TxDOT contract A00138685 bid tabulation

Bridge Replacement, SH 25 (SH 25 to At Middle Fork Little Wichita River). Let by Texas DOT on February 6, 2025, Archer, Wichita Falls District. 7 bids received; low bid $6,506,472 by Altus Construction LLC, -5.1% against the engineer's estimate of $6,856,853.

Owner
Texas DOT
Letting
06 FEB 2025
Pay items
91
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Altus Construction LLC$6,506,472Low-5.0%
2Project Allied Resources, LLC$6,619,747+2.0%-3.0%
3MP Heavy Construction Inc$6,794,460+4.0%-1.0%
4THK Construction LLC$6,840,236+5.0%0.0%
5A. L. Helmcamp, Inc.$8,717,606+34%+27%
6Earth Builders, L.P.$8,762,932+35%+28%
7Hodges and Son Construction Company, Inc.$9,279,389+43%+35%
TxDOT contract A00138685: bids by rank

Engineer's estimate: $6,856,853.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Altus Construction LLC2. Project Allied Resources, LLC3. MP Heavy Construction Inc4. THK Construction LLC5. A. L. Helmcamp, Inc.6. Earth Builders, L.P.
1Preparing row (100-7002)STA19.70$7,350.00$32,698$3,000.00$13,200$11,700$5,000.00$10,000
2Removing concrete (riprap) (104-7006)SY390$33.39$8.70$45.00$25.00$48.00$20.00
3Remove (7"-13") TRT/untrt base & asphalt pavement (105-7058)SY3,323$13.00$13.35$16.00$13.00$25.00$16.00$20.00
4Excavation (roadway) (110-7001)CY959$28.00$19.86$16.70$32.00$25.00$35.00$25.00
5Excavation (channel) (110-7002)CY985$30.00$23.87$26.10$32.00$25.00$40.00$25.00
6Embankment (final)(OC)(type C) (132-7005)CY15,329$18.00$15.60$26.10$45.00$25.00$47.00$45.00
7Drill seed (permanent_rural_sand) (164-7041)ACRE0.58$1,000.00$0.29$11,400$12,414$11,380$6,300.00$6,000.00
8Drill seed (temporary_warm_cool) (164-7047)ACRE0.58$3,000.00$425.18$5,680.00$12,414$11,380$6,300.00$6,000.00
9Vegetative watering (168-7001)TGL41$27.00$30.53$84.00$56.00$100.00$50.00$50.00
10Soil retention blankets (CL 1) (type B) (169-7043)SY8,526$1.10$1.10$2.10$2.40$2.20$2.50$3.00
11Cement (275-7001)TON85$400.00$229.54$254.00$270.67$400.00$320.00$500.00
12Cement treat (subgrade) (8") (275-7017)SY6,537$8.00$4.03$6.90$4.50$22.00$12.00$20.00
13Prime coat (MC-30) (310-7004)GAL1,502$6.00$6.68$12.00$9.42$29.09$10.00$25.00
14D-GR HMA type-B PG64-22 (341-7001)TON2,113$108.96$111.85$149.00$121.34$206.98$160.00$230.00
15D-GR HMA type D sac-B PG70-28 (341-7054)TON674$180.00$193.29$172.00$128.00$329.89$225.00$320.00
16Struct excavation (box) (400-7002)CY342$41.73$14.50$30.00$25.00$30.00$25.00
17Cut & restore asphalt paving (400-7008)SY96$184.67$126.00$172.50$150.00$215.00$225.00
18Cem stabil BKFL (400-7010)CY132$120.00$187.80$385.00$230.00$350.00$300.00$400.00
19Flowable backfill (401-7001)CY68$375.60$385.00$362.80$300.00$270.00$400.00
20Trench excavation protection (402-7001)LF50$5.56$1,010.00$39.43$20.00$95.00$1.00
21Temporary special shoring (403-7001)SF950$23.00$33.39$63.00$49.95$40.00$120.00$30.00
22Drilled shaft (36 in) (416-7006)LF1,645$330.00$231.08$280.00$288.00$251.07$400.00$330.00
23Class C concrete (abutment)(HPC) (420-7013)CY89.80$1,050.00$1,857.06$1,680.00$1,295.00$1,400.00$3,200.00$2,400.00
24Class C concrete (cap)(HPC) (420-7023)CY107$2,000.00$1,625.43$1,940.00$1,295.00$1,500.00$2,700.00$2,400.00
25Class C concrete (column)(HPC) (420-7039)CY51.80$1,510.00$1,567.12$1,750.00$1,687.00$2,500.00$2,700.00$2,400.00
26Reinforced concrete slab (box beam)(HPC) (422-7006)SF18,639$45.00$21.81$22.10$24.65$24.00$45.00$35.00
27Approach slab (HPC) (422-7014)CY136$865.00$991.16$763.00$480.00$900.00$1,600.00$1,400.00
28Shear key (422-7020)CY89.60$650.00$542.54$343.00$480.00$750.00$850.00$2,000.00
29Prestressed concrete X-beam (4XB20) (425-7034)LF2,499$295.00$296.39$322.00$269.21$309.32$320.00$350.00
30Prestressed concrete X-beam (5XB20) (425-7035)LF1,666$325.34$310.80$322.00$269.21$309.32$330.00$350.00
31Penetrating concrete surface treatment (428-7001)SY108$10.00$25.04$139.00$12.84$20.00$40.00$20.00
32Riprap (mow strip)(4 in) (432-7013)CY118$525.00$481.73$677.00$525.00$800.00$1,000.00$550.00
33Riprap (stone protection)(12 in) (432-7041)CY1,589$212.00$128.92$201.00$120.12$130.00$140.00$240.00
34Riprap (stone protection)(18 in) (432-7043)CY113$236.00$211.00$132.13$150.00$200.00$250.00
35Rail (type T223)(HPC) (450-7009)LF904$130.00$129.17$176.00$149.35$180.00$280.00$200.00
36Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF178$220.00$271.23$316.00$220.35$250.00$300.00$270.00
37Concrete box culvert (9 FT X 6 FT) (462-7028)LF118$1,172.13$1,730.00$1,032.04$1,400.00$1,850.00$1,800.00
38Wingwall (PW - 2) (HW=8 FT) (466-7192)EACH2$14,587$45,300$25,000$65,000$62,000$50,000
39Removing structure (box culvert) (496-7001)EACH1$5,564.50$26,400$4,833.33$20,000$40,000$65,000
40Removing structure (wingwall) (496-7005)EACH2$2,086.69$2,500.00$2,421.25$2,000.00$20,000$30,000
41Removing structure (bridge 100 - 499 FT length) (496-7010)EACH2$130,000$72,943$81,000$76,800$25,000$90,000$95,000
42Mobilization (500-7001)LS1$639,440$647,396$662,000$1,207,500$600,000$650,000$800,000
43Barricades, signs and traffic handling (502-7001)MO19$10,500$15,302$3,280.00$3,498.69$1,875.39$10,500$5,000.00
44Portable changeable message sign (503-7002)EACH6$12,100$18,808$6,560.00$13,500$20,000$15,000$18,000
45TMA (stationary) (505-7001)DAY10$220.00$185.52$265.00$350.00$350.00$300.00$350.00
46TMA (mobile operation) (505-7003)DAY20$200.00$208.67$233.00$450.00$350.00$650.00$650.00
47Rock filter dams (install) (type 1) (506-7001)LF158$37.00$33.39$48.00$38.40$27.50$60.00$65.00
48Rock filter dams (install) (type 2) (506-7002)LF32$45.32$53.00$55.20$55.00$70.00$75.00
49Rock filter dams (remove) (506-7011)LF190$12.70$14.21$16.00$18.00$10.00$30.00$26.00
50Construction exits (install) (type 1) (506-7020)SY536$31.13$27.27$37.30$26.40$1.00$25.00$65.00
51Construction exits (remove) (506-7024)SY536$10.55$10.56$13.10$12.00$1.00$10.00$10.00
52Temporary sediment control fence (install) (506-7039)LF3,091$3.80$3.81$4.95$6.18$4.40$4.00$4.00
53Temporary sediment control fence (remove) (506-7041)LF3,091$1.00$1.15$1.41$1.26$1.10$2.00$2.00
54Biodegradable erosion control logs (install) (12") (506-7044)LF980$4.90$5.53$7.10$6.30$5.24$6.00$7.00
55Biodegradable erosion control logs (remove) (506-7046)LF980$1.00$1.67$1.87$1.80$1.10$2.00$2.00
56Constructing detours (508-7001)SY40$125.00$108.26$195.00$150.00$100.00$1,000.00$250.00
57One-way traffic control (port traffic signal) (510-7003)MO12$8,000.00$6,489.60$4,250.00$6,383.33$4,166.67$5,000.00$5,000.00
58Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF1,260$50.00$39.65$85.00$25.00$100.00$120.00$100.00
59Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF1,260$20.00$13.77$13.70$10.00$20.00$30.00$15.00
60Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF1,260$20.00$17.56$25.20$10.00$20.00$50.00$15.00
61Mill rumble strips (asphalt) (centerline) (533-7002)LF1,282$0.24$2.18$10.20$10.06$7.01$10.00$10.00
62Metal W-beam guard fence (timber post) (540-7001)LF850$25.00$23.95$24.80$27.00$24.75$27.00$26.00
63Metal beam guard fence trans (thrie-beam) (540-7005)EACH8$2,200.00$2,086.69$2,090.00$2,280.00$1,705.00$2,500.00$1,900.00
64Metal beam guard fence (long span system) (540-7027)EACH2$1,262.12$1,430.00$1,560.00$1,265.00$1,500.00$1,600.00
65Remove metal beam guard fence (542-7001)LF1,150$3.00$2.69$2.75$3.00$10.00$3.50$5.00
66Remove terminal anchor section (542-7002)EACH4$229.95$275.00$300.00$100.00$350.00$200.00
67Guardrail end treatment (install) (544-7001)EACH12$3,250.00$2,780.75$3,250.00$3,540.00$3,795.00$3,500.00$3,500.00
68Guardrail end treatment (remove) (544-7003)EACH8$300.00$267.10$275.00$300.00$100.00$350.00$400.00
69Crash cushion attenuator (move & reset) (545-7002)EACH4$2,200.00$1,373.04$2,130.00$2,000.00$2,750.00$3,500.00$3,500.00
70Crash cushion attenuator (remove) (545-7004)EACH4$1,716.00$834.68$1,280.00$1,200.00$1,100.00$3,500.00$1,200.00
71Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$8,765.00$7,679.01$7,220.00$8,000.00$9,735.00$12,000$12,000
72Wire fence (type C) (552-7003)LF200$20.00$25.04$42.80$78.00$30.00$23.00$30.00
73Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058)EACH8$600.00$490.37$749.00$786.00$1,000.00$750.00$1,500.00
74Remove SM RD SN sup&AM (644-7073)EACH4$95.99$163.00$174.00$250.00$100.00$150.00
75Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH12$28.00$30.05$24.20$22.20$19.80$50.00$25.00
76Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH31$39.00$31.43$26.40$25.80$27.50$60.00$45.00
77Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH4$75.12$152.00$126.00$110.00$150.00$75.00
78Remove delin & object marker assms (658-7078)EACH21$25.00$16.69$51.00$42.00$10.00$25.00$10.00
79Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH420$5.00$7.68$9.90$7.55$9.24$9.00$10.00
80Work zone pavement marking removing (W)6"(solid) (662-7068)LF8,560$0.80$1.64$2.18$1.41$1.65$2.00$2.00
81Work zone pavement marking removing (W)24"(solid) (662-7077)LF70$8.00$17.64$33.00$19.02$11.00$30.00$15.00
82Work zone pavement marking removing (Y)6"(solid) (662-7100)LF17,040$1.00$1.71$2.18$1.39$1.65$2.00$2.00
83Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF3,978$0.75$1.18$7.90$1.27$6.05$7.00$7.00
84Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF3,555$0.65$0.99$7.90$1.07$6.05$7.00$7.00
85Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF110$1.01$11.90$1.09$5.50$11.00$6.00
86Reflectorized pavement marker type II-A-A (672-7004)EACH61$4.00$9.76$23.70$10.52$11.00$21.00$12.00
87Traffic button type B (672-7009)EACH12$11.13$99.00$12.00$22.00$90.00$25.00
88Eliminating existing PM & markers (4") (677-7001)LF3,916$0.45$1.17$3.23$1.26$4.40$2.50$5.00
89Bonding course (3007-7001)GAL245$4.50$3.96$33.40$8.00$2.20$16.00$4.00
90Rem lead-containing coating (4" strip) (5011-7004)EACH216$160.00$255.55$46.60$212.11$260.24$270.00$200.00
91Rem lead-contatining coating (6" strip) (5011-7005)EACH48$260.00$312.54$46.60$245.70$343.30$370.00$200.00
TxDOT contract A00138685: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy