TxDOT contract A00222422 bid tabulation
LARGE SIGN REPLACEMENT, US0080 (Various Roadways in the to Dallas District). Let by Texas DOT on October 6, 2026, Dallas, Dallas District. 4 bids received; low bid $3,713,700 by Synergy Signs & Services LLC, +24% against the engineer's estimate of $2,988,038.
- Owner
- Texas DOT
- Letting
- 06 OCT 2026
- Pay items
- 59
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Synergy Signs & Services LLC | $3,713,700 | Low | +24% |
| 2 | RCR Telecon LLC | $4,021,937 | +8.0% | +35% |
| 3 | American Lighting and Signalization, LLC | $4,100,000 | +10% | +37% |
| 4 | Massana Construction Inc. | $4,741,051 | +28% | +59% |
Engineer's estimate: $2,988,038.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Synergy Signs & Services LLC | 2. RCR Telecon LLC | 3. American Lighting and Signalization, LLC | 4. Massana Construction Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 20 | $25.00 | $50.00 | $168.00 | $88.00 | $350.00 |
| 2 | Removing concrete (foundations) (104-7024) | CY | 12 | $46.00 | $500.00 | $1,060.00 | $88.00 | $600.00 |
| 3 | Removing concrete (traffic barrier) (104-7035) | LF | 40 | $75.00 | $100.00 | $250.00 | $81.00 | $400.00 |
| 4 | Concrete pavement (CRCP) (13") (360-7007) | SY | 20 | $100.00 | $500.00 | $613.00 | $220.00 | $500.00 |
| 5 | Temporary special shoring (403-7001) | SF | 400 | $25.00 | $50.00 | $95.00 | $135.00 | $50.00 |
| 6 | Drilled shaft (36 in) (416-7006) | LF | 18 | $300.00 | $300.00 | $424.00 | $561.00 | $575.00 |
| 7 | Drilled shaft (48 in) (416-7008) | LF | 20 | $634.00 | $600.00 | $583.00 | $835.00 | $875.00 |
| 8 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 200 | $200.00 | $250.00 | $310.00 | $300.00 | $500.00 |
| 9 | Drilled shaft (sign mounts) (30 in) (416-7029) | LF | 300 | $495.00 | $300.00 | $375.00 | $340.00 | $520.00 |
| 10 | Drilled shaft (sign mounts) (36 in) (416-7030) | LF | 120 | $650.00 | $375.00 | $365.00 | $400.00 | $550.00 |
| 11 | Drilled shaft (sign mounts) (42 in) (416-7031) | LF | 32 | $900.00 | $475.00 | $519.00 | $520.00 | $750.00 |
| 12 | Drilled shaft (sign mounts) (48 in) (416-7032) | LF | 48 | $900.00 | $575.00 | $595.00 | $953.00 | $875.00 |
| 13 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 130 | $900.00 | $700.00 | $675.00 | $1,200.00 | $925.00 |
| 14 | Class C concrete (sign column) (420-7057) | CY | 100 | $1,500.00 | $1,500.00 | $1,394.00 | $978.00 | $1,750.00 |
| 15 | Class K concrete (miscellaneous) (420-7148) | CY | 35 | $2,517.17 | $1,500.00 | $1,505.00 | $864.00 | $550.00 |
| 16 | Riprap (mow strip)(4 in) (432-7013) | CY | 30 | $600.00 | $650.00 | $850.00 | $945.00 | $650.00 |
| 17 | Mobilization (callout) (500-7002) | EACH | 10 | $4,500.00 | $2,500.00 | $33,562 | $18,000 | $95,867 |
| 18 | Portable changeable message sign (503-7001) | DAY | 50 | $100.00 | $150.00 | $73.00 | $43.10 | $30.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 300 | $200.00 | $200.00 | $282.00 | $303.00 | $90.00 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 20 | $150.00 | $250.00 | $320.00 | $303.00 | $90.00 |
| 21 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 40 | $11.00 | $10.00 | $6.00 | $4.03 | $20.00 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 40 | $1.50 | $5.00 | $2.80 | $1.22 | $10.00 |
| 23 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 400 | $74.00 | $100.00 | $140.00 | $119.00 | $85.00 |
| 24 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 400 | $74.00 | $25.00 | $34.00 | $59.40 | $20.00 |
| 25 | Permanent CTB (tran SSCB to CTB) (mod) (514-7037) | LF | 40 | $320.00 | $300.00 | $836.00 | $324.00 | $550.00 |
| 26 | Metal W-beam guard fence (steel post) (540-7002) | LF | 600 | $30.00 | $40.00 | $35.00 | $36.20 | $31.00 |
| 27 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | $1,650.00 | $2,650.00 | $2,977.00 | $3,300.00 | $2,456.00 |
| 28 | Downstream anchor terminal section (540-7015) | EACH | 1 | $600.00 | $1,750.00 | $1,861.00 | $2,595.00 | $1,625.00 |
| 29 | Remove metal beam guard fence (542-7001) | LF | 100 | $50.00 | $10.00 | $4.00 | $5.40 | $5.00 |
| 30 | Remove terminal anchor section (542-7002) | EACH | 2 | $75.00 | $500.00 | $400.00 | $810.00 | $200.00 |
| 31 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $50.00 | $500.00 | $390.00 | $480.00 | $200.00 |
| 32 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $2,400.00 | $3,500.00 | $390.00 | $4,322.00 | $3,175.00 |
| 33 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $250.00 | $500.00 | $3,765.00 | $540.00 | $250.00 |
| 34 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $625.00 | $1,000.00 | $390.00 | $3,512.00 | $1,000.00 |
| 35 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 2 | $5,050.00 | $6,500.00 | $31,170 | $29,715 | $12,500 |
| 36 | Aluminum signs (type A) (636-7001) | SF | 300 | $40.00 | $40.00 | $31.00 | $43.60 | $125.00 |
| 37 | Aluminum signs (type G) (636-7002) | SF | 2,000 | $40.00 | $40.00 | $36.00 | $43.60 | $35.00 |
| 38 | Aluminum signs (type O) (636-7003) | SF | 7,000 | $37.00 | $40.00 | $44.00 | $51.00 | $35.00 |
| 39 | Replace existing aluminum signs(type A) (636-7004) | SF | 300 | $37.00 | $40.00 | $34.00 | $43.60 | $35.00 |
| 40 | Replace existing aluminum signs(type G) (636-7005) | SF | 2,000 | $37.00 | $40.00 | $38.00 | $43.60 | $40.00 |
| 41 | Replace existing aluminum signs(type O) (636-7006) | SF | 11,000 | $42.00 | $40.00 | $49.00 | $61.70 | $45.00 |
| 42 | Install LRSS (struct steel) (647-7001) | LB | 8,000 | $8.00 | $12.00 | $6.50 | $7.59 | $7.50 |
| 43 | Relocate lrsa (647-7002) | EACH | 2 | $1,780.00 | $10,000 | $15,215 | $3,342.00 | $5,500.00 |
| 44 | Remove lrsa (647-7003) | EACH | 40 | $888.00 | $1,500.00 | $3,945.00 | $2,161.00 | $1,250.00 |
| 45 | Install overhead sign support(25 FT cant) (650-7025) | EACH | 2 | $28,000 | $38,000 | $45,111 | $49,000 | $60,000 |
| 46 | Install overhead sign support(30 FT cant) (650-7032) | EACH | 3 | $30,000 | $45,000 | $48,159 | $50,000 | $62,000 |
| 47 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 4 | $32,000 | $52,000 | $49,440 | $52,000 | $64,000 |
| 48 | Install overhead sign support(40 FT cant) (650-7045) | EACH | 7 | $35,000 | $58,000 | $53,206 | $59,100 | $67,000 |
| 49 | Install overhead sign support(70 FT BRDG) (650-7079) | EACH | 1 | $49,000 | $110,000 | $78,376 | $81,000 | $92,000 |
| 50 | Install overhead sign support(80 FT BRDG) (650-7089) | EACH | 1 | $67,000 | $125,000 | $84,680 | $87,100 | $96,000 |
| 51 | Install overhead sign support(90 FT BRDG) (650-7099) | EACH | 1 | $67,000 | $140,000 | $94,330 | $106,000 | $104,000 |
| 52 | Install overhead sign support(100 FT BRDG) (650-7109) | EACH | 1 | $74,000 | $155,000 | $104,625 | $115,000 | $112,000 |
| 53 | Install overhead sign support(110 FT BRDG) (650-7119) | EACH | 1 | $84,000 | $165,000 | $113,219 | $122,000 | $117,000 |
| 54 | Install overhead sign support(120 FT BRDG) (650-7129) | EACH | 1 | $90,000 | $180,000 | $120,119 | $130,000 | $122,000 |
| 55 | Remove overhd sign sup (650-7193) | EACH | 3 | $8,000.00 | $15,000 | $4,854.00 | $5,800.00 | $8,000.00 |
| 56 | Remove overhd sign sup (sign only) (650-7194) | EACH | 5 | $2,425.00 | $2,500.00 | $1,750.00 | $750.00 | $2,500.00 |
| 57 | Relocate overhd sign sup (sign only) (650-7196) | EACH | 5 | $2,000.00 | $8,000.00 | $4,794.00 | $1,500.00 | $4,500.00 |
| 58 | Remove sign walkway (654-7007) | EACH | 5 | $2,500.00 | $3,000.00 | $4,854.00 | $3,000.00 | $4,000.00 |
| 59 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 20 | $15.00 | $50.00 | $53.00 | $37.80 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 6, 2026. Compiled by Mirage Metrics.