TxDOT contract A00065155 bid tabulation

Bridge Replacement, KINGS GATE RD (KINGS GATE to @ CLEAR FORK TRINITY RIVER). Let by Texas DOT on August 8, 2025, Parker, Fort Worth District. 8 bids received; low bid $1,536,599 by Westfield Insurance Company, -14% against the engineer's estimate of $1,776,975.

Owner
Texas DOT
Letting
08 AUG 2025
Pay items
61
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Westfield Insurance Company$1,536,599Low-14%
2STX Civil$1,656,064+8.0%-7.0%
3Hodges and Son Construction Company, Inc.$1,734,885+13%-2.0%
4Scott Tucker Construction Company, LLC$1,796,218+17%+1.0%
5Pmco Construction LLC$1,807,524+18%+2.0%
6Texas Steel Industrial Placing, LLC$1,819,233+18%+2.0%
7Skyline Bridge LLC$1,867,514+22%+5.0%
8Ed Bell Construction Company$1,947,946+27%+10%
TxDOT contract A00065155: bids by rank

Engineer's estimate: $1,776,975.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Westfield Insurance Company2. STX Civil3. Hodges and Son Construction Company, Inc.4. Scott Tucker Construction Company, LLC5. Pmco Construction LLC6. Texas Steel Industrial Placing, LLC
1Preparing row (100-7002)STA4.40$7,500.00$2,200.00$1,000.00$7,000.00$3,691.00$6,000.00$3,000.00
2Preparation row (tree remove) (0"-12" diameter) (100-7003)EACH3$800.00$550.00$3,000.00$3,000.00$2,502.00$3,000.00$600.00
3Excavation (roadway & channel) (110-7004)CY1,089$50.00$22.00$35.00$25.00$58.00$24.00$20.00
4Embankment (final)(DC)(type B) (132-7004)CY1,453$35.00$22.00$38.00$30.00$51.00$36.00$20.00
5Compost manuf topsoil (4") (161-7002)SY1,104$1.00$2.20$5.00$4.00$10.00$3.25$3.75
6Block sodding (162-7002)SY1,104$12.00$6.05$10.00$6.00$6.00$6.00$9.00
7Broadcast seed (temporary_warm_cool) (164-7007)SY1,104$1.00$0.88$0.50$1.00$2.00$2.00$1.00
8Vegetative watering (168-7001)TGL78$26.00$55.00$75.00$1.00$128.00$100.00$50.00
9Lime (com or QK)(slurry) (260-7005)TON21$220.00$346.50$375.00$300.00$379.00$500.00$350.00
10Lime TRT (subgrade) (8") (260-7020)SY1,261$7.00$13.20$35.00$20.00$32.00$20.00$13.00
11Salvage, haul & stockpile reclaimed asphalt PV (4 to 6") (305-7004)SY941$3.00$8.36$20.00$10.00$16.00$12.00$10.00
12Concrete pavement (CRCP) (7") (360-7001)SY1,233$140.00$118.81$130.00$150.00$102.00$99.00$150.00
13Cem stabil BKFL (400-7010)CY240$280.00$221.17$240.00$250.00$227.00$300.00$150.00
14Trench excavation protection (402-7001)LF358$22.00$11.00$15.00$5.00$39.00$30.00$14.00
15Drilled shaft (18 in) (416-7002)LF218$160.00$149.60$180.00$95.00$195.00$195.00$250.00
16Drilled shaft (36 in) (416-7006)LF545$300.00$254.10$250.00$215.00$317.00$315.00$400.00
17Class C concrete (abutment)(HPC) (420-7013)CY65.40$1,450.00$1,320.00$1,150.00$950.00$1,167.00$1,300.00$1,500.00
18Reinforced concrete slab (HPC) (422-7002)SF4,796$28.00$30.80$26.00$35.00$29.00$36.00$27.00
19Approach slab (422-7013)CY80.40$740.00$825.00$715.00$850.00$852.00$850.00$750.00
20Prestressed concrete girder (TX46) (425-7004)LF651.30$200.00$235.08$280.00$350.00$341.00$350.00$366.41
21Riprap (mow strip)(4 in) (432-7013)CY16$600.00$605.00$750.00$650.00$1,721.00$825.00$650.00
22Riprap (stone protection)(24 in) (432-7045)CY1,070$160.00$192.50$220.00$190.00$152.00$180.00$180.00
23Rail (type T223)(HPC) (450-7009)LF282$150.00$183.70$180.00$160.00$246.00$160.00$150.00
24Armor joint (sealed) (454-7003)LF80$140.00$181.50$170.00$225.00$71.00$130.00$150.00
25CMP (gal steel 12 in) (460-7001)LF16$75.00$123.75$90.00$200.00$61.00$215.00$250.00
26Headwall (CH - FW - 0) (diameter= 24 in) (466-7005)EACH1$15,500$9,900.00$12,000$6,000.00$9,615.00$7,500.00$18,250
27Set (type II) (12 in) (CMP) (6: 1) (P) (467-7288)EACH2$970.00$1,452.00$1,100.00$2,500.00$2,112.00$2,000.00$3,000.00
28Removing & RE - lay pipe (24 in) (472-7006)LF63$75.00$110.00$190.00$30.00$172.00$80.00$200.00
29Removing structure (wingwall) (496-7005)EACH2$2,400.00$1,045.00$2,700.00$5,000.00$747.00$5,000.00$1,200.00
30Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$40,000$11,000$35,000$50,000$49,951$60,000$60,000
31Mobilization (500-7001)LS1$154,998$167,400$125,000$150,000$179,571$180,000$183,232
32Barricades, signs and traffic handling (502-7001)MO8$9,000.00$2,750.00$1,500.00$6,000.00$1,166.00$3,000.00$2,400.00
33Portable changeable message sign (503-7002)EACH1$10,000$13,200$7,500.00$20,000$12,469$6,000.00$30,000
34Rock filter dams (install) (type 2) (506-7002)LF224$35.00$26.40$55.00$1.00$28.00$27.00$40.00
35Rock filter dams (remove) (506-7011)LF224$15.00$11.00$10.00$1.00$12.00$10.00$10.00
36Construction exits (install) (type 1) (506-7020)SY78$33.00$25.30$60.00$1.00$27.00$27.00$40.00
37Construction exits (remove) (506-7024)SY78$11.00$11.00$10.00$1.00$32.00$10.00$10.00
38Temporary sediment control fence (install) (506-7039)LF586$3.00$4.40$5.00$1.00$5.00$4.50$5.00
39Temporary sediment control fence (remove) (506-7041)LF586$1.00$1.65$1.00$1.00$2.00$1.75$2.00
40Biodegradable erosion control logs (install) (12") (506-7044)LF54$8.00$7.70$10.00$10.00$8.00$9.00$10.00
41Biodegradable erosion control logs (remove) (506-7046)LF54$2.00$2.20$2.00$1.00$3.00$3.70$2.00
42Concrete curb (mono) (type II) (529-7007)LF592$115.00$31.23$35.00$60.00$11.00$25.00$30.00
43Driveways (concrete) (hes) (530-7007)SY166$540.00$104.54$120.00$140.00$152.00$200.00$110.00
44Metal W-beam guard fence (timber post) (540-7001)LF62.50$26.00$24.75$38.00$26.00$46.00$46.00$30.00
45Metal beam guard fence trans (TL2) (540-7006)EACH2$1,450.00$1,320.00$1,500.00$1,500.00$1,645.00$1,390.00$2,000.00
46Short radius (28") (540-7013)LF12.50$100.00$25.85$50.00$50.00$179.00$55.00$50.00
47Downstream anchor terminal section (540-7015)EACH2$1,250.00$1,375.00$1,800.00$1,600.00$1,156.00$1,500.00$1,600.00
48Metal beam guard fence trans (non - sym) (540-7016)EACH2$1,000.00$770.00$1,000.00$900.00$678.00$1,000.00$1,000.00
49Guardrail end treatment (install) (544-7001)EACH2$3,200.00$3,300.00$3,200.00$3,200.00$3,263.00$3,400.00$3,400.00
50Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH1$900.00$1,028.50$800.00$2,000.00$1,567.00$1,200.00$1,000.00
51Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$25.00$22.00$35.00$20.00$110.00$30.00$30.00
52Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016)EACH6$21.00$22.00$45.00$25.00$55.00$40.00$30.00
53Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH4$80.00$55.00$80.00$500.00$146.00$100.00$120.00
54Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF14$7.00$22.00$24.50$20.00$29.00$28.00$20.00
55Pavement sler 6" (666-7347)LF1,496$1.00$0.94$1.00$1.00$2.00$1.00$0.85
56Pavement sler 24" (666-7352)LF14$2.50$2.75$3.00$3.00$3.00$9.00$2.50
57Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF770$1.00$3.30$3.60$3.00$4.00$3.50$3.00
58Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF726$1.00$3.30$3.60$3.00$4.00$3.50$3.00
59Reflectorized pavement marker type II-A-A (672-7004)EACH9$6.00$16.50$18.00$20.00$15.00$18.50$15.00
60Pavement surface preparation for marking (6") (678-7002)LF1,496$1.00$0.55$0.60$0.50$1.00$0.70$0.50
61Pavement surface preparation for marking (24") (678-7008)LF14$1.50$1.10$1.20$1.00$1.00$2.60$1.00
TxDOT contract A00065155: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy