TxDOT contract A00212222 bid tabulation
MISCELLANEOUS CONCRETE REPAIR, SL0340 (Various locations to Across the Waco District). Let by Texas DOT on March 20, 2025, McLennan, Waco District. 8 bids received; low bid $420,190 by Beck-Reit & Sons, LTD., -29% against the engineer's estimate of $592,265.
- Owner
- Texas DOT
- Letting
- 20 MAR 2025
- Pay items
- 30
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Beck-Reit & Sons, LTD. | $420,190 | Low | -29% |
| 2 | Rhino Equity, LLC | $521,165 | +24% | -12% |
| 3 | Rise Up Construction LLC | $523,150 | +25% | -12% |
| 4 | Garret Shields Infrastructure | $534,305 | +27% | -10% |
| 5 | Blacksmith Ventures LLC | $560,159 | +33% | -5.0% |
| 6 | BK Field Operations LLC | $595,100 | +42% | 0.0% |
| 7 | Jackson Excavation, LLC | $618,355 | +47% | +4.0% |
| 8 | Structural Integrity Group LLC | $638,380 | +52% | +8.0% |
Engineer's estimate: $592,265.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Beck-Reit & Sons, LTD. | 2. Rhino Equity, LLC | 3. Rise Up Construction LLC | 4. Garret Shields Infrastructure | 5. Blacksmith Ventures LLC | 6. BK Field Operations LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb) (104-7016) | LF | 129 | $15.00 | $25.00 | $35.00 | $24.00 | $20.00 | $25.00 | $40.00 |
| 2 | Removing concrete (miscellaneous) (104-7046) | SY | 35 | $60.00 | $30.00 | $35.00 | $23.00 | $40.00 | $150.00 | $100.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 320 | $60.00 | $35.00 | $55.00 | $45.00 | $50.00 | $50.00 | $80.00 |
| 4 | Spec excavation work (original) (158-7004) | CY | 20 | $50.00 | $75.00 | $35.00 | $200.00 | $100.00 | $200.00 | $80.00 |
| 5 | Flowable backfill (401-7001) | CY | 216 | $400.00 | $299.00 | $210.00 | $350.00 | $400.00 | $450.00 | $500.00 |
| 6 | Class B concrete (miscellaneous) (420-7011) | CY | 5 | $950.00 | $650.00 | $900.00 | $350.00 | $1,000.00 | $1,000.00 | $800.00 |
| 7 | Class C concrete(pile encasement) (420-7059) | LF | 100 | $1,000.00 | $555.00 | $290.00 | $300.00 | $1,000.00 | $300.00 | $1,000.00 |
| 8 | Class C concrete (miscellaneous) (420-7067) | CY | 15 | $1,500.00 | $700.00 | $900.00 | $670.00 | $1,000.00 | $500.00 | $900.00 |
| 9 | Class C concrete (wingwalls) (420-7146) | CY | 2 | $3,000.00 | $2,100.00 | $1,500.00 | $1,050.00 | $1,000.00 | $35,000 | $2,500.00 |
| 10 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 25 | $200.00 | $22.00 | $200.00 | $280.00 | $200.00 | $200.00 | $170.00 |
| 11 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 277 | $230.00 | $210.00 | $150.00 | $250.00 | $200.00 | $200.00 | $150.00 |
| 12 | Concrete structure repair (standard) (429-7009) | SF | 70 | $250.00 | $210.00 | $135.00 | $200.00 | $150.00 | $300.00 | $200.00 |
| 13 | Riprap (concrete)(5 in) (432-7002) | CY | 10 | $700.00 | $650.00 | $900.00 | $600.00 | $600.00 | $500.00 | $500.00 |
| 14 | Riprap (stone protection)(12 in) (432-7041) | CY | 100 | $210.00 | $197.00 | $240.00 | $279.00 | $200.00 | $200.00 | $185.00 |
| 15 | Riprap (stone protection)(18 in) (432-7043) | CY | 500 | $250.00 | $197.00 | $240.00 | $289.00 | $200.00 | $200.00 | $185.00 |
| 16 | Riprap (stone protection)(24 in) (432-7045) | CY | 100 | $220.00 | $197.00 | $250.00 | $300.00 | $200.00 | $200.00 | $185.00 |
| 17 | Cleaning and sealing existing joints (438-7001) | LF | 250 | $60.00 | $55.00 | $35.00 | $75.00 | $50.00 | $45.00 | $50.00 |
| 18 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 250 | $60.00 | $55.00 | $35.00 | $75.00 | $50.00 | $45.00 | $55.00 |
| 19 | Gabions (galvanized) (459-7001) | CY | 10 | $500.00 | $233.00 | $120.00 | $1,500.00 | $300.00 | $300.00 | $300.00 |
| 20 | Set (replace pipe runner) (467-7004) | EACH | 3 | $500.00 | $450.00 | $7,500.00 | $400.00 | $3,500.00 | $3,000.00 | $1,900.00 |
| 21 | Mobilization (callout) (500-7002) | EACH | 8 | $1,500.00 | $1.00 | $10,000 | $1.00 | $1,000.00 | $1.00 | $8,000.00 |
| 22 | Mobilization (emergency) (500-7033) | EACH | 1 | $3,500.00 | $1.00 | $10,000 | $1.00 | $1,000.00 | $1.00 | $8,000.00 |
| 23 | Portable changeable message sign (503-7001) | DAY | 5 | $100.00 | $110.00 | $200.00 | $1.00 | $1.00 | $500.00 | $400.00 |
| 24 | TMA (stationary) (505-7001) | DAY | 55 | $250.00 | $1.00 | $150.00 | $1.00 | $300.00 | $375.00 | $1.00 |
| 25 | Temporary sediment control fence (install) (506-7039) | LF | 100 | $4.00 | $3.00 | $20.00 | $1.00 | $6.00 | $15.00 | $3.00 |
| 26 | Temporary sediment control fence (remove) (506-7041) | LF | 100 | $2.00 | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 27 | Concrete curb & gutter (type II) (529-7009) | LF | 29 | $60.00 | $30.00 | $125.00 | $55.00 | $40.00 | $500.00 | $180.00 |
| 28 | Concrete curb (doweled) (529-7012) | LF | 129 | $20.00 | $33.00 | $110.00 | $55.00 | $40.00 | $50.00 | $75.00 |
| 29 | Driftwood removal (735-7060) | CY | 100 | $100.00 | $100.00 | $30.00 | $200.00 | $120.00 | $150.00 | $100.00 |
| 30 | Maintenance speed limit signing (7010-7002) | DAY | 40 | $150.00 | $1.00 | $100.00 | $1.00 | $100.00 | $10.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.