TxDOT contract A00196275 bid tabulation

Resurface Roadway, SH 43 (US 59 to SL 390). Let by Texas DOT on August 6, 2026, Harrison, Atlanta District. 5 bids received; low bid $3,320,428 by Madden Contracting Company, LLC., +0.4% against the engineer's estimate of $3,307,700.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
84
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Madden Contracting Company, LLC.$3,320,428Low0.0%
2Longview Bridge and Road, LTD.$3,390,831+2.0%+3.0%
3Highway 19 Construction LLC$3,442,165+4.0%+4.0%
4East Texas Bridge, Inc.$4,052,654+22%+23%
5Drewery Construction Company, Incorporated$4,232,999+27%+28%
TxDOT contract A00196275: bids by rank

Engineer's estimate: $3,307,700.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Madden Contracting Company, LLC.2. Longview Bridge and Road, LTD.3. Highway 19 Construction LLC4. East Texas Bridge, Inc.5. Drewery Construction Company, Incorporated
1Preparing row (100-7002)STA46.40$1,000.00$1,725.00$550.00$4,000.00$5,500.00$1,050.00
2Removing concrete (riprap) (104-7006)SY3$100.00$50.00$295.00$50.00$50.00$100.00
3Removing concrete (driveways) (104-7011)SY37$35.00$26.00$57.00$25.00$30.00$25.00
4Embankment (vehicle)(OC)(type C) (132-7017)CY252$35.00$41.00$27.00$30.00$35.00$50.00
5Backfill (type C) (134-7003)STA102.40$265.00$263.00$101.00$350.00$350.00$400.00
6Blading (150-7001)STA109.69$135.00$186.00$73.00$300.00$250.00$175.00
7Bonded fiber MTRX seed (temporary)(warm) (164-7074)SY4,253$0.60$0.45$0.57$1.00$0.50$0.75
8Bonded fiber MTRX seed (temporary)(cool) (164-7075)SY4,253$0.60$0.45$0.56$1.00$0.50$0.75
9Bond fiber MTRX seed (permanent)(rural)(clay) (164-7083)SY16,996$0.60$0.45$0.56$0.65$0.50$0.60
10Vegetative watering (168-7001)TGL409$5.00$31.00$20.00$10.00$13.00$10.00
11SP mixes SP-C sac-A PG76-22 (344-7030)TON10,606$155.00$170.00$175.00$144.00$172.00$187.25
12Tack coat (344-7077)GAL3,575$5.00$0.01$4.00$5.50$5.00$0.01
13Flexible pavement structure repair(4") (351-7003)SY3,793$40.00$50.00$45.50$40.00$45.00$55.00
14Planing asphalt concrete pavement(2") (354-7051)SY70,484$2.25$1.85$1.00$3.00$2.65$3.00
15Planing asphalt concrete pavement (1" to 2") (354-7076)SY25,922$2.72$1.85$1.00$2.50$2.50$3.00
16Cut & restore asphalt paving (400-7008)SY6$300.00$195.00$575.00$350.00$100.00$350.00
17Riprap (concrete)(4 in) (432-7001)CY1$1,000.00$1,000.00$1,000.00$1,000.00$2,000.00$1,500.00
18Riprap (mow strip)(4 in) (432-7013)CY28$750.00$845.00$762.00$600.00$640.00$750.00
19Concrete box culvert (5 FT X 4 FT)(extend) (462-7063)LF13$1,000.00$1,027.00$1,530.00$750.00$1,000.00$1,100.00
20RC pipe (CL III)(18 in) (464-7003)LF154$80.00$68.00$78.50$65.00$56.00$350.00
21RC pipe (CL III)(24 in) (464-7005)LF62$80.00$122.00$108.00$90.00$77.00$350.00
22Wingwall (PW - 2) (HW=6 FT) (466-7190)EACH2$19,250$15,889$9,915.00$18,000$10,500$3,500.00
23Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292)EACH2$800.00$780.00$740.00$700.00$675.00$1,000.00
24Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH89$850.00$910.00$1,015.00$850.00$865.00$1,500.00
25Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH42$1,497.00$1,250.00$1,440.00$1,200.00$1,300.00$2,000.00
26Removing structure (headwall) (496-7006)EACH10$1,000.00$1,000.00$1,200.00$500.00$500.00$750.00
27Removing structure (pipe) (496-7007)LF308$15.00$8.00$45.00$50.00$15.00$100.00
28Removing rock riprap (496-7055)CY5$140.00$45.00$300.00$100.00$50.00$200.00
29Mobilization (500-7001)LS1$301,000$180,000$100,000$300,000$300,000$400,203
30Barricades, signs and traffic handling (502-7001)MO5$6,000.00$5,000.00$2,310.00$5,000.00$6,500.00$7,500.00
31Portable changeable message sign (503-7002)EACH2$12,000$5,000.00$6,600.00$1,000.00$15,000$1,500.00
32TMA (stationary) (505-7001)DAY130$200.00$300.00$200.00$250.00$200.00$650.00
33TMA (mobile operation) (505-7003)DAY20$150.00$0.01$330.00$1,000.00$200.00$300.00
34Temporary sediment control fence (install) (506-7039)LF300$4.00$4.00$9.00$5.00$4.50$6.50
35Temporary sediment control fence (remove) (506-7041)LF300$1.00$0.50$4.40$1.00$0.50$1.50
36Driveways (concrete) (type 1) (530-7008)SY37$150.00$182.00$400.00$120.00$115.00$325.00
37Driveways (ACP) (530-7010)SY35$150.00$100.00$945.00$75.00$50.00$75.00
38Metal W-beam guard fence (timber post) (540-7001)LF100$33.50$23.50$26.00$35.00$25.50$25.00
39Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$1,900.00$2,125.00$2,500.00$3,500.00$2,500.00$2,260.00
40Metal beam guard fence (long span system) (540-7027)EACH2$1,122.00$1,225.00$1,350.00$2,900.00$1,325.00$1,300.00
41Remove metal beam guard fence (542-7001)LF150$2.50$2.00$2.20$3.00$2.20$2.10
42Remove terminal anchor section (542-7002)EACH4$180.00$150.00$165.00$250.00$165.00$200.00
43Guardrail end treatment (install) (544-7001)EACH6$2,800.00$3,200.00$3,520.00$3,500.00$3,500.00$3,500.00
44Mailbox install-M (TWG-post) type 1 (560-7001)EACH5$678.64$654.00$720.00$650.00$720.00$700.00
45Mailbox install-S (TWG-post) type 2 (560-7002)EACH75$265.00$336.00$370.00$350.00$370.00$360.00
46Mailbox install-D (TWG-post) type 2 (560-7003)EACH5$340.00$371.00$410.00$371.00$410.00$400.00
47Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$950.00$1,017.00$1,120.00$1,110.00$1,100.00$1,080.00
48Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH4$1,100.00$1,239.00$1,365.00$1,250.00$1,365.00$1,325.00
49Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH18$480.00$511.00$565.00$500.00$565.00$550.00
50Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058)EACH1$460.00$545.00$600.00$545.00$600.00$580.00
51Remove SM RD SN sup&AM (644-7073)EACH11$100.00$101.00$110.00$100.00$110.00$110.00
52Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH12$27.00$45.00$50.00$45.00$50.00$13.00
53Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH2$100.00$137.00$150.00$132.00$150.00$150.00
54Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,140$0.25$0.25$0.28$0.25$0.27$0.30
55Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF380$2.25$1.00$1.10$1.00$1.10$1.10
56Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF27,861$0.30$0.22$0.25$0.22$0.24$0.25
57Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF30$2.30$1.00$1.10$1.00$1.10$1.10
58Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF339$1.15$1.00$1.10$1.00$1.10$1.10
59Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH6$185.00$75.00$82.50$75.00$85.00$80.00
60Work zone pavement marking non-removing(W)(word) (662-7030)EACH2$185.00$100.00$110.00$100.00$110.00$110.00
61Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF640$0.57$0.25$0.28$0.25$0.27$0.30
62Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF28,617$0.26$0.22$0.25$0.22$0.24$0.25
63Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH227$4.50$5.00$5.50$5.00$5.50$5.50
64Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH497$4.75$5.00$5.50$5.00$5.50$5.50
65Work zone pavement marking removing (W)6"(broken) (662-7065)LF4,140$2.50$0.01$2.65$0.75$1.50$2.00
66Work zone pavement marking removing (W)6"(DOT) (662-7066)LF380$2.60$1.85$2.65$2.00$2.00$3.00
67Work zone pavement marking removing (W)8"(DOT) (662-7070)LF30$3.50$1.85$2.65$1.50$3.00$3.00
68Work zone pavement marking removing (W)8"(solid) (662-7072)LF339$2.50$2.50$2.65$1.50$2.50$3.00
69Work zone pavement marking removing (Y)6"(broken) (662-7098)LF640$3.10$1.85$2.65$1.00$2.00$3.00
70Work zone pavement marking removing (Y)6"(solid) (662-7100)LF28,617$0.90$0.01$2.65$0.70$1.50$1.75
71All-wther PM type I (W)6"(solid)(100MIL) (666-7309)LF27,861$0.77$0.70$0.77$0.70$0.77$0.75
72All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF4,140$0.95$0.75$0.83$0.75$0.82$0.70
73All-wther PM type I (W)6"(DOT)(100MIL) (666-7311)LF380$1.00$2.00$2.20$2.00$2.20$2.15
74All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF28,617$0.79$0.70$0.77$0.70$0.75$0.75
75All-wther PM type I (Y)6"(broken)(100MIL) (666-7316)LF640$1.20$1.00$1.10$1.00$1.10$1.10
76All-wther PM type I (W) 8"(solid)(100MIL) (666-7425)LF339$1.60$1.50$1.65$1.50$1.65$2.00
77All-wther PM type I (W) 8"(DOT)(100MIL) (666-7426)LF30$2.25$1.50$1.65$1.50$1.65$4.00
78Prefabricated PM type C (W)(arrow) (668-7091)EACH6$250.00$215.00$240.00$215.00$235.00$230.00
79Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH4$305.00$275.00$300.00$275.00$300.00$300.00
80Prefabricated PM type C (W)(word) (668-7103)EACH2$295.00$245.00$270.00$250.00$270.00$260.00
81Reflectorized pavement marker type I-C (672-7002)EACH228$5.70$5.00$5.50$5.00$5.50$6.00
82Reflectorized pavement marker type II-A-A (672-7004)EACH497$4.60$5.00$5.50$5.00$5.50$6.00
83Composite geogrid for asphalt overlay (3019-7001)SY65,423$4.00$4.40$6.05$5.06$8.50$6.95
84Tack coat (3019-7002)GAL9,326$5.75$4.85$5.60$5.15$6.50$0.01
TxDOT contract A00196275: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy