TxDOT letting results, July 9, 2024

36 contracts let by Texas DOT on July 9, 2024, $676,519,490 in low bids, a median of 4 bidders per contract. On the 36 with an engineer's estimate, the low bid came in under it 28 times; median low bid -12% against the estimate.

Owner
Texas DOT
Contracts
36
Low bids, total
$676,519,490
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
07243001IH 30 Reconstruct existing roadway from LINKCREST DRIVE to IH 820Fort Worth District2Zachry Construction Corporation$267,014,970$288,181,468+8.0%+3.0%TxDOT
07243002SH 178 Infrastructure improvements from NM/TX STATELINE to IH 10El Paso District2Sundt Construction, Inc.$243,747,771$259,564,228+6.0%+11%TxDOT
07243004US 83 Rehabilitate existing roadway from 1.741 MI SOUTH OF FM 2688 to WEBB/DIMMIT CO LINE (SURVEYED MONUMLaredo District2Hunter Industries, LTD.$46,859,660$48,920,076+4.0%-15%TxDOT
07243005US 83 Widen road - add shoulders from .67 MILES NORTH OF FM 3034 to .28 MILES SOUTH OF FM 3034Abilene District3FNF Construction, Inc.$39,496,851$41,868,598+6.0%+1.0%TxDOT
07243032SS 408 Hazard elimination & safety from SL 12 to IH 20Dallas District3Austin Bridge & Road Services, LP$16,188,626$17,423,046+8.0%-16%TxDOT
07243006FM 2556 Hazard elimination & safety from 2.9 MI N OF US 281 MILITARY to @ ARROYO COLORADOPharr District2Foremost Paving, Inc.$7,945,429$8,822,514+11%-8.0%TxDOT
07243031SL 335 Hazard elimination & safety from EASTERN ST to 0.65 MI EAST OF WHITAKER RDAmarillo District5L A Fuller & Sons Construction, LTD.$6,927,099$8,099,052+17%-4.0%TxDOT
07243008VA Install/rehabilitate its from VARIOUS LOCATIONS to FTW DISTRICTFort Worth District1Light It Up Electric$5,001,169+36%TxDOT
07243010FM 1414 Surfacing/roadway restoration from SH 63, SOUTH to FM 2991Beaumont District3Texas Materials Group, Inc.$3,448,292$3,629,559+5.0%+12%TxDOT
07243007US 82 Hazard elimination & safety from 1.25 MI E OF FM 103 to 0.25 MI W OF SH 59Wichita Falls District7Scout 5 Construction LLC$3,283,667$3,466,168+6.0%-19%TxDOT
07243009FM 521 Bridge replacement from AT OYSTER CREEKHouston District8Brice Construction and Design LLC$3,244,910$3,431,984+6.0%-4.0%TxDOT
07244018US0175 Flexible pavement structure repair from VARIOUS ROADWAYS IN THE KAUFMAN - to ROCKWALL MAINTENANCE SECTIONDallas District4Foutsco Paving Company, LLC$3,005,175$3,151,460+5.0%-9.0%TxDOT
07243013US 75 Repair roadway from GRAYSON COUNTY LINE to VALLEY CREEK TRAILDallas District2O. Trevino Construction, LLC$2,947,555$5,987,525+103%-17%TxDOT
07243019FM 80 Bridge replacement from AT SANDERS CREEKBryan District7Pmco Construction LLC$2,767,000$2,853,360+3.0%-20%TxDOT
07243015CR Widen bridge from AT DRAW to STR # AA03-05-001 (GUADALUPE RD)Yoakum District8STX Civil$2,763,608$2,806,072+2.0%+14%TxDOT
07244021US0377 Flexible pavement structure repair from VARIOUS LOCATIONS IN to ERATH COUNTYFort Worth District2Northeastern Pavers, LLC$2,371,696$2,537,727+7.0%+15%TxDOT
07243014VA Install traffic signal from VARIOUS LOCATIONS DISTRICTWIDEHouston District2Statewide Traffic Signal Company$2,197,558$4,437,759+102%-1.0%TxDOT
07243017VA Bridge maintenance from VARIOUS LOCATIONS IN BURNETAustin District6Garret Shields Infrastructure$1,968,905$2,253,275+14%+15%TxDOT
07243011VA Construct pedestrian infrastructure from VARIOUS LOCATIONS DISTRICTWIDELufkin District5Garret Shields Infrastructure$1,672,687$1,942,278+16%-13%TxDOT
07243020FM 2936 Hazard elimination & safety from MAIN ST., EAST to W.FORK DOUBLE BAYOUBeaumont District3Cornerstone Paving and Construction, L.L.C.$1,564,315$1,671,040+7.0%-2.0%TxDOT
07243012IH 45 Highway improvement from FM 1488 to SL 336 (SOUTH)Houston District1MC2 Civil, LLC$1,297,847-23%TxDOT
07244019IH0010 Bridge joint cleaning and sealing from VARIOUS LOCATIONS to VARIOUS LOCATIONSEl Paso District5SCR Civil Construction, LLC$1,233,642$1,647,235+34%-22%TxDOT
07244017IH0035E Sweeping and debris removal from VARIOUS ROADWAYS IN THE to ELLIS COUNTY MAINTENANCE SECTIONDallas District2Professional Traffic Control LLC$1,174,824$1,185,765+1.0%-22%TxDOT
07243018FM 2347 Bicycle and pedestrian improvements from BS 6R to FM 2154Bryan District4Larry Young Paving, Inc.$1,020,976$1,162,054+14%-21%TxDOT
07243022VA Install/replace signs from VARIOUS LOCATIONS to DISTRICT WIDEFort Worth District6Synergy Signs & Services LLC$944,350$1,115,400+18%-20%TxDOT
07243023VA Bridge maintenance from VARIOUS BRIDGE LOCATIONS IN BASTROP to AND TRAVIS COUNTIES.Austin District6Garret Shields Infrastructure$884,147$924,646+5.0%-17%TxDOT
07244020IH0020 Sweeping and debris removal from VARIOUS LOCATIONS IN to PARKER & PALO PINTO COUNTIESFort Worth District2Professional Traffic Control LLC$746,150$807,259+8.0%-11%TxDOT
07243024CS Resurface roadway from ALAMO ST to UNIVERSITY DRAustin District6Texas Materials Group, Inc.$737,549$772,738+5.0%-10%TxDOT
07243029SH 199 Intersection improvements with right and/or left from 1000' W OF POOLVILLE CUTOFF RD to 1000' E OF POOLVILLE CUTOFF RDFort Worth District4Jagoe-Public Company$734,777$809,596+10%-19%TxDOT
07243025CR Bridge replacement and approaches from @ BEAVER CREEKChildress District6Skyline Bridge LLC$699,120$744,947+7.0%-22%TxDOT
07243030VA Install traffic signal from VARIOUSAmarillo District4Vaca Underground Utilities Inc$640,275$663,400+4.0%-3.0%TxDOT
07243016VA Install/replace signs from VARIOUS to VARIOUSWaco District8Cross Plus Construction, LLC$598,139$643,344+8.0%-8.0%TxDOT
07243026SH 218 Construct pedestrian infrastructure from 0.11 MILES WEST OF SL 1604 to 0.11 MILES EAST OF SL 1604San Antonio District10Rare Earth Landscape Solutions LLC$430,569$478,986+11%-21%TxDOT
07243021VA Surfacing/roadway restoration from VARIOUS LOCATIONS IN HARRIS COUNTYHouston District4TRP Infrastructure Services, LLC$397,218$484,047+22%-39%TxDOT
07243027VA Purchase and install signs & equip from AT SH 130, US 290, SH 71, IH 35, SHAustin District4Vaca Underground Utilities Inc$299,609$321,010+7.0%-13%TxDOT
07243028US 180 Landscape development from NE 27TH to PARKER CO LNFort Worth District5Tight Line Construction, LLC$263,355$266,889+1.0%-22%TxDOT
TxDOT contracts let on July 9, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy