $6.00 |
| Sandbags for erosion control | 506-7035 | EACH | 22 | 14 (64%) | $3.00 | $10.66 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ti-Zack Concrete, LLC | 54 | 34 of 54 |
| FNH Construction, LLC | 53 | 11 of 53 |
| Highway 19 Construction LLC | 27 | 20 of 27 |
| Altus Construction LLC | 18 | 3 of 18 |
| SJ&J Construction, LLC | 18 | 8 of 18 |
| 3LW Civil LLC | 18 | 14 of 18 |
| Tight Line Construction, LLC | 17 | 4 of 17 |
| Apex Landscape & Irrigation, LLC | 17 | 8 of 17 |
| Project Allied Resources, LLC | 16 | 9 of 16 |
| Hodges and Son Construction Company, Inc. | 15 | 9 of 15 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 AUG 2025 | A00207123 | Lufkin District | Construct Pedestrian Infrastructure, SH 150 (SH 156 to Coldspring-Oakhurst High School) | 10 of 11 | $2,052,201 | +52% |
| 02 JUL 2025 | A00208137 | Waco District | Landscape Development, US 84 (@ Poage Dr to @ Poage Dr) | 2 of 3 | $166,570 | 0.0% |
| 02 JUL 2025 | A00206903 | Yoakum District | Construct Pedestrian Infrastructure, Various (SH 60 (Milam St) to FM 1301 (Boling Hwy)) | 5 of 8 | $3,591,172 | +21% |
| 01 JUL 2025 | A00212752 | Austin District | Landscape Development, GREENLEE DR (At Tippit Middle School to .) | 2 of 5 | $1,404,435 | +25% |
| 05 JUN 2025 | A00187707 | Bryan District | Construct Pedestrian Infrastructure, FM 2818 (0.5 Mi E of FM 2154 to 0.1 mi E of Welsh Ave) | 9 of 10 | $2,049,715 | +15% |
| 05 JUN 2025 | A00206896 | Yoakum District | Construct Pedestrian Infrastructure, Various (First St/Railroad St (Adjacent to SH 71) to Main St/North Liberty St (on BU 59S)) | 3 of 6 | $2,205,475 | +4.0% |
| 06 JUN 2024 | 06243245 | Corpus Christi District | SH 359 Construct pedestrian infrastructure from 1,000 FEET WEST OF WENDT ST to 600 FEET EAST OF W MENDOZA AVE | 4 of 6 | $850,613 | +30% |
| 06 JUN 2024 | 06243254 | Yoakum District | CS Hazard elimination & safety from SL 463 to FM 1315 | 4 of 5 | $635,841 | +26% |
| 06 JUN 2024 | 06243255 | Waco District | US 84 Install raised median from 6TH ST to 8TH ST | 1 of 3 | $299,986 | Low, 55% under the second |
| 05 JUN 2024 | 06243026 | Tyler District | BS 19-J Construct pedestrian infrastructure from BEN BELT DR to HILLSIDE DR | 7 of 9 | $3,383,983 | +30% |
| 03 MAY 2024 | 05243233 | Wichita Falls District | BU 287J Construct pedestrian infrastructure from SL 11 to IH 44 NBFR | 2 of 4 | $1,164,108 | +13% |
| 03 MAY 2024 | 05243235 | Paris District | SH 5 Construct pedestrian infrastructure from WILLIAMS WAY to E VAN ALSTYNE PKWAY (FM 121) | 1 of 7 | $1,226,270 | Low, 1.0% under the second |
| 03 MAY 2024 | 05243237 | Pharr District | VA Bicycle and pedestrian improvements from ROBERTO GARZA (NOPALEZ) to EBONY ST. | 6 of 6 | $3,081,073 | +54% |
| 03 MAY 2024 | 05243239 | San Antonio District | PR 29A State park improvements from ON PR 29A to IN GARNER STATE PARK | 2 of 4 | $1,560,859 | +15% |
| 03 MAY 2024 | 05243241 | San Antonio District | US 90 Landscape development from 0.27 MILES EAST OF 36TH ST to 1.66 MILES WEST OF 36TH ST | 3 of 5 | $534,938 | +10% |
| 02 MAY 2024 | 05243039 | San Antonio District | CS Construct pedestrian infrastructure from D L VEST STREET to TO FM 1346 SIDEWALKS | 5 of 9 | $869,750 | +39% |
| 05 APR 2024 | 04243208 | San Antonio District | FM 306 Bicycle and pedestrian improvements from GUADALUPE RIVER- EASTERN CROSSSING to GUADALUPE RIVER- WESTERN CROSSING | 1 of 6 | $7,171,216 | Low, 11% under the second |
| 05 APR 2024 | 04243210 | Houston District | SH 242 Install/upgrade drainage structure(s) from NEEDHAM DRIVE to IH 69 | 3 of 11 | $9,715,908 | +19% |
| 05 APR 2024 | 04243225 | Austin District | US 77 Bridge maintenance from 200 FT N OF ELM CREEK to 200 FT S OF ELM CREEK | 4 of 7 | $1,598,422 | +25% |
| 04 APR 2024 | 04243014 | Austin District | IH 35 Landscape development from SAN GABRIEL RIVER to NORTHWEST BLVD | 2 of 3 | $4,475,649 | +41% |
| 04 APR 2024 | 04243021 | San Antonio District | BI 35-E Hazard elimination & safety from 0.3 MI N OF FIELDS ST to E FLORIDA ST | 5 of 6 | $2,541,704 | +21% |
| 04 APR 2024 | 04243023 | Odessa District | VA Bridge maintenance from DISTRICTWIDE | 6 of 9 | $2,348,916 | +27% |
| 04 APR 2024 | 04243024 | Waco District | SH 164 Bicycle and pedestrian improvements from N. DOUGLAS ST. to N. FRONT ST. | 3 of 6 | $1,732,844 | +20% |
| 04 APR 2024 | 04243028 | Paris District | VA Bridge maintenance from VARIOUS LOCATIONS | 3 of 5 | $1,099,778 | +27% |
| 04 APR 2024 | 04243029 | Austin District | IH 35 Landscape development from WINDY HILL RD to YARRINGTON RD | 2 of 4 | $469,242 | +8.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.