TxDOT contract A00216248 bid tabulation
CULVERT EXTENSION & CROSS DRAINAGE, SH0078 (SH 78 to TRM: 238+0.562). Let by Texas DOT on October 15, 2025, Collin, Dallas District. 4 bids received; low bid $444,180 by Garret Shields Infrastructure, -31% against the engineer's estimate of $640,676.
- Owner
- Texas DOT
- Letting
- 15 OCT 2025
- Pay items
- 23
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $444,180 | Low | -31% |
| 2 | Rise Up Construction LLC | $444,444 | 0.0% | -31% |
| 3 | Ed Bell Construction Company | $478,896 | +8.0% | -25% |
| 4 | Highway 19 Construction LLC | $513,847 | +16% | -20% |
Engineer's estimate: $640,676.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. Rise Up Construction LLC | 3. Ed Bell Construction Company | 4. Highway 19 Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 1.78 | $7,573.99 | $10,000 | $5,000.00 | $16,000 | $5,000.00 |
| 2 | Drill seed (permanent_rural_clay) (164-7010) | SY | 2,001 | $2.00 | $0.20 | $15.00 | $12.00 | $5.00 |
| 3 | Vegetative watering (168-7001) | TGL | 303 | $10.00 | $10.00 | $100.00 | $1.00 | $10.00 |
| 4 | Cut & restoring pavement (400-7006) | SY | 21 | $245.00 | $200.00 | $200.00 | $400.00 | $350.00 |
| 5 | Cem stabil BKFL (400-7010) | CY | 39 | $250.00 | $300.00 | $450.00 | $350.00 | $350.00 |
| 6 | Temporary special shoring (403-7001) | SF | 496 | $22.50 | $80.00 | $39.00 | $1.00 | $55.00 |
| 7 | RC pipe (CL III)(30 in) (464-7007) | LF | 88 | $138.90 | $300.00 | $175.00 | $333.00 | $1,600.00 |
| 8 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 1 | $11,000 | $25,000 | $15,000 | $25,000 | $9,000.00 |
| 9 | Removing structure (pipe) (496-7007) | LF | 88 | $53.13 | $50.00 | $75.00 | $60.00 | $50.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $54,011 | $40,000 | $45,500 | $45,000 | $100,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $2,500.00 | $10,000 | $1,959.00 | $31,500 | $10,000 |
| 12 | TMA (stationary) (505-7001) | DAY | 68 | $400.00 | $300.00 | $400.00 | $100.00 | $250.00 |
| 13 | Rock filter dams (install) (type 3) (506-7003) | LF | 20 | $84.33 | $20.00 | $44.00 | $100.00 | $85.00 |
| 14 | Rock filter dams (remove) (506-7011) | LF | 20 | $34.00 | $10.00 | $1.00 | $50.00 | $10.00 |
| 15 | Temporary sediment control fence (install) (506-7039) | LF | 520 | $7.50 | $5.00 | $7.00 | $6.00 | $4.00 |
| 16 | Temporary sediment control fence (remove) (506-7041) | LF | 520 | $4.50 | $1.00 | $1.00 | $3.00 | $1.00 |
| 17 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 250 | $4.63 | $8.00 | $9.00 | $10.00 | $10.00 |
| 18 | Biodegradable erosion control logs (remove) (506-7046) | LF | 250 | $1.60 | $1.00 | $1.00 | $5.00 | $1.00 |
| 19 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 4) (512-7008) | LF | 380 | $40.00 | $80.00 | $300.00 | $40.00 | $100.00 |
| 20 | Portable concrete traffic barrier (remove)(F-shape)(type 4) (512-7056) | LF | 380 | $20.00 | $20.00 | $75.00 | $20.00 | $25.00 |
| 21 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $2,566.67 | $500.00 | $1.00 | $800.00 | $2,500.00 |
| 22 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $13,200 | $10,000 | $9,022.00 | $9,000.00 | $9,500.00 |
| 23 | Slip lining culvert pipe 30" (7074-7001) | LF | 277 | $1,500.00 | $600.00 | $189.21 | $633.00 | $266.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.