Pmco Construction LLC: TxDOT bid record

Pmco Construction LLC submitted 25 bids on Texas DOT contracts in the data, from 01 DEC 2022 to 03 SEP 2026, and was the low bidder on 6 of them (24%). When it was not low, its total sat a median +16% above the low bid.

Owner
Texas DOT
Low bid volume
$12,207,764
Latest bid
03 SEP 2026
Data through
19 NOV 2026
25Bids
6Low bids
24Win rate, percent
+16%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
202211100%
20235240%
202411100%
20259222%
2026900%
Pmco Construction LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District6117%
Waco District5240%
Bryan District5240%
Fort Worth District5120%
Paris District200%
Tyler District100%
Wichita Falls District100%
Pmco Construction LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF245 (21%)$1.15$1.00
Guardrail end treatment (install)544-7001EACH225 (23%)$3,232.50$3,245.00
Portable changeable message sign503-7002EACH145 (36%)$7,750.00$10,000
Preparing row100-7002STA234 (17%)$3,600.00$2,750.00
Rock filter dams (install) (type 2)506-7002LF184 (22%)$39.50$40.00
Metal W-beam guard fence (timber post)540-7001LF144 (29%)$25.15$27.00
Rail (type T223)450-7008LF94 (44%)$150.00$160.00
Rock filter dams (remove)506-7011LF243 (13%)$11.00$12.00
Excavation (roadway)110-7001CY193 (16%)$24.00$20.00
Metal beam guard fence trans (thrie-beam)540-7005EACH93 (33%)$2,025.00$2,140.00
Barricades, signs and traffic handling502-7001MO252 (8%)$3,500.00$5,000.00
Cem stabil BKFL400-7010CY222 (9%)$287.50$200.00
Pmco Construction LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Pmco Construction LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 SEP 2026A00189990Bryan DistrictBridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK)4 of 7$1,165,655+2.0%
03 SEP 2026A00127879Paris DistrictBridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK)4 of 8$2,509,509+18%
02 SEP 2026A00206056Wichita Falls DistrictConstruct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR)5 of 7$1,198,364+16%
06 AUG 2026A00211130Dallas DistrictBridge Maintenance, IH 45 (N of CR 4742 to S of CR 4744)9 of 9$774,798+61%
05 AUG 2026A00189992Bryan DistrictBridge Replacement, COUNTY ROAD 244 (On CR 244 (F-CR 265) to At Eads Creek)4 of 8$2,755,532+7.0%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)5 of 10$1,794,044+17%
05 AUG 2026A00217911Dallas DistrictBridge Maintenance, US 80 (at Big Brushy Creek to .)9 of 10$1,287,749+61%
01 JUL 2026A00131299Waco DistrictBridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82))5 of 8$2,534,874+22%
05 FEB 2026A00194041Dallas DistrictBridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .)12 of 15$1,798,000+47%
08 OCT 2025A00186870Bryan DistrictBridge Replacement, FM 1580 (At Mims Creek to .)1 of 7$2,573,940Low, 7.0% under the second
04 SEP 2025A00206363Waco DistrictConstruct Pedestrian Infrastructure, Various (Carpenter Street from SH 164 to Bowie to Bowie St from Carpenter to Lumpkin)5 of 6$1,275,506+28%
08 AUG 2025A00065636Fort Worth DistrictBridge Replacement, MCVOID RD (MCVOID RD @ TRIB. OF WALNUT CREEK to .)3 of 8$919,220+11%
08 AUG 2025A00065155Fort Worth DistrictBridge Replacement, KINGS GATE RD (KINGS GATE to @ CLEAR FORK TRINITY RIVER)5 of 8$1,807,524+18%
02 JUL 2025A00129184Dallas DistrictBridge Replacement, HARRIS (HARRIS RD AT HOG CREEK to .)3 of 10$2,654,545+5.0%
01 JUL 2025A00064769Dallas DistrictBridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .)3 of 13$3,170,000+1.0%
02 MAY 2025A00180846Waco DistrictBridge Replacement, COUNTY ROAD 162 (FCR 245 @ Hogpen Creek to CR 162)5 of 8$2,759,995+23%
01 MAY 2025A00138707Dallas DistrictBridge Replacement, BI 45F (At Post Oak Creek to .)1 of 10$3,850,000Low, 3.0% under the second
04 MAR 2025A00133339Fort Worth DistrictBridge Replacement, COUNTY ROAD 270 (CR 270 AT TRIBUTARY TO NORTH BOSQUE to .)3 of 8$1,472,200+4.0%
09 JUL 202407243019Bryan DistrictFM 80 Bridge replacement from AT SANDERS CREEK1 of 7$2,767,000Low, 3.0% under the second
06 DEC 202312233222Paris DistrictCR Bridge replacement from CR 1495 to AT WOODBURY CREEK3 of 8$452,114+7.0%
03 AUG 202308233270Fort Worth DistrictCR Bridge replacement from NEW HOPE ROAD AT WARD BRANCH1 of 3$724,492Low, 32% under the second
02 AUG 202308233055Bryan DistrictCR Bridge replacement from ON CR 481 (F-CR 134) to AT UPPER KEECHI CREEK2 of 5$639,933+5.0%
08 MAR 202303233240Tyler DistrictCR Bridge replacement from CR 2112, 3.00 MI S. OF SH20 W OF CA to AT CANEY CREEK4 of 7$569,000+9.0%
07 MAR 202303233027Waco DistrictSH 81 Bridge maintenance from AT LITTLE HACKBERRY CREEK to (STR #077)1 of 6$1,619,000Low, 1.0% under the second
01 DEC 202212223026Waco DistrictCR Bridge replacement from CR 274 @ CLEAR CREEK to (MAP #029)1 of 5$673,333Low, 8.0% under the second
Pmco Construction LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy