Madden Contracting Company, LLC.: TxDOT bid record
Madden Contracting Company, LLC. submitted 47 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 06 OCT 2026, and was the low bidder on 33 of them (70%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $225,956,992
- Latest bid
- 06 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 3 | 75% |
| 2021 | 9 | 7 | 78% |
| 2022 | 6 | 6 | 100% |
| 2023 | 5 | 5 | 100% |
| 2024 | 7 | 4 | 57% |
| 2025 | 8 | 4 | 50% |
| 2026 | 8 | 4 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 28 | 16 | 57% |
| Atlanta District | 17 | 15 | 88% |
| Lufkin District | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 41 | 35 (85%) | $4.00 | $5.00 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 35 | 29 (83%) | $4.20 | $5.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 46 | 28 (61%) | $4,500.00 | $5,000.00 |
| Reflectorized pavement marking type I (W)8"(solid)(100MIL) | 666-7024 | LF | 31 | 24 (77%) | $1.00 | $1.10 |
| Guardrail end treatment (install) | 544-7001 | EACH | 29 | 23 (79%) | $2,800.00 | $3,245.00 |
| Prefabricated pavement marking type C (W) (arrow) | 668-6077 | EACH | 23 | 22 (96%) | $205.00 | $236.50 |
| Bond fiber MTRX seed (permanent)(rural)(sand) | 164-6054 | SY | 27 | 21 (78%) | $0.60 | $0.78 |
| Remove metal beam guard fence | 542-7001 | LF | 26 | 21 (81%) | $2.25 | $3.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 29 | 20 (69%) | $0.60 | $1.00 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 23 | 20 (87%) | $200.00 | $275.00 |
| Prefabricated pavement marking type C (W) (word) | 668-6085 | EACH | 22 | 20 (91%) | $255.00 | $290.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 29 | 19 (66%) | $3.00 | $4.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 41 | 5 of 41 |
| Longview Bridge and Road, LTD. | 37 | 5 of 37 |
| Drewery Construction Company, Incorporated | 20 | 3 of 20 |
| Reynolds & Kay, LTD. | 14 | 1 of 14 |
| A. L. Helmcamp, Inc. | 10 | 2 of 10 |
| Big Creek Construction, LTD. | 7 | 2 of 7 |
| L. S. Equipment Co., Inc. | 5 | 0 of 5 |
| Grey Sky Construction LLC | 5 | 1 of 5 |
| Texas Materials Group, Inc. | 4 | 1 of 4 |
| Altus Construction LLC | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 OCT 2026 | A00221514 | Atlanta District | MILL AND INLAY, IH0020 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 3 of 4 | $6,539,285 | +7.0% |
| 06 AUG 2026 | A00196275 | Atlanta District | Resurface Roadway, SH 43 (US 59 to SL 390) | 1 of 5 | $3,320,428 | Low, 2.0% under the second |
| 01 JUL 2026 | A00206280 | Atlanta District | Widen Road - Add Shoulders, FM 123 (US 79 to FM 31S) | 1 of 4 | $2,441,151 | Low, 0.0% under the second |
| 03 JUN 2026 | A00220774 | Tyler District | MILL AND INLAY, US0079 (VARIOUS LOCATIONS IN GREGG, RUSK, to VAN ZANDT AND WOOD COUNTIES) | 2 of 4 | $4,266,307 | +1.0% |
| 07 MAY 2026 | A00133189 | Lufkin District | Resurface Roadway, US 259 (SH 204 to FM 698) | 1 of 6 | $2,886,840 | Low, 4.0% under the second |
| 07 APR 2026 | A00060559 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231)) | 4 of 8 | $9,683,458 | +11% |
| 05 FEB 2026 | A00058517 | Tyler District | Highway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L) | 4 of 8 | $11,248,405 | +9.0% |
| 04 FEB 2026 | A00213638 | Tyler District | Rehabilitate Existing Roadway, SS 63 (US 80 to SL 281) | 1 of 4 | $3,172,923 | Low, 3.0% under the second |
| 03 DEC 2025 | A00196221 | Tyler District | Resurface Roadway, SL 281 (0.39 MI N of US 80 (Shofner Dr.) to US 259) | 3 of 4 | $13,365,234 | +7.0% |
| 06 NOV 2025 | A00060555 | Tyler District | Surfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011) | 1 of 5 | $3,494,062 | Low, 0.0% under the second |
| 05 SEP 2025 | A00217142 | Tyler District | MILL AND INLAY, SH0037 (Various Roadways in Wood, to Gregg, and Rusk Counties) | 2 of 5 | $2,392,472 | +25% |
| 02 JUL 2025 | A00208034 | Atlanta District | Resurface Roadway, IH 20 (FM 450 to 0.5 Mi W of SH 43) | 1 of 3 | $2,798,907 | Low, 21% under the second |
| 04 APR 2025 | A00211407 | Tyler District | Resurface Roadway, US 80 (Lake Devernia Road to FM 3272) | 2 of 4 | $3,488,041 | +2.0% |
| 07 FEB 2025 | A00064408 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD) | 1 of 7 | $4,258,941 | Low, 0.0% under the second |
| 07 FEB 2025 | A00209767 | Tyler District | Resurface Roadway, IH 20 (UPRR (CONC PVT) to HARRISON CL) | 3 of 3 | $4,047,576 | +35% |
| 06 FEB 2025 | A00184154 | Atlanta District | Resurface Roadway, US 79 (US 59 to Sabine River) | 1 of 4 | $8,013,112 | Low, 14% under the second |
| 06 JUN 2024 | 06243229 | Atlanta District | US 80 Resurface roadway from FM 134 to LOUISIANA S/L | 1 of 3 | $3,801,386 | Low, 14% under the second |
| 02 MAY 2024 | 05243012 | Atlanta District | SH 155 Rehabilitate existing roadway from 0.4 MILES N OF FM 2911 to 0.1 MILES S OF FM 1404 | 2 of 3 | $15,744,820 | +5.0% |
| 05 APR 2024 | 04243206 | Atlanta District | US 271 Surfacing/roadway restoration from 0.06 MI N OF FM 726 to GREGG C/L | 1 of 3 | $5,280,511 | Low, 20% under the second |
| 04 APR 2024 | 04243003 | Atlanta District | SH 300 Rehabilitate existing roadway from 0.3 MI S OF US 271 to 0.1 MI N OF S FM 3358 | 1 of 3 | $22,871,598 | Low, 43% under the second |
| 01 FEB 2024 | 02243016 | Tyler District | US 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from 1.3 MI E OF SH 45, S to CHEROKEE C/L | 2 of 5 | $5,014,425 | +2.0% |
| 05 JAN 2024 | 01243219 | Tyler District | US 259 Rehabilitate existing roadway from HOLLYBROOK DR to US 80 | 3 of 4 | $3,930,818 | +10% |
| 04 JAN 2024 | 01243027 | Tyler District | US 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from FM 839, S to 1.3 MI E OF SH 42 | 1 of 6 | $3,202,957 | Low, 3.0% under the second |
| 01 NOV 2023 | 11233006 | Tyler District | SH 204 Highway improvement from SH 110, SE to RUSK C/L IN REKLAW | 1 of 5 | $16,863,171 | Low, 23% under the second |
| 02 AUG 2023 | 08233011 | Atlanta District | US 80 Resurface roadway from GREGG C/L to 0.10 MI. W. OF TOM BROWN PARKWAY | 1 of 2 | $6,333,887 | Low, 31% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.