TxDOT contract A00060559 bid tabulation
Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231)). Let by Texas DOT on April 7, 2026, Rusk, Tyler District. 8 bids received; low bid $8,734,908 by Drake Companies LLC, -2.8% against the engineer's estimate of $8,986,324.
- Owner
- Texas DOT
- Letting
- 07 APR 2026
- Pay items
- 109
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Drake Companies LLC | $8,734,908 | Low | -3.0% |
| 2 | Big Creek Construction, LTD. | $8,987,317 | +3.0% | 0.0% |
| 3 | Drewery Construction Company, Incorporated | $9,471,823 | +8.0% | +5.0% |
| 4 | Madden Contracting Company, LLC. | $9,683,458 | +11% | +8.0% |
| 5 | L. S. Equipment Co., Inc. | $9,760,584 | +12% | +9.0% |
| 6 | Reynolds & Kay, LTD. | $9,788,549 | +12% | +9.0% |
| 7 | Longview Bridge and Road, LTD. | $10,388,495 | +19% | +16% |
| 8 | A. L. Helmcamp, Inc. | $11,577,804 | +33% | +29% |
Engineer's estimate: $8,986,324.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Drake Companies LLC | 2. Big Creek Construction, LTD. | 3. Drewery Construction Company, Incorporated | 4. Madden Contracting Company, LLC. | 5. L. S. Equipment Co., Inc. | 6. Reynolds & Kay, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 266.69 | $2,000.00 | $3,000.00 | $3,200.00 | $2,050.00 | $3,000.00 | $2,800.00 | $3,018.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 72 | $18.00 | $20.00 | $33.00 | $31.00 | $49.00 | $16.00 | |
| 3 | Excavation (roadway) (110-7001) | CY | 1,221 | $15.00 | $22.00 | $30.00 | $26.00 | $25.22 | $15.00 | $23.00 |
| 4 | Subgr widen (DC) (112-7002) | STA | 266.69 | $292.00 | $295.00 | $850.00 | $500.00 | $233.30 | $875.00 | $500.00 |
| 5 | Embankment (vehicle)(OC)(type A) (132-7013) | CY | 168 | $16.00 | $50.00 | $200.00 | $50.00 | $50.00 | $45.00 | |
| 6 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 135.50 | $54.00 | $19.25 | $100.00 | $200.00 | $50.00 | $50.00 | $65.00 |
| 7 | Backfill (type A) (134-7001) | STA | 266.69 | $350.00 | $165.00 | $250.00 | $250.00 | $471.17 | $295.00 | $1,700.00 |
| 8 | Blading (150-7001) | STA | 281.49 | $100.00 | $145.00 | $300.00 | $312.00 | $402.93 | $250.00 | $350.00 |
| 9 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 121,469 | $0.60 | $0.53 | $0.55 | $0.60 | $0.48 | $0.75 | $0.60 |
| 10 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 60,353 | $0.57 | $0.53 | $0.55 | $0.55 | $0.48 | $0.75 | $0.55 |
| 11 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 60,353 | $0.56 | $0.53 | $0.55 | $0.55 | $0.48 | $0.75 | $0.55 |
| 12 | Vegetative watering (168-7001) | TGL | 2,924 | $17.00 | $12.00 | $20.00 | $25.00 | $20.00 | $0.01 | $20.00 |
| 13 | Proof rolling (216-7001) | HR | 96 | $135.00 | $195.00 | $100.00 | $170.00 | $200.00 | $150.00 | $70.00 |
| 14 | Rework BS metal (type C)(8")(ord comp) (251-7051) | SY | 57,756 | $3.00 | $2.75 | $2.50 | $2.25 | $3.25 | $7.50 | $2.00 |
| 15 | Cement (275-7001) | TON | 1,724.25 | $280.00 | $250.00 | $230.00 | $235.00 | $245.86 | $240.00 | $265.00 |
| 16 | Cement TRT (existing material)(8") (275-7003) | SY | 83,297 | $4.00 | $2.50 | $3.50 | $3.95 | $5.21 | $4.50 | $4.50 |
| 17 | Asphalt (RC-250) (316-7016) | GAL | 23,323 | $5.20 | $5.50 | $5.25 | $6.40 | $6.36 | $5.00 | $7.00 |
| 18 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 31,216 | $6.00 | $4.40 | $4.25 | $5.50 | $4.75 | $5.25 | $5.00 |
| 19 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 693 | $210.00 | $176.00 | $170.00 | $170.00 | $200.10 | $195.00 | $177.00 |
| 20 | Aggregate (type-PD GR-5 or type-PL GR-5) (316-7283) | CY | 595 | $220.00 | $166.00 | $200.00 | $190.00 | $255.85 | $205.00 | $205.00 |
| 21 | SP mixes SP-B PG64-22 (344-7001) | TON | 18,361.30 | $140.00 | $137.75 | $120.00 | $149.00 | $150.00 | $142.50 | $138.00 |
| 22 | SP mixes SP-C PG64-22 (level-UP) (344-7012) | TON | 1,522.62 | $140.00 | $158.50 | $150.00 | $188.00 | $175.00 | $162.00 | $160.00 |
| 23 | SP mixes SP-C PG76-22 (344-7029) | TON | 9,022.07 | $144.00 | $154.95 | $140.00 | $150.00 | $175.00 | $158.50 | $150.00 |
| 24 | Tack coat (344-7077) | GAL | 12,080 | $5.00 | $4.20 | $1.00 | $3.50 | $0.01 | $5.00 | $3.00 |
| 25 | Cut & restoring pavement (400-7006) | SY | 33 | $350.00 | $250.00 | $125.00 | $210.00 | $145.00 | $210.00 | $170.00 |
| 26 | Flowable backfill (401-7001) | CY | 20 | $365.00 | $280.00 | $350.00 | $368.00 | $410.00 | $500.00 | $350.00 |
| 27 | Trench excavation protection (402-7001) | LF | 56 | $80.00 | $25.00 | $20.00 | $36.00 | $25.00 | $7.00 | $1.00 |
| 28 | Temporary special shoring (403-7001) | SF | 1,047 | $59.00 | $58.00 | $35.00 | $52.00 | $33.00 | $50.00 | $65.00 |
| 29 | Class C concrete (collar) (420-7061) | EACH | 28 | $1,320.00 | $1,075.00 | $600.00 | $893.00 | $675.00 | $1,800.00 | $1,000.00 |
| 30 | Riprap (concrete)(CL B) (432-7005) | CY | 4 | $900.00 | $710.00 | $900.00 | $1,000.00 | $750.00 | $725.00 | $1,100.00 |
| 31 | Riprap (mow strip)(4 in) (432-7013) | CY | 36 | $595.00 | $800.00 | $980.00 | $695.00 | $625.00 | $900.00 | |
| 32 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 43 | $406.00 | $235.00 | $200.00 | $335.00 | $230.00 | $350.00 | $300.00 |
| 33 | Retrofit rail (type T131RC) (451-7049) | LF | 320 | $195.00 | $230.00 | $275.00 | $186.00 | $185.00 | $200.00 | |
| 34 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 24 | $1,200.00 | $895.00 | $1,600.00 | $1,000.00 | $925.00 | $900.00 | $1,200.00 |
| 35 | Concrete box culvert (8 FT X 6 FT)(extend) (462-7078) | LF | 26 | $1,225.00 | $960.00 | $1,800.00 | $1,450.00 | $1,220.00 | $975.00 | $1,400.00 |
| 36 | RC pipe (CL III)(18 in) (464-7003) | LF | 830 | $50.00 | $55.00 | $70.00 | $80.00 | $51.00 | $68.00 | $70.00 |
| 37 | RC pipe (CL III)(24 in) (464-7005) | LF | 228 | $65.00 | $75.00 | $100.00 | $134.00 | $73.00 | $87.50 | $90.00 |
| 38 | RC pipe (CL III)(30 in) (464-7007) | LF | 16 | $150.00 | $150.00 | $190.00 | $160.00 | $152.50 | $140.00 | |
| 39 | RC pipe (CL III)(36 in) (464-7009) | LF | 54 | $155.00 | $200.00 | $212.00 | $165.00 | $200.00 | $155.00 | |
| 40 | RC pipe (CL III)(48 in) (464-7011) | LF | 16 | $220.00 | $260.00 | $300.00 | $324.00 | $260.00 | $350.00 | $245.00 |
| 41 | RC pipe (CL III)(54 in) (464-7012) | LF | 24 | $250.00 | $265.00 | $400.00 | $380.00 | $345.00 | $500.00 | $300.00 |
| 42 | Junction box(complete)(PJB)(3FTX5FT) (465-7007) | EACH | 1 | $7,100.00 | $10,000 | $9,500.00 | $6,950.00 | $7,100.00 | $6,500.00 | |
| 43 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 3 | $9,900.00 | $11,000 | $14,000 | $9,100.00 | $10,500 | $16,000 | |
| 44 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $12,500 | $10,660 | $13,000 | $18,000 | $12,200 | $11,500 | $26,000 |
| 45 | Headwall (CH - PW - 0) (diameter= 54 in) (466-7108) | EACH | 2 | $15,000 | $13,775 | $15,000 | $22,000 | $18,450 | $14,000 | $30,000 |
| 46 | Wingwall (PW - 2) (HW=7 FT) (466-7191) | EACH | 1 | $23,463 | $21,975 | $32,000 | $26,000 | $31,200 | $24,500 | $25,000 |
| 47 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 3 | $28,589 | $27,145 | $45,000 | $37,000 | $38,750 | $26,500 | $30,000 |
| 48 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 2 | $720.00 | $800.00 | $1,060.00 | $610.00 | $710.00 | $1,350.00 | |
| 49 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 7 | $950.00 | $815.00 | $825.00 | $1,060.00 | $610.00 | $710.00 | $1,350.00 |
| 50 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 4 | $955.00 | $950.00 | $1,060.00 | $610.00 | $900.00 | $1,350.00 | |
| 51 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 54 | $950.00 | $955.00 | $950.00 | $1,230.00 | $610.00 | $900.00 | $1,350.00 |
| 52 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 9 | $1,200.00 | $1,175.00 | $1,400.00 | $1,400.00 | $890.00 | $1,500.00 | $2,000.00 |
| 53 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 3 | $1,520.00 | $1,385.00 | $1,700.00 | $1,625.00 | $1,135.00 | $1,500.00 | $2,000.00 |
| 54 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 8 | $1,400.00 | $1,385.00 | $1,700.00 | $1,565.00 | $1,135.00 | $1,500.00 | $2,000.00 |
| 55 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 1 | $1,865.00 | $2,200.00 | $1,950.00 | $1,270.00 | $2,250.00 | $2,700.00 | |
| 56 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 1 | $2,350.00 | $3,400.00 | $2,455.00 | $1,880.00 | $2,250.00 | $3,000.00 | |
| 57 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 1 | $2,785.00 | $4,000.00 | $3,570.00 | $2,110.00 | $2,500.00 | $4,000.00 | |
| 58 | Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390) | EACH | 1 | $5,000.00 | $6,755.00 | $10,000 | $7,800.00 | $5,800.00 | $6,000.00 | $8,000.00 |
| 59 | Clean existing culverts (480-7001) | EACH | 6 | $4,000.00 | $1,050.00 | $2,000.00 | $2,230.00 | $1,000.00 | $1,500.00 | $1,700.00 |
| 60 | Removing structure (pipe) (496-7037) | EACH | 31 | $410.00 | $515.00 | $360.00 | $360.00 | $200.00 | $45.00 | $800.00 |
| 61 | Mobilization (500-7001) | LS | 1 | $664,095 | $580,000 | $880,000 | $700,000 | $606,000 | $800,000 | $688,000 |
| 62 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $6,000.00 | $5,150.00 | $4,000.00 | $3,500.00 | $10,000 | $2,500.00 | $5,000.00 |
| 63 | Portable changeable message sign (503-7001) | DAY | 42 | $150.00 | $135.00 | $150.00 | $233.00 | $100.00 | $150.00 | $100.00 |
| 64 | TMA (stationary) (505-7001) | DAY | 224 | $240.00 | $190.00 | $200.00 | $265.00 | $330.00 | $225.00 | $350.00 |
| 65 | TMA (mobile operation) (505-7003) | DAY | 72 | $310.00 | $275.00 | $400.00 | $265.00 | $0.01 | $225.00 | $100.00 |
| 66 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,320 | $40.00 | $42.00 | $60.00 | $36.00 | $39.00 | $55.00 | $35.00 |
| 67 | Rock filter dams (remove) (506-7011) | LF | 1,320 | $14.00 | $11.00 | $10.00 | $11.00 | $10.00 | $6.00 | $10.00 |
| 68 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 300 | $30.00 | $28.50 | $30.00 | $43.00 | $25.00 | $20.00 | $16.00 |
| 69 | Backhoe work (erosion & sediment control) (506-7030) | HR | 300 | $107.00 | $85.00 | $100.00 | $55.00 | $50.00 | $75.00 | $65.00 |
| 70 | Temporary sediment control fence (install) (506-7039) | LF | 4,400 | $4.30 | $4.00 | $4.20 | $4.00 | $3.69 | $4.50 | $4.00 |
| 71 | Temporary sediment control fence (remove) (506-7041) | LF | 4,400 | $1.00 | $1.00 | $1.00 | $1.00 | $0.75 | $0.75 | $0.90 |
| 72 | Intersections (ACP) (530-7002) | SY | 927 | $70.00 | $40.00 | $35.00 | $73.00 | $49.00 | $55.00 | $75.00 |
| 73 | Driveways (ACP) (530-7010) | SY | 3,082 | $70.00 | $48.00 | $40.00 | $77.00 | $44.25 | $46.00 | $49.00 |
| 74 | Turnouts (ACP) (530-7018) | SY | 186 | $109.00 | $48.00 | $40.00 | $81.00 | $71.00 | $55.00 | $157.00 |
| 75 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 51,614 | $0.26 | $0.17 | $0.20 | $0.25 | $0.30 | $0.18 | $0.15 |
| 76 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 25,587 | $0.28 | $0.29 | $0.20 | $0.25 | $0.30 | $0.25 | $0.15 |
| 77 | Metal W-beam guard fence (steel post) (540-7002) | LF | 500 | $30.00 | $40.00 | $33.50 | $30.00 | $32.00 | $33.00 | |
| 78 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,050.00 | $2,500.00 | $2,600.00 | $1,125.00 | $1,350.00 | $1,200.00 | |
| 79 | Remove metal beam guard fence (542-7001) | LF | 400 | $2.75 | $3.00 | $2.80 | $2.50 | $2.50 | $2.75 | |
| 80 | Remove terminal anchor section (542-7002) | EACH | 2 | $220.00 | $250.00 | $225.00 | $200.00 | $220.00 | $225.00 | |
| 81 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,440.00 | $3,300.00 | $3,500.00 | $3,125.00 | $3,300.00 | $3,500.00 | |
| 82 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $220.00 | $250.00 | $225.00 | $200.00 | $220.00 | $225.00 | |
| 83 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 17 | $330.00 | $370.00 | $350.00 | $375.00 | $336.00 | $366.00 | $375.00 |
| 84 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 2 | $380.00 | $410.00 | $400.00 | $415.00 | $371.00 | $375.00 | $400.00 |
| 85 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 52 | $700.00 | $760.00 | $700.00 | $770.00 | $690.00 | $696.50 | $775.00 |
| 86 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $875.00 | $890.00 | $900.00 | $900.00 | $809.00 | $820.00 | $900.00 |
| 87 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,500.00 | $1,450.00 | $1,500.00 | $1,500.00 | $1,318.00 | $1,340.00 | $1,400.00 |
| 88 | Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036) | EACH | 1 | $1,550.00 | $1,550.00 | $1,575.00 | $1,410.00 | $1,430.00 | $1,500.00 | |
| 89 | Remove SM RD SN sup&AM (644-7073) | EACH | 60 | $108.50 | $110.00 | $125.00 | $110.00 | $101.00 | $101.00 | $110.00 |
| 90 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $22.00 | $30.00 | $20.00 | $18.00 | $20.00 | $20.00 | |
| 91 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 12 | $28.00 | $40.00 | $28.00 | $25.00 | $35.00 | $28.00 | |
| 92 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 56 | $65.00 | $100.00 | $100.00 | $104.00 | $93.00 | $93.50 | $100.00 |
| 93 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 8 | $25.00 | $84.00 | $85.00 | $85.00 | $76.00 | $76.00 | $85.00 |
| 94 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 60,595 | $0.33 | $0.45 | $0.40 | $0.40 | $0.40 | $0.50 | $0.45 |
| 95 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 3,780 | $0.65 | $0.45 | $0.40 | $0.40 | $0.40 | $0.50 | $0.45 |
| 96 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 116,342 | $0.27 | $0.45 | $0.40 | $0.40 | $0.40 | $0.43 | $0.45 |
| 97 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 8,788 | $0.65 | $1.75 | $1.50 | $2.00 | $2.50 | $2.00 | $1.10 |
| 98 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 80 | $2.00 | $2.75 | $3.00 | $2.80 | $2.50 | $3.00 | $2.75 |
| 99 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 228 | $8.00 | $7.70 | $10.00 | $7.80 | $7.00 | $8.00 | $7.75 |
| 100 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 60,595 | $0.65 | $0.72 | $0.72 | $0.75 | $0.65 | $0.75 | $0.70 |
| 101 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,890 | $0.95 | $0.94 | $0.94 | $0.95 | $0.85 | $0.95 | $0.95 |
| 102 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 58,171 | $0.65 | $0.72 | $0.72 | $0.75 | $0.65 | $0.75 | $0.70 |
| 103 | Reflectorized pavement marker type I-A (672-7001) | EACH | 192 | $5.00 | $6.60 | $7.00 | $6.70 | $6.00 | $6.50 | $6.50 |
| 104 | Reflectorized pavement marker type I-C (672-7002) | EACH | 4 | $5.00 | $6.60 | $7.00 | $6.70 | $6.00 | $6.50 | $6.50 |
| 105 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 943 | $5.20 | $5.50 | $6.00 | $5.60 | $5.00 | $5.50 | $5.50 |
| 106 | Full - width mowing (730-7019) | CYC | 4 | $5,500.00 | $5,500.00 | $6,000.00 | $6,000.00 | $3,200.00 | $8,500.00 | $3,200.00 |
| 107 | Litter removal (734-7002) | CYC | 4 | $3,000.00 | $3,000.00 | $3,000.00 | $4,500.00 | $1,600.00 | $2,500.00 | $1,000.00 |
| 108 | Install FTB (5002-7001) | LF | 100 | $60.00 | $66.00 | $70.00 | $85.00 | $60.00 | $65.00 | $50.00 |
| 109 | Remove FTB (5002-7002) | LF | 100 | $15.00 | $22.00 | $20.00 | $15.00 | $20.00 | $25.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.