Pmco Construction LLC: TxDOT bid record
Pmco Construction LLC submitted 25 bids on Texas DOT contracts in the data, from 01 DEC 2022 to 03 SEP 2026, and was the low bidder on 6 of them (24%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $12,207,764
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 5 | 2 | 40% |
| 2024 | 1 | 1 | 100% |
| 2025 | 9 | 2 | 22% |
| 2026 | 9 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 6 | 1 | 17% |
| Waco District | 5 | 2 | 40% |
| Bryan District | 5 | 2 | 40% |
| Fort Worth District | 5 | 1 | 20% |
| Paris District | 2 | 0 | 0% |
| Tyler District | 1 | 0 | 0% |
| Wichita Falls District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 24 | 5 (21%) | $1.15 | $1.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 22 | 5 (23%) | $3,232.50 | $3,245.00 |
| Portable changeable message sign | 503-7002 | EACH | 14 | 5 (36%) | $7,750.00 | $10,000 |
| Preparing row | 100-7002 | STA | 23 | 4 (17%) | $3,600.00 | $2,750.00 |
| Rock filter dams (install) (type 2) | 506-7002 | LF | 18 | 4 (22%) | $39.50 | $40.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 14 | 4 (29%) | $25.15 | $27.00 |
| Rail (type T223) | 450-7008 | LF | 9 | 4 (44%) | $150.00 | $160.00 |
| Rock filter dams (remove) | 506-7011 | LF | 24 | 3 (13%) | $11.00 | $12.00 |
| Excavation (roadway) | 110-7001 | CY | 19 | 3 (16%) | $24.00 | $20.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 9 | 3 (33%) | $2,025.00 | $2,140.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 25 | 2 (8%) | $3,500.00 | $5,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 22 | 2 (9%) | $287.50 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 18 | 7 of 18 |
| Knife River Corporation - South | 12 | 5 of 12 |
| Texas Steel Industrial Placing, LLC | 9 | 3 of 9 |
| Ed Bell Construction Company | 7 | 0 of 7 |
| A. L. Helmcamp, Inc. | 7 | 1 of 7 |
| Garret Shields Infrastructure | 7 | 4 of 7 |
| Highway 19 Construction LLC | 6 | 4 of 6 |
| Talbert Companies LLC | 6 | 2 of 6 |
| Tucan Contracting, LLC | 6 | 4 of 6 |
| STX Civil | 6 | 5 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00189990 | Bryan District | Bridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK) | 4 of 7 | $1,165,655 | +2.0% |
| 03 SEP 2026 | A00127879 | Paris District | Bridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK) | 4 of 8 | $2,509,509 | +18% |
| 02 SEP 2026 | A00206056 | Wichita Falls District | Construct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR) | 5 of 7 | $1,198,364 | +16% |
| 06 AUG 2026 | A00211130 | Dallas District | Bridge Maintenance, IH 45 (N of CR 4742 to S of CR 4744) | 9 of 9 | $774,798 | +61% |
| 05 AUG 2026 | A00189992 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (On CR 244 (F-CR 265) to At Eads Creek) | 4 of 8 | $2,755,532 | +7.0% |
| 05 AUG 2026 | A00065091 | Fort Worth District | Bridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .) | 5 of 10 | $1,794,044 | +17% |
| 05 AUG 2026 | A00217911 | Dallas District | Bridge Maintenance, US 80 (at Big Brushy Creek to .) | 9 of 10 | $1,287,749 | +61% |
| 01 JUL 2026 | A00131299 | Waco District | Bridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82)) | 5 of 8 | $2,534,874 | +22% |
| 05 FEB 2026 | A00194041 | Dallas District | Bridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .) | 12 of 15 | $1,798,000 | +47% |
| 08 OCT 2025 | A00186870 | Bryan District | Bridge Replacement, FM 1580 (At Mims Creek to .) | 1 of 7 | $2,573,940 | Low, 7.0% under the second |
| 04 SEP 2025 | A00206363 | Waco District | Construct Pedestrian Infrastructure, Various (Carpenter Street from SH 164 to Bowie to Bowie St from Carpenter to Lumpkin) | 5 of 6 | $1,275,506 | +28% |
| 08 AUG 2025 | A00065636 | Fort Worth District | Bridge Replacement, MCVOID RD (MCVOID RD @ TRIB. OF WALNUT CREEK to .) | 3 of 8 | $919,220 | +11% |
| 08 AUG 2025 | A00065155 | Fort Worth District | Bridge Replacement, KINGS GATE RD (KINGS GATE to @ CLEAR FORK TRINITY RIVER) | 5 of 8 | $1,807,524 | +18% |
| 02 JUL 2025 | A00129184 | Dallas District | Bridge Replacement, HARRIS (HARRIS RD AT HOG CREEK to .) | 3 of 10 | $2,654,545 | +5.0% |
| 01 JUL 2025 | A00064769 | Dallas District | Bridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .) | 3 of 13 | $3,170,000 | +1.0% |
| 02 MAY 2025 | A00180846 | Waco District | Bridge Replacement, COUNTY ROAD 162 (FCR 245 @ Hogpen Creek to CR 162) | 5 of 8 | $2,759,995 | +23% |
| 01 MAY 2025 | A00138707 | Dallas District | Bridge Replacement, BI 45F (At Post Oak Creek to .) | 1 of 10 | $3,850,000 | Low, 3.0% under the second |
| 04 MAR 2025 | A00133339 | Fort Worth District | Bridge Replacement, COUNTY ROAD 270 (CR 270 AT TRIBUTARY TO NORTH BOSQUE to .) | 3 of 8 | $1,472,200 | +4.0% |
| 09 JUL 2024 | 07243019 | Bryan District | FM 80 Bridge replacement from AT SANDERS CREEK | 1 of 7 | $2,767,000 | Low, 3.0% under the second |
| 06 DEC 2023 | 12233222 | Paris District | CR Bridge replacement from CR 1495 to AT WOODBURY CREEK | 3 of 8 | $452,114 | +7.0% |
| 03 AUG 2023 | 08233270 | Fort Worth District | CR Bridge replacement from NEW HOPE ROAD AT WARD BRANCH | 1 of 3 | $724,492 | Low, 32% under the second |
| 02 AUG 2023 | 08233055 | Bryan District | CR Bridge replacement from ON CR 481 (F-CR 134) to AT UPPER KEECHI CREEK | 2 of 5 | $639,933 | +5.0% |
| 08 MAR 2023 | 03233240 | Tyler District | CR Bridge replacement from CR 2112, 3.00 MI S. OF SH20 W OF CA to AT CANEY CREEK | 4 of 7 | $569,000 | +9.0% |
| 07 MAR 2023 | 03233027 | Waco District | SH 81 Bridge maintenance from AT LITTLE HACKBERRY CREEK to (STR #077) | 1 of 6 | $1,619,000 | Low, 1.0% under the second |
| 01 DEC 2022 | 12223026 | Waco District | CR Bridge replacement from CR 274 @ CLEAR CREEK to (MAP #029) | 1 of 5 | $673,333 | Low, 8.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way