Rise Up Construction LLC: TxDOT bid record
Rise Up Construction LLC submitted 42 bids on Texas DOT contracts in the data, from 01 FEB 2024 to 06 JAN 2026, and was the low bidder on 5 of them (12%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $3,129,902
- Latest bid
- 06 JAN 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 32 | 4 | 13% |
| 2025 | 9 | 1 | 11% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 10 | 2 | 20% |
| Waco District | 8 | 1 | 13% |
| Dallas District | 6 | 1 | 17% |
| Fort Worth District | 5 | 0 | 0% |
| Paris District | 3 | 0 | 0% |
| Abilene District | 2 | 0 | 0% |
| Bryan District | 2 | 0 | 0% |
| Atlanta District | 2 | 0 | 0% |
| Brownwood District | 2 | 1 | 50% |
| Houston District | 1 | 0 | 0% |
| Beaumont District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (install) | 506-7039 | LF | 13 | 9 (69%) | $1.00 | $4.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 13 | 6 (46%) | $1.00 | $1.00 |
| Portable changeable message sign | 503-7001 | DAY | 10 | 6 (60%) | $100.00 | $100.00 |
| TMA (stationary) | 505-7001 | DAY | 28 | 5 (18%) | $464.50 | $230.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 13 | 5 (38%) | $122.00 | $110.00 |
| Preparing row | 100-7002 | STA | 11 | 5 (45%) | $3,500.00 | $2,750.00 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 5 | 5 (100%) | $7.00 | $8.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 27 | 4 (15%) | $5,000.00 | $5,000.00 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 7 | 3 (43%) | $9.00 | $6.00 |
| Concrete structure repair (vertical & overhead) | 429-7007 | SF | 5 | 3 (60%) | $200.00 | $220.00 |
| Concrete curb & gutter (type II) | 529-7009 | LF | 7 | 2 (29%) | $50.00 | $42.58 |
| Conduit (PVC) (schedule 40) (2") | 618-7030 | LF | 5 | 2 (40%) | $20.00 | $15.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Garret Shields Infrastructure | 17 | 13 of 17 |
| Marcom'S Mowing Service, LLC | 9 | 7 of 9 |
| Rhino Equity, LLC | 9 | 7 of 9 |
| FNH Construction, LLC | 7 | 3 of 7 |
| Icos Management, LLC | 6 | 3 of 6 |
| Encino Landscape, Inc. | 6 | 3 of 6 |
| Synergy Signs & Services LLC | 6 | 4 of 6 |
| WG Engineering & Construction, LLC | 6 | 2 of 6 |
| Vaca Underground Utilities Inc | 5 | 4 of 5 |
| 3LW Civil LLC | 5 | 4 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 JAN 2026 | A00209701 | Paris District | Bridge Maintenance, SH 19 (At Lake Creek to .) | 9 of 10 | $4,040,051 | +59% |
| 05 NOV 2025 | A00206364 | Waco District | Construct Pedestrian Infrastructure, Various (FM 2483 City Limits to Morgan's Pt Rd to Morgan's Pt Rd from FM 2483 to Sobrante) | 8 of 11 | $3,169,887 | +28% |
| 15 OCT 2025 | A00216248 | Dallas District | CULVERT EXTENSION & CROSS DRAINAGE, SH0078 (SH 78 to TRM: 238+0.562) | 2 of 4 | $444,444 | 0.0% |
| 15 OCT 2025 | A00217466 | Fort Worth District | REHABILITATION OF EXISTING ROADWAY, FM1938 (Main Street to to Cardinal Lane) | 2 of 2 | $370,760 | +168% |
| 08 OCT 2025 | A00216261 | Dallas District | BRIDGE SCOUR REPAIR, US 175 (US 175 to At Prairie Creek) | 10 of 15 | $1,795,198 | +81% |
| 20 MAR 2025 | A00212222 | Waco District | MISCELLANEOUS CONCRETE REPAIR, SL0340 (Various locations to Across the Waco District) | 3 of 8 | $523,150 | +25% |
| 05 MAR 2025 | A00209741 | Dallas District | LARGE SIGN REPLACEMENT, IH0030 (Various Roadways in the to Dallas District) | 1 of 3 | $2,186,275 | Low, 19% under the second |
| 05 MAR 2025 | A00209768 | Paris District | Hazard Elimination & Safety, Various (Various Locations (off-system) to .) | 9 of 9 | $144,953 | +67% |
| 04 MAR 2025 | A00210291 | Waco District | Install/Replace Signs, FM 218 (@ FM 1702 to @ FM 1702) | 4 of 15 | $158,917 | +19% |
| 12 FEB 2025 | A00212338 | Dallas District | REMOVAL AND DISPOSAL OF DRIFTWOOD, FM3041 (Various Roadways in to Navarro County) | 8 of 8 | $429,765 | +215% |
| 13 NOV 2024 | A00211565 | Dallas District | REMOVAL AND DISPOSAL OF DRIFTWOOD, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | 6 of 8 | $499,542 | +122% |
| 07 NOV 2024 | A00194465 | Waco District | Install Raised Median, BU 190E (0.10 Mi W of FM 1113 to 0.10 Mi E of FM 1113) | 2 of 2 | $444,995 | +41% |
| 07 NOV 2024 | A00193096 | Tyler District | Install Illumination, Various (VARIOUS LOCATIONS IN SMITH COUNTY to .) | 7 of 7 | $979,907 | +227% |
| 06 NOV 2024 | A00198667 | Tyler District | Construct Pedestrian Infrastructure, Various (At various locations to in Tyler) | 6 of 7 | $1,245,245 | +44% |
| 06 NOV 2024 | A00204825 | Brownwood District | Install/Upgrade Drainage Structure(S), FM 3201 (CR 322 to CR 304) | 3 of 11 | $550,904 | +10% |
| 06 SEP 2024 | A00206546 | Tyler District | Install/Replace Signs, Various (Various roads to in City of Jacksonville) | 1 of 4 | $159,987 | Low, 5.0% under the second |
| 10 JUL 2024 | 07243223 | Waco District | FM 1695 Hazard elimination & safety from US 84 to FM 2063 | 4 of 9 | $533,862 | +15% |
| 10 JUL 2024 | 07243230 | Tyler District | CR Hazard elimination & safety from @ SAMUEL DR | 3 of 4 | $246,867 | +21% |
| 11 JUN 2024 | 06242301 | Brownwood District | US0183 Concrete structure repair from DISTRICT-WIDE to DISTRICT-WIDE | 1 of 5 | $240,308 | Low, 0.0% under the second |
| 07 JUN 2024 | 06241001 | Tyler District | FM1798 Bridge preventative maintenance from VARIOUS LOCATIONS to IN THE TYLER DISTRICT | 4 of 4 | $185,488 | +29% |
| 06 JUN 2024 | 06243255 | Waco District | US 84 Install raised median from 6TH ST to 8TH ST | 2 of 3 | $464,740 | +55% |
| 05 JUN 2024 | 06243026 | Tyler District | BS 19-J Construct pedestrian infrastructure from BEN BELT DR to HILLSIDE DR | 5 of 9 | $3,276,100 | +26% |
| 05 JUN 2024 | 06243030 | Fort Worth District | IH 30 Install/replace signs from PARKER COUNTY LINE to IH 35W | 5 of 8 | $2,312,776 | +39% |
| 05 JUN 2024 | 06243037 | Fort Worth District | US 67 Install/replace signs from S PATRICK ST to N PATRICK ST | 4 of 10 | $498,771 | +13% |
| 02 MAY 2024 | 05243042 | Tyler District | VA Hazard elimination & safety from VARIOUS LOCATIONS to GREGG CO | 7 of 8 | $404,291 | +68% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.