Bridge Maintenance, US 90 (AT 19.6 MI E OF SH 349 to .). Let by Texas DOT on November 3, 2026, Terrell, Odessa District. 7 bids received; low bid $2,888,888 by The Truesdell Corporation, -11% against the engineer's estimate of $3,246,904.
- Owner
- Texas DOT
- Letting
- 03 NOV 2026
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Truesdell Corporation | $2,888,888 | Low | -11% |
| 2 | Relmco, Inc. | $2,978,677 | +3.0% | -8.0% |
| 3 | Pathfield Investments LLC | $3,052,152 | +6.0% | -6.0% |
| 4 | Structural Integrity Group LLC | $3,205,119 | +11% | -1.0% |
| 5 | Massana Construction Inc. | $3,332,351 | +15% | +3.0% |
| 6 | SCR Civil Construction, LLC | $3,557,553 | +23% | +10% |
| 7 | Ragle Construction, Inc. | $3,982,565 | +38% | +23% |
Engineer's estimate: $3,246,904.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Truesdell Corporation | 2. Relmco, Inc. | 3. Pathfield Investments LLC | 4. Structural Integrity Group LLC | 5. Massana Construction Inc. | 6. SCR Civil Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7007) | CY | 31 | $160.00 | $50.00 | $240.00 | $280.00 | $1,900.00 | $910.00 | |
| 2 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 2,284 | $28.00 | $20.00 | $20.00 | $22.00 | $40.00 | $30.00 | |
| 3 | Flowable backfill (401-7001) | CY | 24 | $359.70 | $650.00 | $300.00 | $900.00 | $708.00 | $1,200.00 | $940.00 |
| 4 | Class C concrete (vehicle defl wall) (420-7062) | CY | 224 | $1,010.00 | $1,550.00 | $1,700.00 | $2,180.00 | $1,500.00 | $2,001.00 | |
| 5 | Epoxy waterproof finish (type X) (427-7005) | SF | 21,112 | $9.30 | $11.00 | $8.40 | $10.00 | $8.00 | $5.25 | $9.50 |
| 6 | Penetrating concrete surface treatment (428-7001) | SY | 2,605 | $16.60 | $14.00 | $14.70 | $18.00 | $14.00 | $8.00 | $16.50 |
| 7 | Concrete structure repair (epoxy mortar) (429-7002) | SF | 53 | $324.30 | $180.00 | $250.00 | $200.00 | $634.00 | $340.00 | $236.30 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 139 | $231.20 | $180.00 | $300.00 | $300.00 | $461.00 | $360.00 | $212.00 |
| 9 | Concrete structure repair (standard) (429-7009) | SF | 20 | $275.00 | $350.00 | $230.00 | $407.00 | $365.00 | $220.00 | |
| 10 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 31 | $750.00 | $1,250.00 | $1,200.00 | $800.00 | $1,500.00 | $1,211.00 | |
| 11 | Riprap (stone protection)(12 in) (432-7041) | CY | 1 | $616.20 | $2,000.00 | $2,750.00 | $2,000.00 | $2,000.00 | $4,500.00 | $710.00 |
| 12 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 181 | $85.00 | $74.80 | $50.00 | $65.00 | $35.00 | $78.00 | |
| 13 | Cleaning and sealing existing joints (CL5) (438-7006) | LF | 68 | $80.00 | $90.20 | $85.00 | $50.00 | $40.00 | $83.20 | |
| 14 | Cleaning existing joints (438-7008) | LF | 1,019 | $27.80 | $13.00 | $30.80 | $47.00 | $16.00 | $4.00 | $6.00 |
| 15 | Polyester polymer concrete overlay (1") (439-7021) | SY | 2,444 | $136.00 | $185.00 | $290.00 | $157.25 | $125.00 | $178.50 | |
| 16 | Retrofit rail (type T131RC) (451-7049) | LF | 1,804 | $230.00 | $242.00 | $230.00 | $309.00 | $275.00 | $315.00 | |
| 17 | Gabion mattresses (galvanized)(12 in) (459-7007) | SY | 428 | $163.90 | $150.00 | $125.00 | $240.00 | $263.00 | $145.00 | $325.00 |
| 18 | Gabion mattresses (galvanized) (24 in) (459-7009) | SY | 42 | $286.30 | $340.00 | $225.00 | $280.00 | $926.00 | $175.00 | $330.00 |
| 19 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 225 | $355.00 | $325.00 | $360.00 | $475.00 | $345.00 | $672.00 | |
| 20 | Mobilization (500-7001) | LS | 1 | $220,511 | $492,121 | $300,000 | $250,000 | $316,000 | $756,097 | $294,110 |
| 21 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $15,000 | $900.00 | $3,500.00 | $1,500.00 | $4,000.00 | $9,500.00 | $3,000.00 |
| 22 | Portable changeable message sign (503-7002) | EACH | 2 | $12,386 | $1,200.00 | $12,500 | $5,000.00 | $15,000 | $1,500.00 | $24,000 |
| 23 | TMA (stationary) (505-7001) | DAY | 280 | $289.50 | $200.00 | $150.00 | $100.00 | $1.00 | $55.00 | $225.00 |
| 24 | Metal W-beam guard fence (steel post) (540-7002) | LF | 350 | $34.90 | $38.00 | $37.40 | $35.00 | $35.00 | $35.00 | $42.00 |
| 25 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 14 | $3,070.60 | $3,000.00 | $2,970.00 | $2,500.00 | $2,650.00 | $2,700.00 | $3,475.00 |
| 26 | Remove metal beam guard fence (542-7001) | LF | 100 | $7.60 | $4.00 | $2.75 | $33.00 | $3.00 | $3.00 | $4.00 |
| 27 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $3,689.00 | $3,800.00 | $3,740.00 | $3,500.00 | $3,400.00 | $3,500.00 | $4,005.50 |
| 28 | Crash cushion attenuator (install)(L)(W)(TL3) (545-7008) | EACH | 6 | $42,388 | $46,500 | $58,500 | $10,000 | $48,550 | $46,000 | $60,800 |
| 29 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 44 | $59.90 | $130.00 | $35.00 | $90.00 | $25.00 | $45.00 | $42.00 |
| 30 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 26 | $54.10 | $40.00 | $35.00 | $95.00 | $35.00 | $45.00 | $42.00 |
| 31 | Pavement sler 6" (666-7347) | LF | 2,706 | $1.20 | $4.00 | $3.30 | $2.30 | $3.00 | $3.00 | $3.55 |
| 32 | Prefabricated PM type B (W)(6")(solid) (668-7009) | LF | 1,804 | $9.50 | $12.00 | $11.55 | $13.00 | $10.50 | $11.00 | $12.40 |
| 33 | Prefabricated PM type B (Y)(6")(broken) (668-7049) | LF | 902 | $7.30 | $12.00 | $11.55 | $9.00 | $10.50 | $11.00 | $12.40 |
| 34 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 25 | $8.70 | $22.00 | $22.00 | $15.00 | $20.00 | $20.00 | $23.60 |
| 35 | Pavement surface preparation for marking (6") (678-7002) | LF | 2,706 | $1.10 | $3.50 | $3.30 | $2.60 | $3.00 | $3.00 | $3.55 |
| 36 | Driftwood removal (735-7060) | CY | 10 | $260.00 | $500.00 | $250.00 | $1,260.00 | $125.00 | $544.00 | |
| 37 | Concrete CRCK repair(discrete)(rout and seal) (780-7003) | LF | 112 | $75.20 | $50.00 | $75.00 | $55.00 | $29.00 | $75.00 | $30.00 |
| 38 | CNC crack repair (discrete)(surface seal) (780-7004) | LF | 20 | $180.00 | $75.00 | $50.00 | $53.00 | $75.00 | $50.00 | |
| 39 | CNC crack repair (flood)(gravity) (780-7005) | SF | 400 | $15.00 | $75.00 | $18.00 | $1.00 | $90.00 | $24.00 | |
| 40 | Concrete beam repair (CFRP) (788-7002) | EACH | 3 | $12,000 | $5,500.00 | $11,000 | $13,200 | $18,000 | $25,675 | |
| 41 | Steel bridge zone painting (4010-7021) | SF | 3,600 | $25.00 | $26.87 | $26.00 | $21.00 | $25.00 | $30.00 | |
| 42 | Bridge deck cleaning (7001-7001) | SY | 5,265 | $15.20 | $9.00 | $5.00 | $15.00 | $6.00 | $1.20 | $11.80 |
| 43 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 52 | $1,826.50 | $555.00 | $483.75 | $700.00 | $450.00 | $185.00 | $555.00 |
| 44 | Bridge beam end cleaning (7001-7003) | EACH | 398 | $114.20 | $175.00 | $80.63 | $190.00 | $75.00 | $50.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.