TxDOT contract A00129184 bid tabulation

Bridge Replacement, HARRIS (HARRIS RD AT HOG CREEK to .). Let by Texas DOT on July 2, 2025, Ellis, Dallas District. 10 bids received; low bid $2,531,308 by Westfield Insurance Company, -14% against the engineer's estimate of $2,929,683.

Owner
Texas DOT
Letting
02 JUL 2025
Pay items
68
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Westfield Insurance Company$2,531,308Low-14%
2STX Civil$2,552,679+1.0%-13%
3Pmco Construction LLC$2,654,545+5.0%-9.0%
4Knife River Corporation - South$2,673,956+6.0%-9.0%
5Hodges and Son Construction Company, Inc.$2,904,746+15%-1.0%
6Texas Steel Industrial Placing, LLC$3,030,860+20%+3.0%
7Grey Sky Construction LLC$3,173,561+25%+8.0%
8Altus Construction LLC$3,233,913+28%+10%
9Urban Infraconstruction LLC$3,248,850+28%+11%
10Indus Road & Bridge, Inc.$3,800,487+50%+30%
TxDOT contract A00129184: bids by rank

Engineer's estimate: $2,929,683.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Westfield Insurance Company2. STX Civil3. Pmco Construction LLC4. Knife River Corporation - South5. Hodges and Son Construction Company, Inc.6. Texas Steel Industrial Placing, LLC
1Preparing row (100-7002)STA13.10$8,000.00$10,709$3,700.00$3,700.00$8,500.00$5,750.00$6,000.00
2Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001)SY754$8.00$10.36$35.00$15.00$4.00$10.00$10.00
3Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY790$10.36$20.00$15.00$4.00$10.00$20.00
4Excavation (roadway) (110-7001)CY886$25.00$43.60$30.00$25.00$50.00$15.00$25.00
5Embankment (final)(DC)(type C1) (132-7008)CY2,894$30.00$21.80$23.00$27.00$38.00$30.00$30.00
6Compost manuf topsoil (4") (161-7002)SY2,521$7.00$1.91$4.75$2.00$5.00$2.50$4.00
7Drill seed (permanent_rural_clay) (164-7010)SY2,521$0.50$1.09$0.35$1.10$2.40$2.00$1.00
8Drill seed (temporary_warm_cool) (164-7015)SY2,521$0.30$1.09$0.35$1.10$2.40$1.00$1.00
9Vegetative watering (168-7001)TGL750$30.00$19.62$45.00$1.00$1.00$1.00$1.00
10FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY2,805$35.00$34.34$35.50$50.00$39.00$75.00$40.00
11Prime coat(MC-30 or AE-P) (310-7013)GAL538$10.00$6.00$8.50$28.00$14.00$25.00$25.00
12Asphalt (CRS-2P) (316-7012)GAL672$15.00$21.80$6.00$26.00$14.00$25.00$25.00
13Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL1,530$15.00$17.44$6.00$41.00$8.00$18.00$30.00
14Aggregate (type-B or L, GR-3)(sac-B) (316-7244)CY26$200.00$1,090.00$160.00$1,600.00$700.00$1,000.00$1,700.00
15Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245)CY22$330.00$1,090.00$750.00$1,850.00$800.00$1,000.00$1,700.00
16Cem stabil BKFL (400-7010)CY167$239.80$750.00$275.00$325.00$290.00$200.00
17Drilled shaft (24 in) (416-7004)LF354$207.10$190.00$235.00$276.00$185.00$369.00
18Drilled shaft (30 in) (416-7005)LF330$250.70$220.00$295.00$310.00$225.00$470.00
19Drilled shaft (36 in) (416-7006)LF165$261.60$230.00$320.00$325.00$235.00$491.00
20Class C concrete (abutment)(HPC) (420-7013)CY56.80$1,308.00$1,500.00$1,500.00$1,750.00$2,000.00$1,325.00
21Class C concrete (cap)(HPC) (420-7023)CY13.20$1,471.50$1,700.00$2,400.00$2,500.00$2,200.00$1,500.00
22Reinforced concrete slab (HPC) (422-7002)SF4,420$26.16$25.00$34.00$32.00$30.00$25.00
23Approach slab (HPC) (422-7014)CY78$708.50$700.00$900.00$775.00$800.00$750.00
24Prestressed concrete girder (TX28) (425-7001)LF278$216.37$290.00$285.00$300.00$260.00$345.00
25Prestressed concrete slab beam (5SB15) (425-7019)LF492.52$263.10$245.00$315.00$300.00$380.00$360.00
26Riprap (mow strip)(4 in) (432-7013)CY65$750.00$953.75$625.00$800.00$700.00$650.00$700.00
27Riprap (stone protection)(12 in) (432-7041)CY1,041$200.00$196.20$280.00$160.00$160.00$215.00$205.00
28Rail (type T221)(HPC) (450-7005)LF412$212.55$170.00$155.00$160.00$160.00$160.00
29Armor joint (sealed) (454-7003)LF50$130.80$165.00$143.00$190.00$200.00$150.00
30Sealed expansion joint (4 in) (SEJ - B) (454-7006)LF51$152.60$155.00$205.00$190.00$250.00$150.00
31Concrete box culvert (10 FT X 10 FT) (462-7038)LF159$2,250.00$1,526.00$1,500.00$1,600.00$1,200.00$1,800.00$1,800.00
32RC pipe (CL III)(12 in) (464-7001)LF42$80.00$70.85$80.00$130.00$85.00$80.00$100.00
33RC pipe (CL III)(15 in) (464-7002)LF26$114.45$85.00$130.00$95.00$95.00$120.00
34Wingwall (PW - 1) (HW=12 FT) (466-7182)EACH2$50,000$59,950$70,000$59,000$75,000$140,000$90,000
35Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292)EACH2$1,150.00$981.00$875.00$1,500.00$1,200.00$2,200.00$1,200.00
36Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300)EACH2$1,724.38$1,150.75$1,800.00$1,200.00$2,200.00$1,500.00
37Removing structure (pipe) (496-7007)LF78$75.00$29.43$140.00$45.00$20.00$50.00$60.00
38Removing structure (bridge 0 - 99 FT length) (496-7009)EACH3$50,000$16,350$45,000$30,000$22,000$45,000$40,000
39Mobilization (500-7001)LS1$280,000$256,500$166,998$240,000$265,000$240,000$300,000
40Barricades, signs and traffic handling (502-7001)MO10$14,000$3,815.00$2,800.00$3,500.00$3,000.00$2,000.00$1,500.00
41Portable changeable message sign (503-7002)EACH3$12,000$11,990$7,500.00$7,000.00$15,000$20,000$30,000
42Rock filter dams (install) (type 2) (506-7002)LF824$45.00$38.15$45.00$37.00$55.00$1.00$45.00
43Rock filter dams (remove) (506-7011)LF824$20.00$13.08$10.00$13.00$22.00$1.00$15.00
44Construction exits (install) (type 1) (506-7020)SY516$40.00$40.33$30.00$39.00$25.00$1.00$40.00
45Construction exits (remove) (506-7024)SY516$15.00$13.08$10.00$13.00$10.00$1.00$15.00
46Temporary sediment control fence (install) (506-7039)LF2,639$5.00$4.14$4.50$4.00$8.00$1.00$4.00
47Temporary sediment control fence (remove) (506-7041)LF2,639$2.50$1.36$1.00$1.35$1.50$1.00$1.00
48Driveways (surface treat) (530-7016)SY244$160.00$35.97$50.00$70.00$65.00$60.00$75.00
49Metal W-beam guard fence (timber post) (540-7001)LF600$50.00$24.53$26.00$23.75$27.00$24.00$25.00
50Metal beam guard fence trans (TL2) (540-7006)EACH5$1,308.00$1,150.00$1,270.00$1,350.00$1,200.00$1,350.00
51Downstream anchor terminal section (540-7015)EACH6$1,550.00$1,308.00$1,350.00$1,270.00$1,450.00$1,500.00$1,500.00
52Guardrail end treatment (install) (544-7001)EACH5$3,000.00$3,215.50$2,900.00$3,125.00$3,200.00$3,000.00$3,150.00
53Crash cushion attenuator (install)(L)(N)(TL2) (545-7005)EACH1$22,890$28,500$23,000$30,000$30,000$25,000
54Remove and install existing gate (550-7017)EACH2$1,008.25$2,600.00$1,000.00$2,000.00$500.00$2,000.00
55Wire fence (type C) (552-7003)LF1,396$30.00$27.14$26.00$20.00$16.00$20.00$20.00
56Wire fence (water gap) (552-7010)LF100$32.16$55.00$48.00$100.00$80.00$45.00
57Wire fence (remove) (552-7011)LF1,262$10.00$11.99$5.50$2.00$5.00$4.00$2.00
58Mailbox install-S (TWG-post) type 2 (560-7002)EACH1$350.00$327.00$290.00$396.00$500.00$1,000.00$300.00
59Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH8$800.00$817.50$725.50$795.00$850.00$1,000.00$800.00
60Relocate SM RD SN sup&AM(sign only) (644-7072)EACH2$450.00$699.79$585.25$700.00$800.00$500.00$600.00
61Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004)EACH3$85.00$49.05$37.00$55.00$100.00$500.00$30.00
62Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH10$21.80$32.00$28.00$22.22$20.00$30.00
63Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH11$40.00$27.25$55.00$34.99$30.00$25.00$30.00
64Pavement sler 6" (666-7347)LF1,004$2.18$0.50$4.00$1.10$2.00$2.00
65Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF2,620$2.00$1.09$1.20$1.08$3.30$2.00$3.00
66Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF2,620$2.20$1.09$1.80$1.08$3.30$2.00$3.00
67Reflectorized pavement marker type II-A-A (672-7004)EACH34$10.00$5.45$6.25$7.85$33.00$5.00$30.00
68Pavement surface preparation for marking (6") (678-7002)LF1,004$1.09$0.50$2.84$0.60$1.00$1.00
TxDOT contract A00129184: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy