TxDOT letting results, June 30, 2022
55 contracts let by Texas DOT on June 30, 2022, $464,717,449 in low bids, a median of 3 bidders per contract. On the 55 with an engineer's estimate, the low bid came in under it 16 times; median low bid +13% against the estimate.
- Owner
- Texas DOT
- Contracts
- 55
- Low bids, total
- $464,717,449
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 06223601 | IH 35 Widen road - add lanes from AT FM 455 AND ON FM 455 FROM to W OF FM 2450 TO E OF MARION RD | Dallas District | 5 | Webber, LLC | $119,332,000 | $121,527,334 | +2.0% | +16% | TxDOT |
| 06223607 | SH 46 Widen road - add lanes from US 281 to BENTWOOD DR. | San Antonio District | 3 | Webber, LLC | $59,488,630 | $63,559,000 | +7.0% | -1.0% | TxDOT |
| 06223602 | US 175 Widen road - add lanes from 0.4 MI SE OF SH 155, SE to CHEROKEE C/L AT NECHES RIVER | Tyler District | 4 | Big Creek Construction, LTD. | $55,487,305 | $62,792,646 | +13% | +16% | TxDOT |
| 06223603 | FM 2514 Reconstruct 2 lane rural to 4 lane divided from EAST OF LAVON PKWY to BROWN STREET | Dallas District | 3 | Webber, LLC | $50,385,911 | $52,296,917 | +4.0% | +17% | TxDOT |
| 06223605 | SH 18 Highway improvement from NM STATE LINE to SH 115 | Odessa District | 3 | Jones Bros. Dirt & Paving Contractors, Inc. | $37,268,536 | $37,975,033 | +2.0% | +22% | TxDOT |
| 06223606 | VA Ferry operation projects from AT GALVESTON FERRY | Houston District | 1 | Southwest Shipyard, L.P. | $22,468,330 | +47% | TxDOT | ||
| 06223609 | FM 39 Rehabilitate rd and widen shoulders from OSR to US 190 | Bryan District | 2 | Big Creek Construction, LTD. | $14,087,278 | $16,829,520 | +19% | +18% | TxDOT |
| 06223613 | CS Construct new roadway lanes from 114TH ST. AT QUAKER AVE to INDIANA AVE | Lubbock District | 3 | Allen Butler Construction, Inc. | $12,797,068 | $14,000,000 | +9.0% | +21% | TxDOT |
| 06223612 | SH 207 Bridge replacement from FARWELL DRAW | Amarillo District | 3 | J. Lee Milligan, Inc. | $7,907,130 | $8,323,110 | +5.0% | +43% | TxDOT |
| 06223611 | SH 132 Widen road - add lanes from SH 132 to AT FM 2790 | San Antonio District | 7 | Hunter Industries, LTD. | $6,628,642 | $7,176,600 | +8.0% | +21% | TxDOT |
| 06223616 | FM 1378 Rehabilitate existing roadway from SOUTH OF JESSICA LANE to SH 5 | Dallas District | 4 | Foutsco Paving Company, LLC | $6,227,271 | $6,339,606 | +2.0% | +19% | TxDOT |
| 06223614 | SH 31 Bridge replacement from AT HUGHES BRANCH AND to AT MELTON BRANCH | Dallas District | 6 | MP Heavy Construction Inc | $5,998,923 | $6,083,414 | +1.0% | +5.0% | TxDOT |
| 06223618 | FM 2887 Hazard elimination & safety from SH 158W to TOM GREEN CL | San Angelo District | 3 | Relmco, Inc. | $4,777,670 | $5,454,205 | +14% | +32% | TxDOT |
| 06223644 | FM 1314 Surfacing/roadway restoration from N OF FATHEREE DR to SL 494 | Houston District | 4 | Texas Materials Group, Inc. | $4,740,081 | $4,838,233 | +2.0% | -5.0% | TxDOT |
| 06223617 | SH 111 Bridge replacement from AT BRUSHY CREEK to STR# 0346-06-023 | Yoakum District | 6 | SB Contractors LLC | $4,643,081 | $4,793,689 | +3.0% | +7.0% | TxDOT |
| 06224616 | BU0271B Mill and inlay from VARIOUS LOCATIONS IN to PARIS DISTRICT | Paris District | 2 | Richard Drake Construction Company, L.P. | $3,805,754 | $4,476,564 | +18% | +2.0% | TxDOT |
| 06223625 | CR Bridge replacement from CR 144 AT AMERICAN CANAL | Houston District | 3 | R Construction Civil, LLC | $3,440,533 | $3,709,052 | +8.0% | +25% | TxDOT |
| 06223621 | FM 2632 Hazard elimination & safety from SH 279 to FM 2125 | Brownwood District | 2 | Jay Mills Contracting, Incorporated | $3,196,924 | $3,311,407 | +4.0% | +12% | TxDOT |
| 06224603 | US0175 Sweeping and debris removal from VARIOUS ROADWAYS IN THE SOUTHEAST to DALLAS COUNTY MAINTENANCE SECTION | Dallas District | 1 | Sweeping Corporation of America, LLC | $3,040,803 | +14% | TxDOT | ||
| 06223624 | VA Traffic signal improvements from VARIOUS LOCATIONS to DISTRICTWIDE FY 2022 | Fort Worth District | 1 | Durable Specialties, Inc. | $2,520,015 | +26% | TxDOT | ||
| 06224602 | SL0012 Sweeping and debris removal from VARIOUS ROADWAYS IN THE NORTHWEST to DALLAS COUNTY MAINTENANCE SECTION | Dallas District | 1 | Sweeping Corporation of America, LLC | $2,364,578 | +20% | TxDOT | ||
| 06224608 | IH0610 Illumination maintenance from VARIOUS HIGHWAYS IN HOUSTON DISTRIC to VARIOUS HIGHWAYS IN HOUSTON DISTRIC | Houston District | 4 | Lindsey Electric, L.P. | $2,230,105 | $2,678,015 | +20% | -23% | TxDOT |
| 06223638 | SH 7 Hazard elimination & safety from BS 7B to BS 6N | Waco District | 3 | Talbran Enterprises LLC | $2,042,766 | $2,199,108 | +8.0% | +11% | TxDOT |
| 06223635 | CS Hazard elimination & safety from IN NEW BRAUNFELS ON BARBAROSA RD to AT FM 1101 | San Antonio District | 6 | E-Z Bel Construction, LLC | $1,934,817 | $2,041,294 | +6.0% | +12% | TxDOT |
| 06223632 | IH 10 Preventive maintenance from 0.22 MI E OF EL PASO/HUDSPETH CL to 1.54 MI W OF KNOX AVE | El Paso District | 3 | Penhall Company | $1,895,555 | $1,913,252 | +1.0% | +25% | TxDOT |
| 06223626 | SL 368 Hazard elimination & safety from WALZEM RD to CORINNE RD | San Antonio District | 1 | E-Z Bel Construction, LLC | $1,884,493 | +17% | TxDOT | ||
| 06223630 | SH 30 Hazard elimination & safety from BS 6-R to SH 6 | Bryan District | 2 | Knife River Corporation - South | $1,790,661 | $2,441,244 | +36% | +56% | TxDOT |
| 06223623 | CR Hazard elimination & safety from IN BEXAR COUNTY ON N FOSTER RD to AT CANDLE MEADOW | San Antonio District | 3 | E-Z Bel Construction, LLC | $1,705,803 | $1,935,756 | +13% | -15% | TxDOT |
| 06223620 | VA Preventive maintenance from VARIOUS LOCATIONS to IN THE DALLAS COUNTY | Dallas District | 3 | Stripe-A-Zone, LLC | $1,681,430 | $1,876,305 | +12% | -32% | TxDOT |
| 06224615 | SH0019 Traffic control services from VARIOUS LOCATIONS IN to HOPKINS AND FRANKLIN COUNTY | Paris District | 3 | Area Wide Protective, Inc. | $1,360,000 | $1,778,500 | +31% | +49% | TxDOT |
| 06223627 | SL 275 Install traffic signal from AT RAMBLE LN | Austin District | 3 | Lone Star Sitework, LLC | $1,318,917 | $1,583,009 | +20% | +36% | TxDOT |
| 06223610 | IH 10 Hazard elimination & safety from 1.487 MILES WEST OF FM 565, EAST to 0.20 MILES WEST OF FM 565 | Beaumont District | 6 | Third Coast Services LLC | $1,285,257 | $1,292,941 | +1.0% | -6.0% | TxDOT |
| 06224618 | US0082 Bridge preventative maintenance from BPM AT VARIOUS PLACES to THROUGHOUT THE DISTRICT | Wichita Falls District | 6 | Talbran Enterprises LLC | $1,243,840 | $1,285,995 | +3.0% | -9.0% | TxDOT |
| 06224614 | US0082 Traffic control services from VARIOUS LOCATIONS IN to LAMAR, DELTA AND RED RIVER COUNTY | Paris District | 3 | Area Wide Protective, Inc. | $1,236,500 | $1,939,000 | +57% | +13% | TxDOT |
| 06223631 | BI 20-B Install flashing beacon from AT CR 117 | Odessa District | 3 | Apollo Constructors, Inc. | $1,033,762 | $1,060,434 | +3.0% | +6.0% | TxDOT |
| 06223634 | CR Bridge replacement from ROLAND RD to AT S BRANCH OF BIG MINERAL CREEK | Paris District | 4 | Hodges and Son Construction Company, Inc. | $999,796 | $1,022,582 | +2.0% | -9.0% | TxDOT |
| 06223636 | VA Landscape development from EL PASO COUNTYWIDE | El Paso District | 4 | Horizone Construction I, LTD | $995,591 | $1,076,407 | +8.0% | +17% | TxDOT |
| 06223637 | CR Bridge replacement from AT LONE TREE CREEK CR 117 to (HENDERSON RD) STR AA01-80-001 | Yoakum District | 4 | Texas Steel Industrial Placing, LLC | $988,832 | $1,074,944 | +9.0% | +26% | TxDOT |
| 06224604 | IH0010 Metal beam guard fence repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 3 | Apache Barricade & Sign | $921,772 | $996,630 | +8.0% | +7.0% | TxDOT |
| 06223628 | FM 364 Hazard elimination & safety from 300' N OF SPURLOCK, SOUTH to SH 105 | Beaumont District | 3 | Norman Highway Constructors, Inc. | $871,505 | $1,187,176 | +36% | -22% | TxDOT |
| 06223642 | CR Bridge replacement from CR 2810 AT BILLIAMS CREEK to (STR 202290AA0144001) | Beaumont District | 2 | Texas Materials Group, Inc. | $746,700 | $787,976 | +6.0% | +22% | TxDOT |
| 06224617 | FM2651 Asphalt pavement repair from THROCKMORTON COUNTY to ON FM 2651 | Wichita Falls District | 1 | Blacksmith Ventures LLC | $714,092 | +24% | TxDOT | ||
| 06224611 | IH0020 Traffic control services from VARIOUS to VARIOUS | Odessa District | 2 | FC Traffic Control, Inc. | $631,975 | $657,445 | +4.0% | -8.0% | TxDOT |
| 06224609 | IH0069 Pavement markings from VARIOUS LOCATIONS IN N. HARRIS COUN to VARIOUS LOCATIONS IN N. HARRIS COUN | Houston District | 5 | Stripe Lines, Inc. | $612,059 | $735,039 | +20% | -29% | TxDOT |
| 06224612 | IH0020 Bridge repair from VARIOUS to VARIOUS | Odessa District | 1 | SCR Civil Construction, LLC | $549,625 | +8.0% | TxDOT | ||
| 06223639 | FM 157 Install/replace signs from US 287 to US 67 | Fort Worth District | 10 | Synergy Signs & Services LLC | $473,255 | $545,900 | +15% | -27% | TxDOT |
| 06223622 | SL 8 Restriping from 6 to 8 lanes from US 90 to S OF IH 10 E | Houston District | 1 | Batterson, LLP | $459,159 | +49% | TxDOT | ||
| 06224601 | US0096 Tree trimming and brush removal from TYLER/JASPER COUNTY to NEWTON COUNTY | Beaumont District | 4 | Ace Contractors, Inc. | $449,100 | $505,830 | +13% | -14% | TxDOT |
| 06224605 | IH0010 Culvert cleaning from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 3 | Synergy Project Contractors, Inc. | $435,554 | $443,475 | +2.0% | +18% | TxDOT |
| 06224606 | IH0010 Sweeping and debris removal from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 3 | Synergy Project Contractors, Inc. | $402,262 | $433,260 | +8.0% | +18% | TxDOT |
| 06224620 | FM0487 Tree trimming and brush removal from VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES | Austin District | 5 | Boen Landscaping & Irrigation, LLC | $335,690 | $347,078 | +3.0% | -3.0% | TxDOT |
| 06224607 | IH0010 De-icing salt from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 2 | NSG Logistics, LLC | $312,266 | $337,936 | +8.0% | 0.0% | TxDOT |
| 06224613 | SH0011 Cutback asphalt from ALL COUNTIES IN THE to PARIS DISTRICT | Paris District | 2 | Martin Resource Management Corporation | $272,350 | $315,250 | +16% | -10% | TxDOT |
| 06223641 | VA Landscape development from VARIOUS LOCATIONS ON to STATE LOOP 7 IN ATHENS | Tyler District | 2 | Tight Line Construction, LLC | $173,162 | $174,316 | +1.0% | +10% | TxDOT |
| 06224610 | US0059 Crack seal from SAN JACINTO, TRINITY, POLK, HOUSTON to VARIOUS LOCATIONS | Lufkin District | 7 | Scout 5 Construction LLC | $122,337 | $124,196 | +2.0% | -49% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.