Project Allied Resources, LLC: TxDOT bid record

Project Allied Resources, LLC submitted 51 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 03 JUN 2026, and was the low bidder on 7 of them (14%). When it was not low, its total sat a median +25% above the low bid.

Owner
Texas DOT
Low bid volume
$12,805,278
Latest bid
03 JUN 2026
Data through
19 NOV 2026
51Bids
7Low bids
14Win rate, percent
+25%Median gap to the low bid when not low, 44 bids

By year

YearBidsLow bidsWin rate
202010110%
202113215%
202210330%
202311100%
20241300%
2025300%
2026100%
Project Allied Resources, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Beaumont District9333%
Waco District7114%
Brownwood District600%
Yoakum District5120%
Bryan District500%
Paris District500%
Abilene District4125%
Lufkin District2150%
Fort Worth District200%
Atlanta District100%
Dallas District100%
Corpus Christi District100%
Project Allied Resources, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY3310 (30%)$202.00$230.00
Preparing row100-7002STA318 (26%)$2,860.00$2,750.00
Removing concrete (driveways)104-7011SY157 (47%)$17.00$21.00
Furnishing and placing topsoil (4")160-6003SY147 (50%)$1.95$3.00
Vegetative watering168-7001MG415 (12%)$70.00$29.97
Excavation (roadway)110-7001CY325 (16%)$27.35$20.00
Broadcast seed (temporary) (cool)164-6011SY115 (45%)$0.76$0.30
Portable changeable message sign503-7002EACH194 (21%)$9,130.00$10,000
Broadcast seed (temporary) (warm)164-6009SY114 (36%)$0.99$0.30
Driveways (ACP)530-7010SY94 (44%)$72.00$60.00
Barricades, signs and traffic handling502-7001MO513 (6%)$3,840.00$5,000.00
Install delineator assembly (D-SW)SZ (BRF)CTB (BI)658-6014EACH203 (15%)$32.55$25.00
Project Allied Resources, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Project Allied Resources, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 JUN 2026A00206315Brownwood DistrictConstruct Pedestrian Infrastructure, Various (Various locations in City of Coleman to .)4 of 4$3,040,500+39%
04 MAR 2025A00133339Fort Worth DistrictBridge Replacement, COUNTY ROAD 270 (CR 270 AT TRIBUTARY TO NORTH BOSQUE to .)5 of 8$1,529,611+8.0%
06 FEB 2025A00138685Wichita Falls DistrictBridge Replacement, SH 25 (SH 25 to At Middle Fork Little Wichita River)2 of 7$6,619,747+2.0%
08 JAN 2025A00190132Beaumont DistrictBridge Replacement, COUNTY ROAD 139 (CR 139 @ BIG SANDY CREEK to EXISTING (STR#201220AA0291002))8 of 8$2,275,338+15%
03 DEC 2024A00194464Brownwood DistrictBridge Replacement, COUNTY ROAD 508 (CR 508 at Draw to .)8 of 9$2,066,790+41%
06 NOV 2024A00197743Paris DistrictConstruct Pedestrian Infrastructure, BU 271B (18th SE to 34th SE)3 of 9$2,357,714+6.0%
10 JUL 202407243229San Angelo DistrictCS Construct pedestrian infrastructure from VARIOUS LOCATIONS IN ELDORADO, TEXA3 of 8$886,198+15%
09 JUL 202407243025Childress DistrictCR Bridge replacement and approaches from @ BEAVER CREEK5 of 6$1,076,566+54%
06 JUN 202406243237Abilene DistrictSH 176 Bridge replacement from AT SULPHUR SPRINGS DRAW4 of 5$3,131,365+31%
03 MAY 202405243232Beaumont DistrictCR Bridge replacement from W.PINESHADOWS @ CLEMMONS GULLY to STR# 201010AA10650013 of 3$4,665,504+22%
04 APR 202404243013Abilene DistrictUS 277 Bridge replacement from US 277 NB to PAINT CREEK4 of 6$5,740,155+23%
04 APR 202404243024Waco DistrictSH 164 Bicycle and pedestrian improvements from N. DOUGLAS ST. to N. FRONT ST.6 of 6$1,893,267+31%
06 MAR 202403243211Brownwood DistrictCR Bridge replacement from CR 260 AT SOUTH LEON RIVER2 of 3$4,738,006+24%
05 MAR 202403243036Fort Worth DistrictCS Construct pedestrian infrastructure from ON BAILEY RANCH FROM HS to FM 11879 of 10$659,417+41%
02 FEB 202402243242Bryan DistrictFM 46 Bridge replacement from AT CEDAR CREEK5 of 9$2,106,646+20%
01 FEB 202402243034Paris DistrictCR Bridge replacement from AT ELBA CREEK to , ETC.6 of 7$2,040,560+28%
05 JAN 202401243227Abilene DistrictFM 576 Bridge replacement from FM 576 to AT DEEP CREEK2 of 4$2,785,968+15%
02 JUN 202306233224Abilene DistrictUS 283 Bridge replacement from @ CLEAR CREEK1 of 3$3,377,698Low, 4.0% under the second
01 DEC 202212223026Waco DistrictCR Bridge replacement from CR 274 @ CLEAR CREEK to (MAP #029)5 of 5$967,361+44%
02 NOV 202211223017Beaumont DistrictVA Construct pedestrian infrastructure from ON FM 2799 FROM MAIN ST. to PARK LANE2 of 4$1,462,429+5.0%
02 NOV 202211223021Waco DistrictCR Bridge replacement from CR 118 @ GARY CREEK to (MAP #007)3 of 4$1,080,121+35%
07 SEP 202209223023Yoakum DistrictVA Construct pedestrian infrastructure from VARIOUS LOCATION IN CITY OF WHARTON4 of 4$839,920+26%
30 JUN 202206223628Beaumont DistrictFM 364 Hazard elimination & safety from 300' N OF SPURLOCK, SOUTH to SH 1053 of 3$1,442,474+66%
29 JUN 202206223436Beaumont DistrictCR Bridge replacement from CR 101 AT FLAT CYPRESS CREEK to (STR 201010AA0101001)1 of 3$937,939Low, 6.0% under the second
07 APR 202204223220Beaumont DistrictVA Construct pedestrian infrastructure from ON FM 2799 FROM MAIN ST. to PARK LANE1 of 3$1,571,675Low, 3.0% under the second
Project Allied Resources, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy