TxDOT contract A00065155 bid tabulation
Bridge Replacement, KINGS GATE RD (KINGS GATE to @ CLEAR FORK TRINITY RIVER). Let by Texas DOT on August 8, 2025, Parker, Fort Worth District. 8 bids received; low bid $1,536,599 by Westfield Insurance Company, -14% against the engineer's estimate of $1,776,975.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Westfield Insurance Company | $1,536,599 | Low | -14% |
| 2 | STX Civil | $1,656,064 | +8.0% | -7.0% |
| 3 | Hodges and Son Construction Company, Inc. | $1,734,885 | +13% | -2.0% |
| 4 | Scott Tucker Construction Company, LLC | $1,796,218 | +17% | +1.0% |
| 5 | Pmco Construction LLC | $1,807,524 | +18% | +2.0% |
| 6 | Texas Steel Industrial Placing, LLC | $1,819,233 | +18% | +2.0% |
| 7 | Skyline Bridge LLC | $1,867,514 | +22% | +5.0% |
| 8 | Ed Bell Construction Company | $1,947,946 | +27% | +10% |
Engineer's estimate: $1,776,975.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Westfield Insurance Company | 2. STX Civil | 3. Hodges and Son Construction Company, Inc. | 4. Scott Tucker Construction Company, LLC | 5. Pmco Construction LLC | 6. Texas Steel Industrial Placing, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 4.40 | $7,500.00 | $2,200.00 | $1,000.00 | $7,000.00 | $3,691.00 | $6,000.00 | $3,000.00 |
| 2 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 3 | $800.00 | $550.00 | $3,000.00 | $3,000.00 | $2,502.00 | $3,000.00 | $600.00 |
| 3 | Excavation (roadway & channel) (110-7004) | CY | 1,089 | $50.00 | $22.00 | $35.00 | $25.00 | $58.00 | $24.00 | $20.00 |
| 4 | Embankment (final)(DC)(type B) (132-7004) | CY | 1,453 | $35.00 | $22.00 | $38.00 | $30.00 | $51.00 | $36.00 | $20.00 |
| 5 | Compost manuf topsoil (4") (161-7002) | SY | 1,104 | $1.00 | $2.20 | $5.00 | $4.00 | $10.00 | $3.25 | $3.75 |
| 6 | Block sodding (162-7002) | SY | 1,104 | $12.00 | $6.05 | $10.00 | $6.00 | $6.00 | $6.00 | $9.00 |
| 7 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 1,104 | $1.00 | $0.88 | $0.50 | $1.00 | $2.00 | $2.00 | $1.00 |
| 8 | Vegetative watering (168-7001) | TGL | 78 | $26.00 | $55.00 | $75.00 | $1.00 | $128.00 | $100.00 | $50.00 |
| 9 | Lime (com or QK)(slurry) (260-7005) | TON | 21 | $220.00 | $346.50 | $375.00 | $300.00 | $379.00 | $500.00 | $350.00 |
| 10 | Lime TRT (subgrade) (8") (260-7020) | SY | 1,261 | $7.00 | $13.20 | $35.00 | $20.00 | $32.00 | $20.00 | $13.00 |
| 11 | Salvage, haul & stockpile reclaimed asphalt PV (4 to 6") (305-7004) | SY | 941 | $3.00 | $8.36 | $20.00 | $10.00 | $16.00 | $12.00 | $10.00 |
| 12 | Concrete pavement (CRCP) (7") (360-7001) | SY | 1,233 | $140.00 | $118.81 | $130.00 | $150.00 | $102.00 | $99.00 | $150.00 |
| 13 | Cem stabil BKFL (400-7010) | CY | 240 | $280.00 | $221.17 | $240.00 | $250.00 | $227.00 | $300.00 | $150.00 |
| 14 | Trench excavation protection (402-7001) | LF | 358 | $22.00 | $11.00 | $15.00 | $5.00 | $39.00 | $30.00 | $14.00 |
| 15 | Drilled shaft (18 in) (416-7002) | LF | 218 | $160.00 | $149.60 | $180.00 | $95.00 | $195.00 | $195.00 | $250.00 |
| 16 | Drilled shaft (36 in) (416-7006) | LF | 545 | $300.00 | $254.10 | $250.00 | $215.00 | $317.00 | $315.00 | $400.00 |
| 17 | Class C concrete (abutment)(HPC) (420-7013) | CY | 65.40 | $1,450.00 | $1,320.00 | $1,150.00 | $950.00 | $1,167.00 | $1,300.00 | $1,500.00 |
| 18 | Reinforced concrete slab (HPC) (422-7002) | SF | 4,796 | $28.00 | $30.80 | $26.00 | $35.00 | $29.00 | $36.00 | $27.00 |
| 19 | Approach slab (422-7013) | CY | 80.40 | $740.00 | $825.00 | $715.00 | $850.00 | $852.00 | $850.00 | $750.00 |
| 20 | Prestressed concrete girder (TX46) (425-7004) | LF | 651.30 | $200.00 | $235.08 | $280.00 | $350.00 | $341.00 | $350.00 | $366.41 |
| 21 | Riprap (mow strip)(4 in) (432-7013) | CY | 16 | $600.00 | $605.00 | $750.00 | $650.00 | $1,721.00 | $825.00 | $650.00 |
| 22 | Riprap (stone protection)(24 in) (432-7045) | CY | 1,070 | $160.00 | $192.50 | $220.00 | $190.00 | $152.00 | $180.00 | $180.00 |
| 23 | Rail (type T223)(HPC) (450-7009) | LF | 282 | $150.00 | $183.70 | $180.00 | $160.00 | $246.00 | $160.00 | $150.00 |
| 24 | Armor joint (sealed) (454-7003) | LF | 80 | $140.00 | $181.50 | $170.00 | $225.00 | $71.00 | $130.00 | $150.00 |
| 25 | CMP (gal steel 12 in) (460-7001) | LF | 16 | $75.00 | $123.75 | $90.00 | $200.00 | $61.00 | $215.00 | $250.00 |
| 26 | Headwall (CH - FW - 0) (diameter= 24 in) (466-7005) | EACH | 1 | $15,500 | $9,900.00 | $12,000 | $6,000.00 | $9,615.00 | $7,500.00 | $18,250 |
| 27 | Set (type II) (12 in) (CMP) (6: 1) (P) (467-7288) | EACH | 2 | $970.00 | $1,452.00 | $1,100.00 | $2,500.00 | $2,112.00 | $2,000.00 | $3,000.00 |
| 28 | Removing & RE - lay pipe (24 in) (472-7006) | LF | 63 | $75.00 | $110.00 | $190.00 | $30.00 | $172.00 | $80.00 | $200.00 |
| 29 | Removing structure (wingwall) (496-7005) | EACH | 2 | $2,400.00 | $1,045.00 | $2,700.00 | $5,000.00 | $747.00 | $5,000.00 | $1,200.00 |
| 30 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $40,000 | $11,000 | $35,000 | $50,000 | $49,951 | $60,000 | $60,000 |
| 31 | Mobilization (500-7001) | LS | 1 | $154,998 | $167,400 | $125,000 | $150,000 | $179,571 | $180,000 | $183,232 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $9,000.00 | $2,750.00 | $1,500.00 | $6,000.00 | $1,166.00 | $3,000.00 | $2,400.00 |
| 33 | Portable changeable message sign (503-7002) | EACH | 1 | $10,000 | $13,200 | $7,500.00 | $20,000 | $12,469 | $6,000.00 | $30,000 |
| 34 | Rock filter dams (install) (type 2) (506-7002) | LF | 224 | $35.00 | $26.40 | $55.00 | $1.00 | $28.00 | $27.00 | $40.00 |
| 35 | Rock filter dams (remove) (506-7011) | LF | 224 | $15.00 | $11.00 | $10.00 | $1.00 | $12.00 | $10.00 | $10.00 |
| 36 | Construction exits (install) (type 1) (506-7020) | SY | 78 | $33.00 | $25.30 | $60.00 | $1.00 | $27.00 | $27.00 | $40.00 |
| 37 | Construction exits (remove) (506-7024) | SY | 78 | $11.00 | $11.00 | $10.00 | $1.00 | $32.00 | $10.00 | $10.00 |
| 38 | Temporary sediment control fence (install) (506-7039) | LF | 586 | $3.00 | $4.40 | $5.00 | $1.00 | $5.00 | $4.50 | $5.00 |
| 39 | Temporary sediment control fence (remove) (506-7041) | LF | 586 | $1.00 | $1.65 | $1.00 | $1.00 | $2.00 | $1.75 | $2.00 |
| 40 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 54 | $8.00 | $7.70 | $10.00 | $10.00 | $8.00 | $9.00 | $10.00 |
| 41 | Biodegradable erosion control logs (remove) (506-7046) | LF | 54 | $2.00 | $2.20 | $2.00 | $1.00 | $3.00 | $3.70 | $2.00 |
| 42 | Concrete curb (mono) (type II) (529-7007) | LF | 592 | $115.00 | $31.23 | $35.00 | $60.00 | $11.00 | $25.00 | $30.00 |
| 43 | Driveways (concrete) (hes) (530-7007) | SY | 166 | $540.00 | $104.54 | $120.00 | $140.00 | $152.00 | $200.00 | $110.00 |
| 44 | Metal W-beam guard fence (timber post) (540-7001) | LF | 62.50 | $26.00 | $24.75 | $38.00 | $26.00 | $46.00 | $46.00 | $30.00 |
| 45 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 2 | $1,450.00 | $1,320.00 | $1,500.00 | $1,500.00 | $1,645.00 | $1,390.00 | $2,000.00 |
| 46 | Short radius (28") (540-7013) | LF | 12.50 | $100.00 | $25.85 | $50.00 | $50.00 | $179.00 | $55.00 | $50.00 |
| 47 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,250.00 | $1,375.00 | $1,800.00 | $1,600.00 | $1,156.00 | $1,500.00 | $1,600.00 |
| 48 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 2 | $1,000.00 | $770.00 | $1,000.00 | $900.00 | $678.00 | $1,000.00 | $1,000.00 |
| 49 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,200.00 | $3,300.00 | $3,200.00 | $3,200.00 | $3,263.00 | $3,400.00 | $3,400.00 |
| 50 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 1 | $900.00 | $1,028.50 | $800.00 | $2,000.00 | $1,567.00 | $1,200.00 | $1,000.00 |
| 51 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $25.00 | $22.00 | $35.00 | $20.00 | $110.00 | $30.00 | $30.00 |
| 52 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 6 | $21.00 | $22.00 | $45.00 | $25.00 | $55.00 | $40.00 | $30.00 |
| 53 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 4 | $80.00 | $55.00 | $80.00 | $500.00 | $146.00 | $100.00 | $120.00 |
| 54 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 14 | $7.00 | $22.00 | $24.50 | $20.00 | $29.00 | $28.00 | $20.00 |
| 55 | Pavement sler 6" (666-7347) | LF | 1,496 | $1.00 | $0.94 | $1.00 | $1.00 | $2.00 | $1.00 | $0.85 |
| 56 | Pavement sler 24" (666-7352) | LF | 14 | $2.50 | $2.75 | $3.00 | $3.00 | $3.00 | $9.00 | $2.50 |
| 57 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 770 | $1.00 | $3.30 | $3.60 | $3.00 | $4.00 | $3.50 | $3.00 |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 726 | $1.00 | $3.30 | $3.60 | $3.00 | $4.00 | $3.50 | $3.00 |
| 59 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 9 | $6.00 | $16.50 | $18.00 | $20.00 | $15.00 | $18.50 | $15.00 |
| 60 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,496 | $1.00 | $0.55 | $0.60 | $0.50 | $1.00 | $0.70 | $0.50 |
| 61 | Pavement surface preparation for marking (24") (678-7008) | LF | 14 | $1.50 | $1.10 | $1.20 | $1.00 | $1.00 | $2.60 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.