Apollo Constructors, Inc.: TxDOT bid record

Apollo Constructors, Inc. submitted 12 bids on Texas DOT contracts in the data, from 04 NOV 2020 to 01 JUL 2026, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Texas DOT
Low bid volume
$3,192,516
Latest bid
01 JUL 2026
Data through
19 NOV 2026
12Bids
5Low bids
42Win rate, percent
+9.0%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
2020100%
2021100%
202222100%
20232150%
2024100%
20253133%
20262150%
Apollo Constructors, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Lubbock District5240%
Amarillo District4125%
Odessa District2150%
El Paso District11100%
Apollo Constructors, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO105 (50%)$4,200.00$5,000.00
Electrical conductor (no.6) bare620-7009LF104 (40%)$2.50$2.10
Vehicle signal section (12")LED(yel)682-7003EACH54 (80%)$327.96$300.00
TMA (stationary)505-7001DAY113 (27%)$150.00$230.00
Electrical conductor (no.6) insulated620-7010LF83 (38%)$2.92$2.50
Drilled shaft (roadway illumination pole) (30 in)416-7040LF63 (50%)$350.00$280.00
Aluminum signs (type A)636-7001SF53 (60%)$35.00$35.00
Backplate W/ref border(4 sec)(vent)aluminum682-7043EACH52 (40%)$279.00$223.96
Ground box type A (122311)W/apron624-7002EACH61 (17%)$1,275.00$1,271.50
Vehicle signal section (12")LED(green arrow)682-7002EACH51 (20%)$500.00$300.00
Vehicle signal section (12")LED(yel arrow)682-7004EACH51 (20%)$500.00$300.00
Vehicle signal section (12")LED(red arrow)682-7006EACH51 (20%)$500.00$300.00
Apollo Constructors, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Apollo Constructors, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 JUL 2026A00184345Lubbock DistrictTraffic Signal Improvements, 13TH ST (Intersection of 13th St to And Slide Road)2 of 3$359,146+9.0%
06 MAY 2026A00206605El Paso DistrictHazard Elimination & Safety, SH 20 (LEISURE LN to LAZY KNEE)1 of 5$867,336Low, 6.0% under the second
03 DEC 2025A00195966Lubbock DistrictInstall Illumination, US 84 (Intersection of to CR7200 (98th St.))2 of 5$844,624+21%
08 AUG 2025A00184233Lubbock DistrictTraffic Signal Improvements, SS 326 (Intersection of SS0326 to and Erskine)1 of 4$519,269Low, 14% under the second
05 JUN 2025A00184537Amarillo DistrictInstall Traffic Signal, Various (Various to .)2 of 4$714,675+8.0%
09 JUL 202407243030Amarillo DistrictVA Install traffic signal from VARIOUS3 of 4$742,602+16%
27 JUN 202306233453Amarillo DistrictVA Install traffic signal from VARIOUS1 of 3$576,035Low, 11% under the second
04 MAY 202305233032Amarillo DistrictFM 809 Install illumination from IH 40 WEST2 of 3$2,386,889+1.0%
30 JUN 202206223631Odessa DistrictBI 20-B Install flashing beacon from AT CR 1171 of 3$1,033,762Low, 3.0% under the second
29 JUN 202206223439Lubbock DistrictSH 86 Beacon upgrades & illumination from 0.5 MILES WEST OF SH 214 to 0.5 MILES EAST OF SH 2141 of 1$196,115Low
02 JUL 202107213248Lubbock DistrictUS 84 Install illumination from FM 3020 INTERSECTION to US 84 INTERSECTION4 of 7$608,194+13%
04 NOV 202011203025Odessa DistrictSH 115 Safety lighting at intersection from AT SH 128, ETC.2 of 6$1,163,296+1.0%
Apollo Constructors, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy