TxDOT letting results, April 4, 2024
38 contracts let by Texas DOT on April 4, 2024, $844,024,580 in low bids, a median of 4 bidders per contract. On the 38 with an engineer's estimate, the low bid came in under it 28 times; median low bid -6.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 38
- Low bids, total
- $844,024,580
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 04243001 | IH 35 Interchange improvement from N TEXAS BLVD to US 77 NORTH OF DENTON | Dallas District | 2 | Sema Construction, Inc. | $611,023,841 | $673,884,210 | +10% | +18% | TxDOT |
| 04243002 | SH 358 Construct ramps from NILE DRIVE to STAPLES STREET | Corpus Christi District | 3 | Bay LTD. | $57,997,939 | $58,059,246 | 0.0% | +31% | TxDOT |
| 04243003 | SH 300 Rehabilitate existing roadway from 0.3 MI S OF US 271 to 0.1 MI N OF S FM 3358 | Atlanta District | 3 | Madden Contracting Company, LLC. | $22,871,598 | $32,692,110 | +43% | -35% | TxDOT |
| 04243004 | US 60 Preventive maintenance from OCHILTREE CO LINE to CANADIAN RIVER | Amarillo District | 4 | Duininck, Inc. | $19,475,601 | $20,289,240 | +4.0% | -2.0% | TxDOT |
| 04243041 | US 87 Widen road - add lanes and shoulders from 0.5 MILES NORTH OF US 349 to 0.5 MILES SOUTH OF US 349 | Lubbock District | 4 | A. L. Helmcamp, Inc. | $14,793,665 | $14,978,220 | +1.0% | +23% | TxDOT |
| 04243005 | US 84 Hazard elimination & safety from SL 46 to 1.03 MI EAST OF FM 2458 | Lubbock District | 4 | Gratiot Construction, LTD. | $13,888,521 | $15,169,576 | +9.0% | -5.0% | TxDOT |
| 04243006 | US 90 Surfacing/roadway restoration from FRESH WATER CANAL to FM 2100 | Houston District | 4 | Texas Materials Group, Inc. | $11,991,170 | $12,620,008 | +5.0% | -13% | TxDOT |
| 04243008 | SH 111 Bridge replacement from AT LAVACA RIVER & LAVACA RIVR RELIF to STR # 0346-06-024 & -024 | Yoakum District | 5 | E-Z Bel Construction, LLC | $10,787,173 | $11,436,277 | +6.0% | -5.0% | TxDOT |
| 04243009 | SL 375 Surfacing/roadway restoration from US 62/180 (MONTANA) to PELLICANO | El Paso District | 2 | Dan Williams Company | $10,150,487 | $11,718,652 | +15% | -17% | TxDOT |
| 04243030 | FM 148 Rehabilitate existing roadway from FM 2613 to SH 274 | Dallas District | 5 | Baker & Company Construction, LLC | $9,345,342 | $9,974,949 | +7.0% | -15% | TxDOT |
| 04243010 | SH 146 Surfacing/roadway restoration from SL 227, SOUTH to US 90 | Beaumont District | 1 | Texas Materials Group, Inc. | $6,277,672 | -17% | TxDOT | ||
| 04243017 | US 85 Bridge replacement from US 85 EB to RIO GRANDE RIVER | El Paso District | 4 | Dan Williams Company | $4,910,196 | $5,995,918 | +22% | -15% | TxDOT |
| 04243007 | FM 3278 Bridge maintenance from AT TRINITY RIVER BRIDGE | Lufkin District | 2 | Hodges and Son Construction Company, Inc. | $4,878,702 | $5,076,257 | +4.0% | +28% | TxDOT |
| 04243013 | US 277 Bridge replacement from US 277 NB to PAINT CREEK | Abilene District | 6 | Coppell Construction Co., Inc. | $4,673,134 | $4,895,350 | +5.0% | 0.0% | TxDOT |
| 04243012 | SH 73 Hazard elimination & safety from 9TH AVE, NORTH to SH 87 OVERPASS | Beaumont District | 4 | Ragle Construction, Inc. | $4,485,763 | $4,975,417 | +11% | -9.0% | TxDOT |
| 04243026 | IH 40 Replace guardrail from GRAY C/L, EAST to US 83 | Childress District | 4 | 3LW Civil LLC | $3,449,940 | $3,911,868 | +13% | -9.0% | TxDOT |
| 04243018 | VA Remove/replace bridge rail from DISTRICTWIDE | Laredo District | 4 | Lucania Contractors LLC | $3,357,099 | $3,473,362 | +3.0% | +8.0% | TxDOT |
| 04243014 | IH 35 Landscape development from SAN GABRIEL RIVER to NORTHWEST BLVD | Austin District | 3 | Apex Landscape & Irrigation, LLC | $3,178,702 | $4,475,649 | +41% | -25% | TxDOT |
| 04243020 | SL 12 Traffic signal improvements from VARIOUS LOCATIONS to CITY OF DALLAS | Dallas District | 5 | Yunex LLC | $3,166,593 | $3,279,598 | +4.0% | -2.0% | TxDOT |
| 04243038 | SH 66 Bridge maintenance from WEST OF SH 205 to WEST OF SH 205 | Dallas District | 4 | Ragle Construction, Inc. | $2,188,896 | $2,781,360 | +27% | -47% | TxDOT |
| 04243021 | BI 35-E Hazard elimination & safety from 0.3 MI N OF FIELDS ST to E FLORIDA ST | San Antonio District | 6 | E-Z Bel Construction, LLC | $2,106,851 | $2,326,526 | +10% | -10% | TxDOT |
| 04243016 | US 290 Hazard elimination & safety from WASHINGTON C/L to HARRIS C/L | Houston District | 8 | Massana Construction Inc. | $1,970,595 | $2,101,210 | +7.0% | -38% | TxDOT |
| 04243019 | US 75 Install traffic signal from AT OUTER LOOP/ FOSTER CROSSING to IN ANNA | Dallas District | 3 | Yunex LLC | $1,895,529 | $2,181,059 | +15% | -8.0% | TxDOT |
| 04243023 | VA Bridge maintenance from DISTRICTWIDE | Odessa District | 9 | Relmco, Inc. | $1,854,643 | $1,914,493 | +3.0% | -13% | TxDOT |
| 04243022 | VA Pavement markings from VARIOUS LOCATIONS to IN DENTON COUNTY | Dallas District | 2 | Traffic Highway Maintenance, LLC | $1,824,551 | $2,057,485 | +13% | -7.0% | TxDOT |
| 04243037 | VA Rehabilitate existing roadway from VARIOUS LOCATIONS IN to HALE COUNTY | Lubbock District | 3 | Winding Road Construction, Inc. | $1,747,472 | $1,813,836 | +4.0% | -5.0% | TxDOT |
| 04243024 | SH 164 Bicycle and pedestrian improvements from N. DOUGLAS ST. to N. FRONT ST. | Waco District | 6 | Ti-Zack Concrete, LLC | $1,443,570 | $1,664,090 | +15% | 0.0% | TxDOT |
| 04243040 | US 59 Install illumination from AT FM 1997 | Atlanta District | 3 | Vaca Underground Utilities Inc | $1,254,209 | $1,472,898 | +17% | -7.0% | TxDOT |
| 04243025 | FM 1341 Bridge replacement from AT CYPRUS CREEK | San Antonio District | 9 | J3 Company, LLC | $1,193,211 | $1,415,239 | +19% | -20% | TxDOT |
| 04243027 | FM 493 Hazard elimination & safety from 0.1 MILES SOUTH OF FM 2812 to 0.1 MILES NORTH OF FM 2812 | Pharr District | 3 | The Levy Company, Inc. | $1,182,382 | $1,218,180 | +3.0% | 0.0% | TxDOT |
| 04243039 | VA Hazard elimination & safety from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | Tyler District | 4 | Stripe-A-Zone, LLC | $1,144,488 | $1,508,386 | +32% | -33% | TxDOT |
| 04243031 | CR Bridge replacement from BARTON CREEK RD AT BARTONS CREEK to STR# AA01-95-001 | Yoakum District | 10 | C. E. Barker, LTD. | $954,925 | $990,256 | +4.0% | -2.0% | TxDOT |
| 04243028 | VA Bridge maintenance from VARIOUS LOCATIONS | Paris District | 5 | DCC Construction and Services, L.L.C. | $865,586 | $1,081,746 | +25% | -3.0% | TxDOT |
| 04243034 | VA Hazard elimination & safety from VARIOUS LOCATIONS IN to VAN ZANDT CO | Tyler District | 5 | Marcom'S Mowing Service, LLC | $450,860 | $569,200 | +26% | -5.0% | TxDOT |
| 04243029 | IH 35 Landscape development from WINDY HILL RD to YARRINGTON RD | Austin District | 4 | Apex Landscape & Irrigation, LLC | $435,142 | $469,242 | +8.0% | -8.0% | TxDOT |
| 04243035 | VA Bridge maintenance from VARIOUS LOCATIONS to IN ROBERTSON COUNTY | Bryan District | 3 | Icos Management, LLC | $357,316 | $392,496 | +10% | +23% | TxDOT |
| 04243036 | US 183 Landscape development from CEMETERY STREET to CITY PARK ROAD | Austin District | 3 | Encino Landscape, Inc. | $323,325 | $392,464 | +21% | +7.0% | TxDOT |
| 04243033 | FM 1602 Intersection improvement from 0.10 MI N OF SH22 to SH22 | Waco District | 4 | Rise Up Construction LLC | $127,891 | $154,500 | +21% | -1.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.