TxDOT contract A00223921 bid tabulation

TRAFFIC CONTROL SERVICES, US0080 (Various Locations in to Gregg and Rusk Counties). Let by Texas DOT on November 3, 2026, Gregg, Tyler District. 4 bids received; low bid $1,372,080 by Highway 19 Construction LLC, -2.4% against the engineer's estimate of $1,405,700.

Owner
Texas DOT
Letting
03 NOV 2026
Pay items
24
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Highway 19 Construction LLC$1,372,080Low-2.0%
2Flex Supply, LLC$1,415,950+3.0%+1.0%
3Awp Safety$1,999,200+46%+42%
4FC Traffic Control, Inc.$2,011,000+47%+43%
TxDOT contract A00223921: bids by rank

Engineer's estimate: $1,405,700.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Highway 19 Construction LLC2. Flex Supply, LLC3. Awp Safety4. FC Traffic Control, Inc.
1Mobilization (500-7001)LS1$70,000$24,000$28,000$45,000$500.00
2Mobilization (emergency) (500-7033)EACH5$1,000.00$1,000.00$100.00$1,500.00$100.00
3Portable changeable message sign (503-7001)DAY100$100.00$45.00$20.00$100.00$10.00
4TMA (stationary) (505-7001)DAY600$300.00$340.00$365.00$615.00$800.00
5TMA (mobile operation) (505-7002)HR100$70.00$70.00$70.00$90.00$100.00
6TMA (mobile operation) (505-7003)DAY650$300.00$320.00$410.00$700.00$800.00
7Lane closure(maintenance)(typ 1) (790-7020)HR4,000$85.00$105.00$110.50$130.00$100.00
8Lane closure(maintenance)(typ 2) (790-7021)HR250$85.00$85.00$100.00$130.00$150.00
9Lane closure(maintenance)(typ 5) (790-7024)HR1,200$85.00$75.00$112.00$130.00$100.00
10Lane closure(maintenance)(typ 6) (790-7025)HR100$95.00$75.00$90.00$135.00$50.00
11Lane closure(maintenance)(typ 7) (790-7026)HR50$95.00$78.00$110.00$180.00$50.00
12Lane closure(maintenance)(typ 8) (790-7027)HR10$95.00$77.00$80.00$185.00$50.00
13Lane closure(maintenance)(typ 11) (790-7030)HR20$95.00$100.00$80.00$140.00$50.00
14Lane closure(maintenance)(typ 12) (790-7031)HR10$50.00$50.00$80.00$115.00$50.00
15Lane closure(maintenance)(typ 13) (790-7032)HR10$75.00$70.00$80.00$210.00$50.00
16Lane closure(maintenance)(typ 14) (790-7033)HR10$75.00$75.00$80.00$120.00$50.00
17Lane closure(maintenance)(typ 15) (790-7034)HR10$95.00$80.00$80.00$140.00$50.00
18Lane closure(maintenance)(typ 18) (790-7037)HR10$80.00$80.00$80.00$120.00$50.00
19Additional lane closure item(type 20) (790-7058)HR2,000$75.00$55.00$35.00$45.00$75.00
20Additional lane closure item(type 21) (790-7059)HR3,000$75.00$65.00$48.00$65.00$75.00
21Additional lane closure item(type 22) (790-7060)HR60$35.00$23.00$5.00$25.00$100.00
22Flagger control method (HR) (7007-7001)HR200$30.00$35.00$28.00$45.00$40.00
23Flagger control method (day) (7007-7002)DAY200$350.00$285.00$250.00$320.00$200.00
24Maintenance speed limit signing (7010-7002)DAY10$150.00$23.00$75.00$150.00$100.00
TxDOT contract A00223921: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy