Highway 19 Construction LLC: TxDOT bid record
Highway 19 Construction LLC submitted 234 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 56 of them (24%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $383,776,448
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 39 | 7 | 18% |
| 2021 | 45 | 11 | 24% |
| 2022 | 20 | 8 | 40% |
| 2023 | 35 | 10 | 29% |
| 2024 | 10 | 3 | 30% |
| 2025 | 41 | 6 | 15% |
| 2026 | 44 | 11 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Paris District | 106 | 36 | 34% |
| Tyler District | 48 | 10 | 21% |
| Dallas District | 36 | 4 | 11% |
| Atlanta District | 27 | 3 | 11% |
| Lufkin District | 8 | 2 | 25% |
| Waco District | 3 | 0 | 0% |
| Fort Worth District | 3 | 0 | 0% |
| Houston District | 2 | 1 | 50% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 191 | 78 (41%) | $1.00 | $1.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 227 | 76 (33%) | $5,000.00 | $5,000.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 114 | 58 (51%) | $525.00 | $643.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 136 | 56 (41%) | $2,950.00 | $3,245.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 192 | 54 (28%) | $3.00 | $4.00 |
| RC pipe (CL III)(18 in) | 464-7003 | LF | 97 | 53 (55%) | $50.00 | $82.44 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 109 | 50 (46%) | $5.00 | $5.00 |
| Preparing row | 100-7002 | STA | 161 | 47 (29%) | $2,000.00 | $2,750.00 |
| Rock filter dams (remove) | 506-7011 | LF | 153 | 45 (29%) | $10.00 | $12.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 101 | 44 (44%) | $75.00 | $108.13 |
| Set (type II) (18 in) (RCP) (6: 1) (P) | 467-7308 | EACH | 86 | 44 (51%) | $786.00 | $1,300.00 |
| Portable changeable message sign | 503-7002 | EACH | 122 | 39 (32%) | $10,000 | $10,000 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 108 | 29 of 108 |
| Hodges and Son Construction Company, Inc. | 58 | 20 of 58 |
| Longview Bridge and Road, LTD. | 50 | 29 of 50 |
| FNH Construction, LLC | 44 | 3 of 44 |
| Garret Shields Infrastructure | 44 | 27 of 44 |
| Ed Bell Construction Company | 42 | 14 of 42 |
| A. K. Gillis & Sons, LLC | 36 | 20 of 36 |
| THK Construction LLC | 36 | 25 of 36 |
| D. L. Lennon Incorporated - Contractor | 33 | 18 of 33 |
| Encino Landscape, Inc. | 27 | 7 of 27 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00196925 | Paris District | Widen Road - Add Shoulders, FM 35 (Creek Dr. to SH 276) | 1 of 9 | $6,803,596 | Low, 6.0% under the second |
| 04 NOV 2026 | A00224104 | Tyler District | TRAFFIC CONTROL SERVICES, US0175 (Various Locations within to Henderson and Anderson Counties) | 1 of 4 | $1,217,140 | Low, 7.0% under the second |
| 03 NOV 2026 | A00187429 | Paris District | Preventive Maintenance, BU 82H (SL 286 to 33rd ST SE) | 2 of 5 | $3,640,409 | +4.0% |
| 03 NOV 2026 | A00223921 | Tyler District | TRAFFIC CONTROL SERVICES, US0080 (Various Locations in to Gregg and Rusk Counties) | 1 of 4 | $1,372,080 | Low, 3.0% under the second |
| 06 OCT 2026 | A00221513 | Atlanta District | MILL AND INLAY, IH0030 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 5 of 5 | $7,362,000 | +34% |
| 06 OCT 2026 | A00221514 | Atlanta District | MILL AND INLAY, IH0020 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 2 of 4 | $6,179,500 | +1.0% |
| 06 OCT 2026 | A00207643 | Paris District | Rehabilitate Existing Roadway, US 69 (Spruce Street (Whitewright) to Lovers Lane (Bells)) | 1 of 7 | $9,878,022 | Low, 2.0% under the second |
| 16 SEP 2026 | A00222875 | Tyler District | CONCRETE SPALL REPAIR, US0080 (Various Locations in to the Tyler District) | 8 of 8 | $1,303,250 | +95% |
| 03 SEP 2026 | A00196194 | Atlanta District | Resurface Roadway, BU 271E (0.16 Mi N of FM 2152 to 0.06 Mi N of US 67) | 2 of 4 | $1,137,481 | +4.0% |
| 03 SEP 2026 | A00139727 | Paris District | Bridge Replacement, FM 911 (FM 911 to At Anderson Creek) | 5 of 8 | $1,696,242 | +15% |
| 03 SEP 2026 | A00127879 | Paris District | Bridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK) | 2 of 8 | $2,402,200 | +13% |
| 02 SEP 2026 | A00195348 | Paris District | Bridge Replacement, FM 44 (At White Oak Creek to .) | 1 of 7 | $1,792,908 | Low, 1.0% under the second |
| 02 SEP 2026 | A00210535 | Paris District | Intersection Improvement, SH 121 (DGNO Railroad to CR 4602) | 1 of 4 | $1,979,905 | Low, 15% under the second |
| 02 SEP 2026 | A00193937 | Dallas District | Intersection Improvement, SH 34 (At Abner Rd to .) | 2 of 7 | $1,077,944 | +12% |
| 20 AUG 2026 | A00220535 | Paris District | CONCRETE STRUCTURE REPAIR, SH0019 (Sam Bell Maxey House to at 812 S Church St, Paris, TX) | 1 of 2 | $262,821 | Low, 3.0% under the second |
| 20 AUG 2026 | A00218396 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, FM0897 (Various locations to Fannin and Hopkins County) | 7 of 8 | $699,368 | +30% |
| 20 AUG 2026 | A00222468 | Paris District | BRIDGE JOINT CLEANING AND SEALING, US0069 (Various locations in to Grayson County) | 11 of 12 | $201,880 | +82% |
| 06 AUG 2026 | A00196275 | Atlanta District | Resurface Roadway, SH 43 (US 59 to SL 390) | 3 of 5 | $3,442,165 | +4.0% |
| 06 AUG 2026 | A00049653 | Tyler District | Widen Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW) | 3 of 5 | $19,144,418 | +7.0% |
| 06 AUG 2026 | A00203348 | Atlanta District | Construct Rest Area, IH 30 (0.5 Mi W of CR 4204 to 0.5 Mi E of CR 4204) | 4 of 4 | $13,658,247 | +29% |
| 06 AUG 2026 | A00190819 | Paris District | Bridge Replacement, COUNTY ROAD 1018 (At Big Creek to .) | 4 of 5 | $1,791,859 | +20% |
| 05 AUG 2026 | A00206966 | Paris District | Construct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street) | 5 of 10 | $1,132,589 | +14% |
| 05 AUG 2026 | A00190871 | Paris District | Bridge Replacement, COUNTY ROAD 35080 (At Cottonwood Creek to .) | 4 of 8 | $984,748 | +23% |
| 05 AUG 2026 | A00217911 | Dallas District | Bridge Maintenance, US 80 (at Big Brushy Creek to .) | 7 of 10 | $1,178,670 | +47% |
| 02 JUL 2026 | A00027293 | Tyler District | Widen Road - Add Lanes, FM 756 (JEFF DAVIS DR (CR 1167), S to FM 346) | 4 of 9 | $63,873,899 | +9.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.