TxDOT contract A00203348 bid tabulation
Construct Rest Area, IH 30 (0.5 Mi W of CR 4204 to 0.5 Mi E of CR 4204). Let by Texas DOT on August 6, 2026, Bowie, Atlanta District. 4 bids received; low bid $10,625,436 by East Texas Bridge, Inc., -14% against the engineer's estimate of $12,397,796.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 102
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | East Texas Bridge, Inc. | $10,625,436 | Low | -14% |
| 2 | Longview Bridge and Road, LTD. | $10,965,651 | +3.0% | -12% |
| 3 | Drake Companies LLC | $11,520,690 | +8.0% | -7.0% |
| 4 | Highway 19 Construction LLC | $13,658,247 | +29% | +10% |
Engineer's estimate: $12,397,796.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. East Texas Bridge, Inc. | 2. Longview Bridge and Road, LTD. | 3. Drake Companies LLC | 4. Highway 19 Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 46.10 | $10,550 | $7,700.00 | $7,500.00 | $2,500.00 | $7,000.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 22,682 | $10.00 | $5.50 | $10.00 | $5.25 | $10.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 1,954 | $9.00 | $12.00 | $7.00 | $9.00 | $25.00 |
| 4 | Removing concrete (medians) (104-7008) | SY | 200 | $17.00 | $15.00 | $10.00 | $7.85 | $25.00 |
| 5 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 2,042 | $12.00 | $12.00 | $6.00 | $8.80 | $25.00 |
| 6 | Removing concrete (foundations) (104-7023) | SY | 572 | $60.00 | $15.00 | $32.00 | $11.00 | $25.00 |
| 7 | Removing concrete (miscellaneous) (104-7046) | SY | 870 | $36.00 | $15.00 | $20.00 | $7.50 | $25.00 |
| 8 | Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010) | SY | 11,549 | $10.00 | $11.00 | $7.00 | $9.70 | $5.00 |
| 9 | Excavation (roadway) (110-7001) | CY | 3,711 | $10.00 | $9.50 | $8.00 | $6.50 | $10.00 |
| 10 | Embankment (vehicle)(DC)(type C) (132-7018) | CY | 70,340 | $20.00 | $11.50 | $14.00 | $11.25 | $15.00 |
| 11 | Furn & place topsoil (4") (160-7002) | SY | 22,250 | $1.00 | $1.50 | $2.00 | $2.00 | $1.00 |
| 12 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 22,346 | $0.50 | $0.52 | $0.57 | $0.53 | $0.65 |
| 13 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 11,173 | $0.75 | $0.50 | $0.56 | $0.50 | $0.35 |
| 14 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 11,173 | $0.75 | $0.50 | $0.56 | $0.50 | $0.35 |
| 15 | FL BS (compacted in place)(type E GR 4) (4") (247-7039) | SY | 80,093 | $8.00 | $2.65 | $3.00 | $2.00 | $19.00 |
| 16 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 1,665 | $350.00 | $380.00 | $443.00 | $415.00 | $350.00 |
| 17 | Lime TRT (new base)(8") (260-7015) | SY | 30,873 | $3.00 | $3.00 | $2.00 | $4.00 | $3.50 |
| 18 | Lime TRT (new base)(10") (260-7016) | SY | 80,093 | $3.00 | $3.25 | $2.00 | $3.75 | $3.50 |
| 19 | Cement (275-7001) | TON | 1,665 | $225.00 | $240.00 | $250.00 | $235.00 | $250.00 |
| 20 | Cement TRT (new base)(8") (275-7011) | SY | 30,873 | $3.00 | $2.00 | $2.00 | $4.00 | $2.50 |
| 21 | Cement TRT (new base)(10") (275-7012) | SY | 80,093 | $3.00 | $2.25 | $2.00 | $3.75 | $2.50 |
| 22 | Prime coat (MC-30) (310-7004) | GAL | 27,743 | $5.00 | $5.50 | $6.40 | $5.25 | $6.00 |
| 23 | Fog seal (CSS-1H) (315-7004) | GAL | 22,426 | $3.50 | $4.25 | $2.00 | $3.00 | $5.25 |
| 24 | Asphalt (AC-20-5TR) (316-7007) | GAL | 15,440 | $4.00 | $5.00 | $5.60 | $4.70 | $5.00 |
| 25 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 256 | $72.00 | $215.00 | $285.00 | $190.00 | $180.00 |
| 26 | SP mixes SP-C PG76-22 (344-7029) | TON | 15,759 | $122.00 | $132.00 | $130.00 | $134.00 | $126.00 |
| 27 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 3,110 | $125.00 | $133.00 | $132.00 | $134.00 | $126.00 |
| 28 | Tack coat (344-7077) | GAL | 18,524 | $4.00 | $4.50 | $4.00 | $4.50 | $6.00 |
| 29 | Trench excavation protection (402-7001) | LF | 764 | $5.00 | $10.00 | $10.00 | $8.00 | $5.00 |
| 30 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 12 | $190.00 | $225.00 | $150.00 | $225.00 | $205.00 |
| 31 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 200 | $872.00 | $770.00 | $780.00 | $1,020.00 | $928.00 |
| 32 | Class C concrete (collar) (420-7061) | EACH | 1 | $1,425.00 | $1,500.00 | $1,300.00 | $1,500.00 | $2,500.00 |
| 33 | Riprap (concrete)(5 in) (432-7002) | CY | 207 | $650.00 | $585.00 | $472.00 | $600.00 | $750.00 |
| 34 | Riprap (concrete)(CL B) (432-7005) | CY | 26 | $475.00 | $700.00 | $505.00 | $630.00 | $700.00 |
| 35 | Riprap (mow strip)(4 in) (432-7013) | CY | 16 | $565.00 | $650.00 | $535.00 | $600.00 | $600.00 |
| 36 | Riprap (stone protection)(12 in) (432-7041) | CY | 20 | $219.00 | $185.00 | $300.00 | $295.00 | $180.00 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 168 | $75.00 | $55.00 | $60.00 | $60.00 | $55.00 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 672 | $89.00 | $75.00 | $72.00 | $75.00 | $70.00 |
| 39 | RC pipe (CL III)(30 in) (464-7007) | LF | 1,012 | $100.00 | $105.00 | $100.00 | $100.00 | $110.00 |
| 40 | RC pipe (CL III)(42 in) (464-7010) | LF | 548 | $205.00 | $190.00 | $175.00 | $175.00 | $250.00 |
| 41 | Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160) | EACH | 1 | $9,000.00 | $9,500.00 | $7,500.00 | $8,500.00 | $5,000.00 |
| 42 | Headwall (CH - FW - 0) (diameter= 30 in) (466-7007) | EACH | 1 | $5,530.00 | $9,000.00 | $11,000 | $10,500 | $9,000.00 |
| 43 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 6 | $1,270.00 | $875.00 | $950.00 | $1,100.00 | $700.00 |
| 44 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 4 | $2,145.00 | $1,200.00 | $1,315.00 | $1,570.00 | $750.00 |
| 45 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 7 | $3,189.00 | $2,900.00 | $2,500.00 | $2,875.00 | $1,250.00 |
| 46 | Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378) | EACH | 2 | $5,220.00 | $7,000.00 | $5,830.00 | $5,975.00 | $7,000.00 |
| 47 | Removing structure (inlet) (496-7002) | EACH | 8 | $1,018.00 | $500.00 | $675.00 | $550.00 | $1,000.00 |
| 48 | Removing structure (headwall) (496-7006) | EACH | 15 | $1,288.00 | $500.00 | $715.00 | $785.00 | $500.00 |
| 49 | Removing structure (pipe) (496-7007) | LF | 905 | $18.00 | $10.00 | $12.00 | $12.50 | $50.00 |
| 50 | Mobilization (500-7001) | LS | 1 | $1,128,000 | $500,000 | $800,000 | $900,000 | $1,000,000 |
| 51 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $5,000.00 | $2,500.00 | $2,300.00 | $5,500.00 | $5,000.00 |
| 52 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $10,000 | $6,600.00 | $19,000 | $15,000 |
| 53 | TMA (stationary) (505-7001) | DAY | 177 | $140.00 | $200.00 | $250.00 | $150.00 | $250.00 |
| 54 | TMA (mobile operation) (505-7003) | DAY | 26 | $330.00 | $200.00 | $350.00 | $275.00 | $1,000.00 |
| 55 | Rock filter dams (install) (type 2) (506-7002) | LF | 315 | $49.00 | $38.50 | $42.00 | $38.00 | $45.00 |
| 56 | Rock filter dams (remove) (506-7011) | LF | 315 | $12.00 | $9.00 | $10.00 | $10.00 | $10.00 |
| 57 | Construction exits (install) (type 1) (506-7020) | SY | 278 | $30.00 | $38.50 | $44.00 | $38.00 | $35.00 |
| 58 | Construction exits (remove) (506-7024) | SY | 278 | $8.00 | $6.00 | $10.00 | $7.00 | $10.00 |
| 59 | Temporary sediment control fence (install) (506-7039) | LF | 9,203 | $4.00 | $4.00 | $4.00 | $3.90 | $4.00 |
| 60 | Temporary sediment control fence (remove) (506-7041) | LF | 9,203 | $1.00 | $0.40 | $0.66 | $0.50 | $1.00 |
| 61 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 300 | $9.00 | $7.00 | $5.50 | $7.00 | $5.00 |
| 62 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $1.25 | $0.25 | $1.10 | $0.50 | $1.00 |
| 63 | PTB (fur&inst)(single slope)(type 1) or (steel) (512-7081) | LF | 15,630 | $42.00 | $65.00 | $63.00 | $74.00 | $90.00 |
| 64 | PTB (move)(single slope)(type 1) or (steel) (512-7082) | LF | 7,605 | $15.00 | $6.00 | $2.50 | $5.00 | $25.00 |
| 65 | PTB (remove)(single slope)(type 1) or (steel) (512-7084) | LF | 15,630 | $20.00 | $9.00 | $10.00 | $7.00 | $35.00 |
| 66 | Metal W-beam guard fence (timber post) (540-7001) | LF | 275 | $27.00 | $27.00 | $34.00 | $29.00 | $35.00 |
| 67 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,170.00 | $1,400.00 | $1,650.00 | $1,550.00 | $2,750.00 |
| 68 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,280.00 | $3,500.00 | $3,740.00 | $3,650.00 | $3,500.00 |
| 69 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $1,130.00 | $1,625.00 | $1,120.00 | $2,200.00 | $1,500.00 |
| 70 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $510.00 | $850.00 | $690.00 | $900.00 | $2,500.00 |
| 71 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $9,500.00 | $10,000 | $7,590.00 | $9,800.00 | $7,500.00 |
| 72 | Pipe underdrains (type 9) (6") (556-7009) | LF | 400 | $35.00 | $40.00 | $50.00 | $40.00 | $50.00 |
| 73 | HI MST IL pole (150 FT)( 80 MPH) (613-7005) | EACH | 8 | $54,250 | $50,800 | $50,845 | $60,525 | $55,025 |
| 74 | LED HI MST IL asm (6 fixt) (type A) (614-7002) | EACH | 8 | $50,000 | $31,400 | $31,500 | $45,000 | $40,750 |
| 75 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,769 | $13.00 | $15.25 | $15.40 | $8.25 | $7.50 |
| 76 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 2,246 | $27.00 | $29.00 | $30.00 | $20.35 | $18.50 |
| 77 | Electrical conductor (no.6) bare (620-7009) | LF | 6,190 | $3.00 | $3.60 | $3.60 | $2.75 | $2.50 |
| 78 | Electrical conductor (no.6) insulated (620-7010) | LF | 12,410 | $3.00 | $3.60 | $3.60 | $3.00 | $2.75 |
| 79 | Ground box type A (122311) (624-7001) | EACH | 8 | $986.00 | $1,350.00 | $1,345.00 | $1,100.00 | $1,000.00 |
| 80 | Ground box type A (122311)W/apron (624-7002) | EACH | 19 | $1,250.00 | $2,175.00 | $2,170.00 | $1,295.00 | $1,175.00 |
| 81 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 3 | $9,770.00 | $13,000 | $12,900 | $8,425.00 | $7,658.00 |
| 82 | Aluminum signs (type G) (636-7009) | EACH | 7 | $1,000.00 | $1,850.00 | $1,860.00 | $2,500.00 | $150.00 |
| 83 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $656.00 | $880.00 | $732.00 | $895.00 | $850.00 |
| 84 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 8 | $787.00 | $1,050.00 | $915.00 | $1,055.00 | $1,100.00 |
| 85 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 4 | $957.00 | $1,150.00 | $1,195.00 | $1,200.00 | $850.00 |
| 86 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 3 | $1,264.00 | $1,400.00 | $1,540.00 | $1,420.00 | $800.00 |
| 87 | Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048) | EACH | 7 | $2,248.00 | $3,050.00 | $3,155.00 | $3,060.00 | $1,000.00 |
| 88 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 2 | $368.00 | $500.00 | $660.00 | $515.00 | $700.00 |
| 89 | Remove SM RD SN sup&AM (644-7073) | EACH | 25 | $130.00 | $110.00 | $87.00 | $110.00 | $100.00 |
| 90 | Relocate lrsa (647-7002) | EACH | 1 | $1,068.00 | $7,000.00 | $6,600.00 | $5,000.00 | $6,350.00 |
| 91 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 8 | $43.00 | $45.00 | $27.50 | $49.00 | $35.00 |
| 92 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 37 | $114.00 | $140.00 | $66.00 | $140.00 | $45.00 |
| 93 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 15,420 | $1.50 | $1.10 | $1.25 | $1.10 | $1.00 |
| 94 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 2,070 | $1.50 | $1.30 | $1.00 | $1.32 | $1.20 |
| 95 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,495 | $1.00 | $1.30 | $1.00 | $1.32 | $1.20 |
| 96 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 2,120 | $2.50 | $4.95 | $3.30 | $4.95 | $4.50 |
| 97 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 10,570 | $1.00 | $1.65 | $0.83 | $1.65 | $1.50 |
| 98 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 3,310 | $1.00 | $1.65 | $0.83 | $1.65 | $1.50 |
| 99 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 1,825 | $1.00 | $1.65 | $0.83 | $1.65 | $1.50 |
| 100 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 286 | $4.25 | $6.50 | $4.40 | $6.60 | $6.00 |
| 101 | Eliminating existing PM & markers (6") (677-7002) | LF | 13,220 | $1.00 | $0.57 | $0.75 | $0.57 | $0.52 |
| 102 | Permeable concrete edge drain (4021-7001) | LF | 9,183 | $67.00 | $60.00 | $55.00 | $85.00 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.