Delgado'S Contractors, LLC: TxDOT bid record
Delgado'S Contractors, LLC submitted 73 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 04 NOV 2026, and was the low bidder on 22 of them (30%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $32,521,061
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 11 | 3 | 27% |
| 2022 | 3 | 2 | 67% |
| 2023 | 10 | 4 | 40% |
| 2024 | 8 | 3 | 38% |
| 2025 | 17 | 3 | 18% |
| 2026 | 20 | 5 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 20 | 5 | 25% |
| Abilene District | 9 | 3 | 33% |
| Laredo District | 9 | 4 | 44% |
| San Angelo District | 8 | 3 | 38% |
| Odessa District | 7 | 2 | 29% |
| Austin District | 5 | 1 | 20% |
| Brownwood District | 5 | 1 | 20% |
| Fort Worth District | 5 | 2 | 40% |
| Corpus Christi District | 3 | 1 | 33% |
| Dallas District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 38 | 25 (66%) | $1.00 | $1.40 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 47 | 23 (49%) | $1.00 | $1.00 |
| Preparing row | 100-7002 | STA | 40 | 21 (53%) | $1,500.00 | $2,750.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 72 | 14 (19%) | $2,750.00 | $5,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 39 | 11 (28%) | $250.00 | $200.00 |
| Excavation (roadway) | 110-7001 | CY | 41 | 10 (24%) | $30.00 | $20.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 36 | 9 (25%) | $650.00 | $643.00 |
| Rock filter dams (remove) | 506-7011 | LF | 33 | 9 (27%) | $10.00 | $12.00 |
| Excavation (channel) | 110-7002 | CY | 27 | 8 (30%) | $35.00 | $27.00 |
| Construction exits (remove) | 506-7024 | SY | 26 | 7 (27%) | $5.00 | $10.00 |
| Removing concrete (riprap) | 104-7006 | SY | 17 | 7 (41%) | $20.00 | $25.00 |
| Remove metal beam guard fence | 542-7001 | LF | 14 | 7 (50%) | $3.00 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| STX Civil | 21 | 9 of 21 |
| E-Z Bel Construction, LLC | 18 | 10 of 18 |
| Acme Bridge Company, Inc. | 17 | 7 of 17 |
| Hodges and Son Construction Company, Inc. | 15 | 3 of 15 |
| Relmco, Inc. | 14 | 5 of 14 |
| 3LW Civil LLC | 12 | 5 of 12 |
| Ti-Zack Concrete, LLC | 11 | 2 of 11 |
| Coppell Construction Co., Inc. | 11 | 3 of 11 |
| Skyline Bridge LLC | 11 | 4 of 11 |
| Salinas Construction Technologies, LTD. | 9 | 1 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00209149 | Laredo District | Bridge Replacement, MANGANA-HEIN RD (MANGANA HEIN RD to .) | 2 of 7 | $2,950,000 | +3.0% |
| 07 OCT 2026 | A00191892 | Odessa District | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | 2 of 7 | $8,170,341 | +21% |
| 28 SEP 2026 | A00223925 | Fort Worth District | REHABILITATION OF EXISTING ROADWAY, SH 114 (SH 114 frontage road to at FM 1938) | 2 of 2 | $203,570 | +3.0% |
| 02 SEP 2026 | A00184856 | San Antonio District | Bridge Replacement, CR 33 (On Waring-Welfare Road to at Joshua Creek) | 1 of 8 | $659,000 | Low, 2.0% under the second |
| 06 AUG 2026 | A00206263 | Odessa District | Bicycle And Pedestrian Improvements, Various (Champions, Tradewinds, and Deauville to Between Arlington Rd & SH250) | 1 of 6 | $2,075,905 | Low, 1.0% under the second |
| 05 AUG 2026 | A00136503 | Laredo District | Bridge Replacement, US 83 (1.80 MILES SOUTH OF UVALDE COUNTY LINE to .) | 8 of 10 | $18,212,971 | +32% |
| 05 AUG 2026 | A00065091 | Fort Worth District | Bridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .) | 7 of 10 | $1,888,841 | +23% |
| 03 JUN 2026 | A00206315 | Brownwood District | Construct Pedestrian Infrastructure, Various (Various locations in City of Coleman to .) | 2 of 4 | $2,365,925 | +8.0% |
| 03 JUN 2026 | A00190176 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 308 (AA03-08 Agua Dulce Creek to 1.10 MI S of FM 624) | 3 of 8 | $911,000 | +4.0% |
| 02 JUN 2026 | A00190177 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 230 (AA02-30 Draw to 0.5 MI SE of CR 237) | 6 of 10 | $975,500 | +19% |
| 02 JUN 2026 | A00198038 | San Angelo District | Bicycle And Pedestrian Improvements, Various (Along BU 67H From S Milton Street to Along BU 67H To S Koenigheim Street) | 2 of 7 | $1,927,500 | +15% |
| 13 MAY 2026 | A00219774 | Dallas District | CRASH CUSHION ATTENUATOR REPAIR, US0075 (VARIOUS LOCATIONS IN THE to COLLIN COUNTY MAINTENANCE SECTION) | 3 of 4 | $475,005 | +59% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 15 of 17 | $1,585,539 | +67% |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 1 of 13 | $1,135,008 | Low, 0.0% under the second |
| 06 MAY 2026 | A00139927 | San Angelo District | Bridge Replacement, FM 72 (At Spring Creek Bridge to -) | 1 of 10 | $4,405,521 | Low, 3.0% under the second |
| 08 APR 2026 | A00194074 | Abilene District | Bridge Replacement, CR 305 (ALKALI CRK TRIB to .) | 2 of 7 | $1,910,911 | +2.0% |
| 08 APR 2026 | A00037264 | Fort Worth District | Bridge Replacement, OLD GRANBURY RD (OLD GRANBURY RD OVER WALNUT CREEK to .) | 6 of 8 | $734,414 | +16% |
| 07 APR 2026 | A00061686 | Abilene District | Bridge Replacement, COUNTY ROAD 412 (CR 412 to AT COTTONWOOD CRK TRIB) | 2 of 6 | $3,627,377 | +15% |
| 24 FEB 2026 | A00218605 | Odessa District | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS) | 3 of 12 | $410,420 | +4.0% |
| 05 FEB 2026 | A00065079 | Fort Worth District | Bridge Replacement, COUNTY ROAD 351 (CR 351 @ BELL BRANCH to .) | 1 of 12 | $625,625 | Low, 1.0% under the second |
| 16 DEC 2025 | A00218605 | Odessa District | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS) | 5 of 10 | $775,775 | +55% |
| 06 NOV 2025 | A00036755 | Abilene District | Bridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .) | 6 of 8 | $2,340,800 | +35% |
| 15 OCT 2025 | A00217466 | Fort Worth District | REHABILITATION OF EXISTING ROADWAY, FM1938 (Main Street to to Cardinal Lane) | 1 of 2 | $138,483 | Low, 168% under the second |
| 09 OCT 2025 | A00194081 | Abilene District | Bridge Replacement, CR 314 (AT DRAW to .) | 1 of 8 | $918,429 | Low, 1.0% under the second |
| 05 SEP 2025 | A00215951 | Brownwood District | BRIDGE PREVENTATIVE MAINTENANCE, FM1476 (DISTRICT-WIDE to DISTRICT-WIDE) | 9 of 11 | $1,077,808 | +57% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.