TxDOT letting results, December 3, 2024
31 contracts let by Texas DOT on December 3, 2024, $259,759,754 in low bids, a median of 4 bidders per contract. On the 31 with an engineer's estimate, the low bid came in under it 25 times; median low bid -11% against the estimate.
- Owner
- Texas DOT
- Contracts
- 31
- Low bids, total
- $259,759,754
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00138908 | Construct New Roadway Lanes, SH 5 (Stewart Road to Eldorado Parkway) | Dallas District | 4 | Webber, LLC | $157,359,015 | $176,408,934 | +12% | -17% | TxDOT |
| A00064689 | Seal Coat, FM 2834 (FM 1835 to FM 1661) | Abilene District | 5 | Lipham Asphalt and Paving Company, LLC | $14,844,601 | $15,491,645 | +4.0% | +3.0% | TxDOT |
| A00193205 | Seal Coat, BU 67V (IH 30 to SH 19) | Paris District | 2 | CDM Holdings | $14,548,149 | $15,127,976 | +4.0% | +10% | TxDOT |
| A00196124 | Install/Replace Signs, Various (Various Locations Districtwide to .) | Houston District | 6 | Select Maintenance, L.L.C. | $12,243,838 | $15,075,724 | +23% | -29% | TxDOT |
| A00195466 | Seal Coat, US 87 (Howard County line to Sterling County line) | San Angelo District | 2 | Cox Paving of Texas, Inc. | $8,400,199 | $9,004,388 | +7.0% | -8.0% | TxDOT |
| A00194653 | Preventive Maintenance, US 281 (Palo Pinto Co. Line to FM 8) | Fort Worth District | 3 | Northeastern Pavers, LLC | $6,375,558 | $6,428,717 | +1.0% | -2.0% | TxDOT |
| A00184481 | Hazard Elimination & Safety, IH 10 (RAYNOLDS ST to US 62) | El Paso District | 2 | Tri State Electric, LTD. | $6,226,703 | $6,674,935 | +7.0% | +3.0% | TxDOT |
| A00200845 | State Park Improvements, Various (PALO DURO CANYON STATE PARK to .) | Amarillo District | 5 | L A Fuller & Sons Construction, LTD. | $4,199,123 | $4,876,708 | +16% | -20% | TxDOT |
| A00207750 | Preventive Maintenance, FM 919 (Various Locations to Jack & Palo Pinto Counties) | Fort Worth District | 7 | A. L. Helmcamp, Inc. | $4,012,954 | $4,165,475 | +4.0% | -1.0% | TxDOT |
| A00140315 | Intersection Improvement, IH 610 (Market St. to 0.25 Mi W. of Mercury Dr.) | Houston District | 11 | MC2 Civil, LLC | $3,950,379 | $3,954,794 | 0.0% | -15% | TxDOT |
| A00188201 | Preventive Maintenance, FM 1704 (Lower Elgin Rd to FM 969) | Austin District | 6 | Lone Star Paving Company | $2,843,419 | $2,953,421 | +4.0% | -14% | TxDOT |
| A00131296 | Bridge Replacement, COUNTY ROAD 256 (FCR 157 @ COPPERAS CREEK to (MAP #83)) | Waco District | 8 | Skyline Bridge LLC | $2,820,729 | $2,854,377 | +1.0% | -11% | TxDOT |
| A00198512 | Rehabilitate Bridge, Various (Var Locations in SE Harris AO Boundary to .) | Houston District | 5 | Isi Contracting, Inc. | $2,588,189 | $2,814,792 | +9.0% | -4.0% | TxDOT |
| A00179427 | Bicycle And Pedestrian Improvements, ROBISON RD N (N of W 15th Street to Richmond Road) | Atlanta District | 8 | Garret Shields Infrastructure | $1,943,602 | $1,946,960 | 0.0% | -15% | TxDOT |
| A00211864 | FLEXIBLE BASE, FM0185 (Various locations to Across the Waco District) | Waco District | 3 | Touchstone Resources, LLC | $1,646,175 | $1,709,538 | +4.0% | -14% | TxDOT |
| A00211911 | MOWING HIGHWAY RIGHT OF WAY, IH0030 (Various Locations In to South Tarrant County) | Fort Worth District | 4 | Central North Construction, LLC | $1,567,970 | $2,199,715 | +40% | -48% | TxDOT |
| A00212228 | BASE FAILURE PAVEMENT REPAIR, FM0437 (VARIOUS ROADWAYS to ACROSS BELL COUNTY) | Waco District | 3 | Texas Materials Group, Inc. | $1,547,097 | $1,572,475 | +2.0% | -6.0% | TxDOT |
| A00198078 | Transportation Non-Roadway, US 290 (At FM 2920 to .) | Houston District | 6 | Forde Construction Company, Inc. | $1,523,998 | $1,557,772 | +2.0% | -21% | TxDOT |
| A00212371 | PAVEMENT MARKINGS, IH0410 (VARIOUS LOCATIONS DISTRICTWIDE to VARIOUS) | San Antonio District | 4 | TRP Infrastructure Services, LLC | $1,479,950 | $1,672,718 | +13% | -50% | TxDOT |
| A00194464 | Bridge Replacement, COUNTY ROAD 508 (CR 508 at Draw to .) | Brownwood District | 9 | Delgado'S Contractors, LLC | $1,470,000 | $1,576,684 | +7.0% | -14% | TxDOT |
| A00210435 | HOT MIX, SL0281 (GREGG COUNTY to LONGVIEW MTCE SECTION) | Tyler District | 1 | Longview Asphalt, Inc. | $1,325,170 | +23% | TxDOT | ||
| A00196754 | Surfacing/Roadway Restoration, Various (On IH 610, From Braeswood Blvd to SH 225) | Houston District | 4 | TRP Infrastructure Services, LLC | $1,317,622 | $1,435,172 | +9.0% | -30% | TxDOT |
| A00212506 | PAVEMENT MARKINGS, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 3 | Stripe-A-Zone, LLC | $1,182,650 | $1,279,000 | +8.0% | -5.0% | TxDOT |
| A00212555 | FLEXIBLE BASE, SH0144 (VARIOUS LOCATIONS WITHIN to ERATH, HOOD AND SOMERVELL COUNTIES) | Fort Worth District | 1 | Touchstone Resources, LLC | $1,080,000 | +10% | TxDOT | ||
| A00212012 | EMULSION, FM3380 (Various Locations to Various Locations) | El Paso District | 1 | Ergon Asphalt & Emulsions, Inc. | $1,048,616 | 0.0% | TxDOT | ||
| A00211770 | PAVEMENT MARKINGS, IH0002 (DISTRICT WIDE to Various Roadways) | Pharr District | 3 | Pavement Markings Inc. | $767,105 | $998,420 | +30% | -8.0% | TxDOT |
| A00211693 | METAL BEAM GUARD FENCE REPAIR, US0059 (Various Highways in Fort Bend County to Various Highways in Fort Bend County) | Houston District | 8 | BK Field Operations LLC | $732,257 | $743,936 | +2.0% | -26% | TxDOT |
| A00189826 | Install Traffic Signal, SH 31 (SH 31 to SAWMILL ROAD) | Tyler District | 2 | Striping Technology, L.P. | $341,595 | $546,587 | +60% | -11% | TxDOT |
| A00211488 | TREE TRIMMING AND BRUSH REMOVAL, IH0030 (various locations in to South Tarrant) | Fort Worth District | 8 | Austin Barricade Company, L.L.C. | $241,177 | $294,797 | +22% | -31% | TxDOT |
| A00211866 | SWEEPING AND DEBRIS REMOVAL, SH0022 (Various locations to Across Hill, Falls, and Limestone) | Waco District | 1 | Rhino Equity, LLC | $112,762 | -3.0% | TxDOT | ||
| A00209528 | Bridge Maintenance, SH 336 (SH 336 @ HACKNEY LAKE FLOODWAY to 3.50 MI S OF US 83 NBI#211090062101007) | Pharr District | 7 | Structural Integrity Group LLC | $19,151 | $38,126 | +99% | -64% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.