Madden Contracting Company, LLC.: TxDOT bid record

Madden Contracting Company, LLC. submitted 47 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 06 OCT 2026, and was the low bidder on 33 of them (70%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Texas DOT
Low bid volume
$225,956,992
Latest bid
06 OCT 2026
Data through
19 NOV 2026
47Bids
33Low bids
70Win rate, percent
+7.0%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20204375%
20219778%
202266100%
202355100%
20247457%
20258450%
20268450%
Madden Contracting Company, LLC., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Tyler District281657%
Atlanta District171588%
Lufkin District22100%
Madden Contracting Company, LLC., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type II-A-A672-7004EACH4135 (85%)$4.00$5.00
Reflectorized pavement marker type I-C672-7002EACH3529 (83%)$4.20$5.00
Barricades, signs and traffic handling502-7001MO4628 (61%)$4,500.00$5,000.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF3124 (77%)$1.00$1.10
Guardrail end treatment (install)544-7001EACH2923 (79%)$2,800.00$3,245.00
Prefabricated pavement marking type C (W) (arrow)668-6077EACH2322 (96%)$205.00$236.50
Bond fiber MTRX seed (permanent)(rural)(sand)164-6054SY2721 (78%)$0.60$0.78
Remove metal beam guard fence542-7001LF2621 (81%)$2.25$3.00
Temporary sediment control fence (remove)506-7041LF2920 (69%)$0.60$1.00
Guardrail end treatment (remove)544-7003EACH2320 (87%)$200.00$275.00
Prefabricated pavement marking type C (W) (word)668-6085EACH2220 (91%)$255.00$290.00
Temporary sediment control fence (install)506-7039LF2919 (66%)$3.00$4.00
Madden Contracting Company, LLC., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Madden Contracting Company, LLC., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 OCT 2026A00221514Atlanta DistrictMILL AND INLAY, IH0020 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)3 of 4$6,539,285+7.0%
06 AUG 2026A00196275Atlanta DistrictResurface Roadway, SH 43 (US 59 to SL 390)1 of 5$3,320,428Low, 2.0% under the second
01 JUL 2026A00206280Atlanta DistrictWiden Road - Add Shoulders, FM 123 (US 79 to FM 31S)1 of 4$2,441,151Low, 0.0% under the second
03 JUN 2026A00220774Tyler DistrictMILL AND INLAY, US0079 (VARIOUS LOCATIONS IN GREGG, RUSK, to VAN ZANDT AND WOOD COUNTIES)2 of 4$4,266,307+1.0%
07 MAY 2026A00133189Lufkin DistrictResurface Roadway, US 259 (SH 204 to FM 698)1 of 6$2,886,840Low, 4.0% under the second
07 APR 2026A00060559Tyler DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231))4 of 8$9,683,458+11%
05 FEB 2026A00058517Tyler DistrictHighway Improvement, SH 204 (RUSK C/L AT REKLAW, SE to CHEROKEE C/L)4 of 8$11,248,405+9.0%
04 FEB 2026A00213638Tyler DistrictRehabilitate Existing Roadway, SS 63 (US 80 to SL 281)1 of 4$3,172,923Low, 3.0% under the second
03 DEC 2025A00196221Tyler DistrictResurface Roadway, SL 281 (0.39 MI N of US 80 (Shofner Dr.) to US 259)3 of 4$13,365,234+7.0%
06 NOV 2025A00060555Tyler DistrictSurfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011)1 of 5$3,494,062Low, 0.0% under the second
05 SEP 2025A00217142Tyler DistrictMILL AND INLAY, SH0037 (Various Roadways in Wood, to Gregg, and Rusk Counties)2 of 5$2,392,472+25%
02 JUL 2025A00208034Atlanta DistrictResurface Roadway, IH 20 (FM 450 to 0.5 Mi W of SH 43)1 of 3$2,798,907Low, 21% under the second
04 APR 2025A00211407Tyler DistrictResurface Roadway, US 80 (Lake Devernia Road to FM 3272)2 of 4$3,488,041+2.0%
07 FEB 2025A00064408Tyler DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD)1 of 7$4,258,941Low, 0.0% under the second
07 FEB 2025A00209767Tyler DistrictResurface Roadway, IH 20 (UPRR (CONC PVT) to HARRISON CL)3 of 3$4,047,576+35%
06 FEB 2025A00184154Atlanta DistrictResurface Roadway, US 79 (US 59 to Sabine River)1 of 4$8,013,112Low, 14% under the second
06 JUN 202406243229Atlanta DistrictUS 80 Resurface roadway from FM 134 to LOUISIANA S/L1 of 3$3,801,386Low, 14% under the second
02 MAY 202405243012Atlanta DistrictSH 155 Rehabilitate existing roadway from 0.4 MILES N OF FM 2911 to 0.1 MILES S OF FM 14042 of 3$15,744,820+5.0%
05 APR 202404243206Atlanta DistrictUS 271 Surfacing/roadway restoration from 0.06 MI N OF FM 726 to GREGG C/L1 of 3$5,280,511Low, 20% under the second
04 APR 202404243003Atlanta DistrictSH 300 Rehabilitate existing roadway from 0.3 MI S OF US 271 to 0.1 MI N OF S FM 33581 of 3$22,871,598Low, 43% under the second
01 FEB 202402243016Tyler DistrictUS 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from 1.3 MI E OF SH 45, S to CHEROKEE C/L2 of 5$5,014,425+2.0%
05 JAN 202401243219Tyler DistrictUS 259 Rehabilitate existing roadway from HOLLYBROOK DR to US 803 of 4$3,930,818+10%
04 JAN 202401243027Tyler DistrictUS 79 Pvmnt repair, planing, ocst, pfc surf, mbgf, pv m from FM 839, S to 1.3 MI E OF SH 421 of 6$3,202,957Low, 3.0% under the second
01 NOV 202311233006Tyler DistrictSH 204 Highway improvement from SH 110, SE to RUSK C/L IN REKLAW1 of 5$16,863,171Low, 23% under the second
02 AUG 202308233011Atlanta DistrictUS 80 Resurface roadway from GREGG C/L to 0.10 MI. W. OF TOM BROWN PARKWAY1 of 2$6,333,887Low, 31% under the second
Madden Contracting Company, LLC.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy