TxDOT contract A00036755 bid tabulation
Bridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .). Let by Texas DOT on November 6, 2025, Fisher, Abilene District. 8 bids received; low bid $1,728,544 by Coppell Construction Co., Inc., -24% against the engineer's estimate of $2,287,777.
- Owner
- Texas DOT
- Letting
- 06 NOV 2025
- Pay items
- 34
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Coppell Construction Co., Inc. | $1,728,544 | Low | -24% |
| 2 | Hodges and Son Construction Company, Inc. | $1,872,743 | +8.0% | -18% |
| 3 | Scott Tucker Construction Company, LLC | $1,953,933 | +13% | -15% |
| 4 | J. H. Strain & Sons, Inc. | $1,984,297 | +15% | -13% |
| 5 | STX Civil | $2,142,112 | +24% | -6.0% |
| 6 | Delgado'S Contractors, LLC | $2,340,800 | +35% | +2.0% |
| 7 | C. E. Barker, LTD. | $3,244,296 | +88% | +42% |
| 8 | Earth Builders, L.P. | $3,273,428 | +89% | +43% |
Engineer's estimate: $2,287,777.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Coppell Construction Co., Inc. | 2. Hodges and Son Construction Company, Inc. | 3. Scott Tucker Construction Company, LLC | 4. J. H. Strain & Sons, Inc. | 5. STX Civil | 6. Delgado'S Contractors, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (roadway) (110-7001) | CY | 1,167 | $40.00 | $23.00 | $20.00 | $29.00 | $25.00 | $25.00 | $45.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 20 | $80.00 | $55.00 | $200.00 | $91.00 | $100.00 | $48.00 | $50.00 |
| 3 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 417 | $0.58 | $6.20 | $8.00 | $8.00 | $7.00 | $5.00 | $1.00 |
| 4 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 209 | $0.47 | $10.00 | $10.00 | $12.00 | $7.00 | $7.40 | $0.75 |
| 5 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 209 | $0.44 | $10.00 | $10.00 | $12.00 | $7.00 | $7.40 | $1.00 |
| 6 | Vegetative watering (168-7001) | TGL | 4 | $100.00 | $50.00 | $1.00 | $1,166.00 | $1,000.00 | $50.00 | $200.00 |
| 7 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 1,488 | $20.00 | $36.00 | $40.00 | $23.00 | $26.00 | $70.00 | $27.00 |
| 8 | Cem stabil BKFL (400-7010) | CY | 77 | $408.50 | $342.00 | $300.00 | $196.00 | $250.00 | $235.00 | $250.00 |
| 9 | Drilled shaft (18 in) (416-7002) | LF | 140 | $200.00 | $110.00 | $180.00 | $260.00 | $195.00 | $280.00 | $250.00 |
| 10 | Drilled shaft (36 in) (416-7006) | LF | 630 | $525.00 | $290.00 | $275.00 | $363.00 | $315.00 | $335.00 | $400.00 |
| 11 | Class C concrete (abutment)(HPC) (420-7013) | CY | 35.80 | $2,900.00 | $1,200.00 | $1,900.00 | $2,086.00 | $1,400.00 | $1,300.00 | $1,800.00 |
| 12 | Class C concrete (cap)(HPC) (420-7023) | CY | 71.90 | $2,600.00 | $950.00 | $1,700.00 | $1,652.00 | $1,500.00 | $2,600.00 | $1,800.00 |
| 13 | Class C concrete (column)(HPC) (420-7039) | CY | 19.60 | $2,600.00 | $1,200.00 | $2,200.00 | $2,753.00 | $1,450.00 | $2,600.00 | $2,000.00 |
| 14 | Reinforced concrete slab (HPC) (422-7002) | SF | 9,018 | $40.00 | $29.00 | $36.00 | $31.00 | $35.00 | $28.00 | $35.00 |
| 15 | Prestressed concrete girder (TX28) (425-7001) | LF | 1,427.68 | $330.00 | $219.00 | $250.00 | $280.00 | $275.00 | $335.00 | $300.00 |
| 16 | Riprap (stone protection)(18 in) (432-7043) | CY | 317 | $220.00 | $300.00 | $200.00 | $220.00 | $200.00 | $190.00 | $250.00 |
| 17 | Spot clean & paint existing structure(special protection sys) (446-7019) | LS | 1 | $20,000 | $60,000 | $115,000 | $17,130 | $75,000 | $100,000 | $120,000 |
| 18 | Rail (type T222)(HPC) (450-7007) | LF | 656 | $200.00 | $140.00 | $170.00 | $192.00 | $135.00 | $180.00 | $200.00 |
| 19 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 86 | $275.00 | $260.00 | $225.00 | $193.00 | $400.00 | $300.00 | $300.00 |
| 20 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $60,000 | $58,000 | $60,000 | $65,099 | $195,000 | $100,000 | $175,000 |
| 21 | Mobilization (500-7001) | LS | 1 | $150,000 | $150,000 | $165,000 | $195,114 | $115,000 | $164,000 | $170,000 |
| 22 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $10,000 | $15,000 | $2,000.00 | $1,250.00 | $1,500.00 | $860.00 | $5,800.00 |
| 23 | Temporary sediment control fence (install) (506-7039) | LF | 675 | $5.60 | $4.00 | $1.00 | $5.00 | $8.00 | $4.00 | $7.00 |
| 24 | Temporary sediment control fence (remove) (506-7041) | LF | 675 | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $1.00 | $1.00 |
| 25 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 250 | $10.00 | $5.00 | $5.00 | $5.00 | $10.00 | $8.00 | $7.00 |
| 26 | Biodegradable erosion control logs (remove) (506-7046) | LF | 250 | $2.00 | $1.00 | $1.00 | $1.00 | $3.00 | $1.00 | $1.00 |
| 27 | Metal W-beam guard fence (timber post) (540-7001) | LF | 387.50 | $27.43 | $28.00 | $28.00 | $29.00 | $33.00 | $30.00 | $35.00 |
| 28 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,567.50 | $1,900.00 | $2,700.00 | $3,036.00 | $3,000.00 | $2,200.00 | $2,000.00 |
| 29 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $4,016.67 | $3,000.00 | $3,200.00 | $3,427.00 | $3,600.00 | $3,200.00 | $3,750.00 |
| 30 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $800.00 | $750.00 | $1,500.00 | $1,004.00 | $1,000.00 | $800.00 | $1,000.00 |
| 31 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $131.95 | $200.00 | $50.00 | $125.00 | $200.00 | $1.00 | $300.00 |
| 32 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 28 | $63.98 | $42.00 | $45.00 | $103.00 | $41.00 | $35.00 | $30.00 |
| 33 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 21 | $85.00 | $46.00 | $45.00 | $116.00 | $41.00 | $35.00 | $30.00 |
| 34 | Relocate existing truss bridge (4005-7001) | LS | 1 | $40,000 | $40,000 | $45,000 | $111,098 | $125,000 | $100,000 | $155,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.