Massana Construction Inc.: TxDOT bid record

Massana Construction Inc. submitted 69 bids on Texas DOT contracts in the data, from 09 APR 2020 to 10 NOV 2026, and was the low bidder on 26 of them (38%). When it was not low, its total sat a median +13% above the low bid.

Owner
Texas DOT
Low bid volume
$55,436,933
Latest bid
10 NOV 2026
Data through
19 NOV 2026
69Bids
26Low bids
38Win rate, percent
+13%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
20202150%
20217343%
20226350%
202315853%
202413431%
202510440%
202616319%
Massana Construction Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Lubbock District8338%
Corpus Christi District8563%
San Angelo District5240%
Atlanta District5120%
Amarillo District4125%
San Antonio District400%
Pharr District4250%
Odessa District300%
Abilene District3133%
Childress District3133%
Houston District3267%
Dallas District200%
Massana Construction Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY6438 (59%)$92.50$230.00
Riprap (mow strip)(4 in)432-7013CY3628 (78%)$350.00$643.00
Biodegradable erosion control logs (remove)506-7046LF4120 (49%)$1.25$1.40
Portable changeable message sign503-7002EACH2819 (68%)$2,500.00$10,000
Portable changeable message sign503-7001DAY2417 (71%)$32.50$100.00
Cable barrier system (TL-4)543-6002LF4213 (31%)$12.50$12.55
Riprap (mow strip)(5 in)432-7014CY1713 (76%)$360.00$580.00
TMA (mobile operation)505-7003DAY1610 (63%)$115.00$291.17
Temporary sediment control fence (remove)506-7041LF279 (33%)$1.50$1.00
Temporary sediment control fence (install)506-7039LF279 (33%)$5.00$4.00
Biodegradable erosion control logs (install) (12")506-7044LF217 (33%)$6.25$6.00
Blading150-7001STA145 (36%)$72.50$200.00
Massana Construction Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Massana Construction Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
10 NOV 2026A00223833Childress DistrictCABLE BARRIER REPAIR, IH0040 (Various Locations ~ See Plans to Various Locations ~ See Plans)5 of 5$255,356+118%
05 NOV 2026A00224315Lubbock DistrictCABLE BARRIER REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)3 of 4$391,569+31%
03 NOV 2026A00219247Laredo DistrictHazard Elimination & Safety, US 83 (PALO BLANCO to WEBB/ZAPATA COUNTY LINE)2 of 4$1,517,404+2.0%
03 NOV 2026A00211095Odessa DistrictBridge Maintenance, US 90 (AT 19.6 MI E OF SH 349 to .)5 of 7$3,332,351+15%
15 OCT 2026A00222534Waco DistrictLARGE SIGN REPLACEMENT, SH0006 (Various locations to Across the Waco District)7 of 7$619,916+124%
07 OCT 2026A00217419Odessa DistrictInstall/Replace Signs, Various (DISTRICTWIDE to .)6 of 6$1,721,139+91%
06 OCT 2026A00219765Pharr DistrictLARGE SIGN REPLACEMENT, IH0069C (DISTRICT WIDE to IH69C)3 of 3$1,736,684+58%
06 OCT 2026A00222422Dallas DistrictLARGE SIGN REPLACEMENT, US0080 (Various Roadways in the to Dallas District)4 of 4$4,741,051+28%
06 OCT 2026A00207050Lubbock DistrictHazard Elimination & Safety, US 60 (FM1172 to Castro County Line)2 of 6$1,804,504+6.0%
03 SEP 2026A00206876Corpus Christi DistrictHazard Elimination & Safety, US 181 (0.22 miles south of SH 359 to 0.9 miles south of SH 359)5 of 5$2,340,342+25%
03 SEP 2026A00184246Lubbock DistrictHazard Elimination & Safety, US 87 (CR0336 to Martin County LIne)5 of 5$5,534,357+39%
01 JUL 2026A00213461San Angelo DistrictHazard Elimination & Safety, US 87 (TOM GREEN COUNTY LINE to 17.210 MI E OF TOM GREEN COUNTY LINE)1 of 5$2,660,738Low, 0.0% under the second
17 JUN 2026A00221510Atlanta DistrictLARGE SIGN REPLACEMENT, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)4 of 4$1,012,016+49%
04 MAR 2026A00193135Lufkin DistrictHazard Elimination & Safety, US 69 (FM 1270 to JASPER COUNTY LINE)1 of 7$1,511,792Low, 15% under the second
04 MAR 2026A00193516Corpus Christi DistrictHazard Elimination & Safety, US 181 (FM 351 to 0.6 miles S of BU 181J)1 of 7$1,569,681Low, 46% under the second
05 FEB 2026A00192940Atlanta DistrictHazard Elimination & Safety, SL 281 (Gregg CL to IH 20)2 of 9$1,649,288+2.0%
05 NOV 2025A00209917San Antonio DistrictHazard Elimination & Safety, SH 16 (1000 ft North of Rockport Rd to Leon Creek)3 of 12$1,199,130+6.0%
08 OCT 2025A00192942Beaumont DistrictHazard Elimination & Safety, US 96 (0.2 MI S FM 1005 to 0.4MI S OF CR 441)1 of 8$989,115Low, 16% under the second
04 SEP 2025A00192921Pharr DistrictHazard Elimination & Safety, US 83 (0.3 Miles East of Vanderpool Rd. to Tabasco Rd.)6 of 9$884,602+20%
08 AUG 2025A00184262Lubbock DistrictHazard Elimination & Safety, US 62 (Hockley County Line to 73rd St in Lubbock)1 of 7$2,699,559Low, 7.0% under the second
02 JUL 2025A00206684Austin DistrictHazard Elimination & Safety, US 281 (Stanton Rd to US 290E)1 of 7$610,125Low, 13% under the second
01 JUL 2025A00193596Houston DistrictHazard Elimination & Safety, US 90 (East of SL 8 to Liberty County Line)2 of 8$3,251,689+12%
01 MAY 2025A00212188Corpus Christi DistrictHazard Elimination & Safety, US 181 (Bee Co. Line to FM 3089)1 of 8$584,654Low, 7.0% under the second
01 MAY 2025A00210962Waco DistrictInstall/Replace Signs, Various (Various to Various)8 of 10$2,199,746+19%
27 FEB 2025A00214035Amarillo DistrictCABLE BARRIER REPAIR, IH0040 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS)6 of 6$450,826+74%
Massana Construction Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy