TxDOT contract A00213638 bid tabulation
Rehabilitate Existing Roadway, SS 63 (US 80 to SL 281). Let by Texas DOT on February 4, 2026, Gregg, Tyler District. 4 bids received; low bid $3,172,923 by Madden Contracting Company, LLC., -9.7% against the engineer's estimate of $3,513,305.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 59
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Madden Contracting Company, LLC. | $3,172,923 | Low | -10% |
| 2 | East Texas Bridge, Inc. | $3,282,823 | +3.0% | -7.0% |
| 3 | Longview Bridge and Road, LTD. | $3,636,112 | +15% | +3.0% |
| 4 | Drewery Construction Company, Incorporated | $4,251,973 | +34% | +21% |
Engineer's estimate: $3,513,305.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Madden Contracting Company, LLC. | 2. East Texas Bridge, Inc. | 3. Longview Bridge and Road, LTD. | 4. Drewery Construction Company, Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 8 | $50.00 | $75.00 | $65.00 | $100.00 | $1,000.00 |
| 2 | Furn & place topsoil (4") (160-7002) | SY | 70 | $7.00 | $28.57 | $10.00 | $10.00 | $50.00 |
| 3 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 70 | $2.00 | $1.50 | $1.75 | $10.00 | $5.00 |
| 4 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 70 | $3.00 | $1.50 | $1.75 | $11.00 | $5.00 |
| 5 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 70 | $2.00 | $1.50 | $1.75 | $11.00 | $5.00 |
| 6 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 70 | $2.00 | $1.00 | $1.50 | $11.00 | $5.00 |
| 7 | Vegetative watering (168-7001) | TGL | 1 | $13.77 | $1,000.00 | $500.00 | $250.00 | $1,000.00 |
| 8 | SP mixes SP-C sac-A PG 82-22 (344-7081) | TON | 12,029 | $160.00 | $180.50 | $179.00 | $195.00 | $210.00 |
| 9 | Flexible pavement structure repair(8") (351-7007) | SY | 1,000 | $85.00 | $150.00 | $79.70 | $90.00 | $100.00 |
| 10 | Planing asphalt concrete pavement(2") (354-7051) | SY | 109,357 | $4.00 | $1.75 | $2.45 | $2.40 | $4.00 |
| 11 | Planing asphalt concrete pavement (1.25") (354-7097) | SY | 70,827 | $4.50 | $2.50 | $1.75 | $2.00 | $4.00 |
| 12 | Flowable backfill (401-7001) | CY | 5 | $400.00 | $1,000.00 | $500.00 | $385.00 | $2,500.00 |
| 13 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 10 | $250.00 | $500.00 | $300.00 | $420.00 | $1,500.00 |
| 14 | Adjusting manholes & inlets (479-7003) | EACH | 3 | $1,000.00 | $4,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $319,391 | $102,000 | $200,000 | $350,000 | $375,000 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $5,000.00 | $5,000.00 | $10,000 | $6,000.00 | $25,000 |
| 17 | Portable changeable message sign (503-7001) | DAY | 200 | $101.36 | $50.00 | $100.00 | $150.00 | $200.00 |
| 18 | TMA (stationary) (505-7001) | DAY | 86 | $250.00 | $300.00 | $200.00 | $250.00 | $400.00 |
| 19 | TMA (mobile operation) (505-7003) | DAY | 14 | $350.00 | $0.01 | $200.00 | $350.00 | $400.00 |
| 20 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 20 | $700.00 | $679.00 | $750.00 | $750.00 | $800.00 |
| 21 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 10 | $900.00 | $1,201.00 | $1,325.00 | $1,600.00 | $950.00 |
| 22 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $100.00 | $110.00 | $125.00 | $125.00 | $500.00 |
| 23 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 7,680 | $0.25 | $1.00 | $1.10 | $0.22 | $1.25 |
| 24 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 2,150 | $1.68 | $1.00 | $1.10 | $0.45 | $1.25 |
| 25 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 7,190 | $0.45 | $0.60 | $0.65 | $0.22 | $0.65 |
| 26 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 37,606 | $0.50 | $0.60 | $0.65 | $0.22 | $0.65 |
| 27 | Work zone pavement marking SHT terminal remove (W)(6") (662-7122) | LF | 18,648 | $1.40 | $0.01 | $1.65 | $2.00 | $2.00 |
| 28 | Work zone pavement marking SHT terminal remove (Y)(6") (662-7123) | LF | 18,538 | $1.00 | $1.85 | $1.65 | $2.00 | $2.00 |
| 29 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,150 | $1.50 | $1.20 | $1.35 | $1.10 | $1.25 |
| 30 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,199 | $6.00 | $5.75 | $6.25 | $1.10 | $6.00 |
| 31 | Pavement sler 6" (666-7347) | LF | 250 | $1.00 | $1.00 | $1.10 | $1.10 | $1.25 |
| 32 | Pavement sler 8" (666-7348) | LF | 63 | $1.00 | $1.00 | $1.10 | $2.20 | $1.25 |
| 33 | Pavement sler 24" (666-7352) | LF | 93 | $5.00 | $3.00 | $3.25 | $4.50 | $3.25 |
| 34 | Pavement sler (arrow) (666-7353) | EACH | 2 | $250.00 | $100.00 | $110.00 | $235.00 | $150.00 |
| 35 | Pavement sler (word) (666-7354) | EACH | 2 | $250.00 | $100.00 | $110.00 | $235.00 | $150.00 |
| 36 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 7,680 | $0.87 | $0.80 | $0.85 | $1.10 | $0.85 |
| 37 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 30,740 | $0.75 | $0.70 | $0.77 | $0.85 | $0.75 |
| 38 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 7,190 | $0.75 | $0.80 | $0.85 | $1.10 | $0.85 |
| 39 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 37,606 | $0.75 | $0.70 | $0.77 | $0.85 | $0.75 |
| 40 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 28 | $250.00 | $210.00 | $230.00 | $235.00 | $225.00 |
| 41 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $300.00 | $300.00 | $325.00 | $275.00 | $325.00 |
| 42 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 22 | $270.00 | $248.50 | $270.00 | $275.00 | $275.00 |
| 43 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 29 | $80.00 | $42.50 | $50.00 | $305.00 | $45.00 |
| 44 | Prefabricated PM type C (Y)(6")(solid) (668-7123) | LF | 200 | $6.77 | $5.00 | $5.50 | $1.10 | $5.50 |
| 45 | Reflectorized pavement marker type I-C (672-7002) | EACH | 495 | $5.50 | $5.50 | $6.00 | $1.10 | $6.00 |
| 46 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,165 | $5.00 | $5.00 | $5.50 | $1.10 | $5.30 |
| 47 | Eliminating existing PM & markers (4") (677-7001) | LF | 640 | $2.00 | $1.00 | $1.10 | $1.10 | $1.25 |
| 48 | Eliminating existing PM & markers (8") (677-7004) | LF | 185 | $1.50 | $1.00 | $1.10 | $2.20 | $1.25 |
| 49 | Eliminating existing PM & markers (24") (677-7008) | LF | 399 | $5.00 | $3.00 | $3.25 | $4.50 | $3.20 |
| 50 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 3 | $100.00 | $100.00 | $110.00 | $140.00 | $150.00 |
| 51 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $150.00 | $100.00 | $110.00 | $140.00 | $150.00 |
| 52 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 5 | $100.00 | $35.00 | $38.00 | $220.00 | $40.00 |
| 53 | Pavement surface preparation for marking (6") (678-7002) | LF | 250 | $1.25 | $0.50 | $0.55 | $1.10 | $0.55 |
| 54 | Pavement surface preparation for marking (8") (678-7004) | LF | 63 | $1.00 | $0.50 | $0.55 | $2.20 | $1.00 |
| 55 | Pavement surface preparation for marking (24") (678-7008) | LF | 93 | $1.50 | $2.50 | $2.75 | $4.40 | $3.00 |
| 56 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 4 | $26.08 | $75.00 | $80.00 | $140.00 | $80.00 |
| 57 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $28.35 | $75.00 | $80.00 | $140.00 | $80.00 |
| 58 | Litter removal (734-7002) | CYC | 1 | $3,000.00 | $2,500.00 | $1,600.00 | $4,000.00 | $2,750.00 |
| 59 | Membrane underseal (3005-7001) | GAL | 21,871 | $6.00 | $4.00 | $4.75 | $4.85 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.