Bay LTD.: TxDOT bid record
Bay LTD. submitted 37 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 06 JAN 2026, and was the low bidder on 7 of them (19%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $170,271,625
- Latest bid
- 06 JAN 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 3 | 43% |
| 2021 | 11 | 1 | 9% |
| 2022 | 3 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 5 | 2 | 40% |
| 2025 | 7 | 1 | 14% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Corpus Christi District | 36 | 7 | 19% |
| Edwards | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable concrete traffic barrier (furnish and install)(single slope)(type 1) | 512-7001 | LF | 13 | 10 (77%) | $17.00 | $69.70 |
| Excavation (roadway) | 110-7001 | CY | 19 | 5 (26%) | $12.00 | $20.00 |
| Set (type II) (24 in) (RCP) (6: 1) (P) | 467-7328 | EACH | 11 | 5 (45%) | $2,100.00 | $1,900.00 |
| Embankment (final)(density control)(type C) | 132-6006 | CY | 8 | 5 (63%) | $13.75 | $19.44 |
| Portable concrete traffic barrier (furnish and install)(low prof)(type 1) | 512-7009 | LF | 6 | 5 (83%) | $17.88 | $50.00 |
| TMA (stationary) | 505-7001 | DAY | 31 | 4 (13%) | $310.00 | $230.00 |
| Cem stabil BKFL | 400-7010 | CY | 18 | 4 (22%) | $100.00 | $200.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 17 | 4 (24%) | $150.00 | $108.13 |
| Portable concrete traffic barrier (remove)(single slope)(type 1) | 512-7049 | LF | 13 | 4 (31%) | $15.00 | $17.00 |
| D-GR HMA type D sac-B PG70-22 | 3076-6042 | TON | 13 | 4 (31%) | $110.00 | $119.64 |
| Portable changeable message sign | 503-7002 | EACH | 9 | 4 (44%) | $13,600 | $10,000 |
| Rail (type SSTR) | 450-7024 | LF | 8 | 4 (50%) | $100.00 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 18 | 11 of 18 |
| Hunter Industries, LTD. | 16 | 12 of 16 |
| J. Carroll Weaver, Inc. | 14 | 7 of 14 |
| CK Newberry, LLC | 14 | 10 of 14 |
| J E Construction Services, LLC | 13 | 10 of 13 |
| Haas-Anderson Construction, LTD. | 12 | 6 of 12 |
| Salinas Construction Technologies, LTD. | 11 | 8 of 11 |
| Angel Brothers Holdings Corp. | 6 | 2 of 6 |
| Mako Contracting, LLC | 4 | 2 of 4 |
| LCR Total Transport LLC | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 JAN 2026 | A00128788 | Corpus Christi District | Construct New Roadway Lanes, FM 624 (CR 73 to Wildcat Dr.) | 3 of 4 | $36,385,206 | +18% |
| 10 DEC 2025 | A00218244 | Corpus Christi District | MILL AND INLAY, BS0035L (FM 1069 to SL 70) | 3 of 4 | $877,811 | +26% |
| 05 NOV 2025 | A00119667 | Corpus Christi District | Widen Road - Add Lanes, SH 359 (3,800 FT S of FM 624 to FM 70) | 6 of 7 | $17,998,571 | +21% |
| 05 SEP 2025 | A00123610 | Corpus Christi District | Widen Road - Add Lanes And Shoulders, FM 893 (CR 3685 (STARK RD) to .2 MI W OF CR 3567 (GUM HOLLOW)) | 1 of 7 | $11,945,410 | Low, 7.0% under the second |
| 04 SEP 2025 | A00215070 | Corpus Christi District | REHABILITATION OF EXISTING ROADWAY, IH0037 (West Frontage RD PR 2024 to CR 1726) | 9 of 10 | $1,879,146 | +29% |
| 04 SEP 2025 | A00190970 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 18 (CR 18 Drainage Ditch to 0.55MI E of FM 892) | 9 of 9 | $2,020,592 | +43% |
| 14 JAN 2025 | A00213086 | Corpus Christi District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, FM1356 (BU 77 to .10 miles east of US 77) | 2 of 3 | $1,056,520 | +18% |
| 08 JAN 2025 | A00184668 | Corpus Christi District | Hazard Elimination & Safety, FM 24 (1.5 MI N OF SH 44 to 1.75 MI N OF SH 44) | 2 of 7 | $895,502 | +6.0% |
| 06 NOV 2024 | A00211127 | Corpus Christi District | HOT MIX, SH0035 (Broadway St to 1328 FT N OF FM 1781) | 1 of 2 | $1,776,045 | Low, 10% under the second |
| 06 JUN 2024 | 06243246 | Corpus Christi District | FM 738 Widen road - add shoulders from ON FM738 FROM .8 MI S OF CR303 to SOYARS AVE. | 7 of 7 | $3,328,236 | +67% |
| 04 APR 2024 | 04243002 | Corpus Christi District | SH 358 Construct ramps from NILE DRIVE to STAPLES STREET | 1 of 3 | $57,997,939 | Low, 0.0% under the second |
| 05 JAN 2024 | 01243217 | Corpus Christi District | US 181 Resurface roadway from SS 202 to 0.12 MI W OF FM 631 | 2 of 3 | $13,834,065 | +6.0% |
| 04 JAN 2024 | 01243003 | Corpus Christi District | SH 141 Widen road - add lanes from US 281 to KLEBERG COUNTY LINE | 3 of 3 | $28,597,946 | +15% |
| 07 SEP 2023 | 09233213 | Corpus Christi District | IH 37 Rehabilitate existing roadway from SH 188 to 0.47 MI SOUTH OF SH 188 (CONTROL BR | 6 of 7 | $7,494,251 | +24% |
| 27 JUN 2023 | 06233424 | Corpus Christi District | SH 358 Resurface roadway from AYERS to AIRLINE | 2 of 2 | $6,341,797 | +31% |
| 08 MAR 2023 | 03233204 | Corpus Christi District | SH 35 Interchange improvement (new or update) from ON SH35 AT CORPUS CHRISTI ST. INTER | 3 of 3 | $35,298,549 | +58% |
| 02 NOV 2022 | 11223009 | Corpus Christi District | US 281 Surfacing/roadway restoration from SOUTH OF FM 2508 to SH 141 | 3 of 4 | $4,736,920 | +4.0% |
| 03 AUG 2022 | 08223010 | Corpus Christi District | FM 624 Surfacing/roadway restoration from JIM WELLS COUNTY LINE to FM 666 | 3 of 5 | $12,344,749 | +22% |
| 06 APR 2022 | 04223002 | Corpus Christi District | US 281 Surfacing/roadway restoration from LIVE OAK COUNTY LINE to US 281 RELIEF ROUTE | 4 of 5 | $20,280,014 | +28% |
| 05 AUG 2021 | 08213240 | Corpus Christi District | SH 358 Construct pedestrian infrastructure from W. CARTER ST. to SH 202 | 4 of 6 | $3,656,904 | +44% |
| 05 AUG 2021 | 08214206 | Corpus Christi District | IH0037 Rehabilitation of existing roadway from IH0037 FRONTAGE ROAD (WESTSIDE) to FM 234 TO CR 1400 (CR 40) | 7 of 8 | $1,717,172 | +32% |
| 04 AUG 2021 | 08213004 | Corpus Christi District | SH 35 Interchange improvement (new or update) from 0.4 MILE NORTHEAST OF OAK LANE to 0.4 MILE SOUTHWEST OF OAK LANE | 1 of 3 | $17,952,983 | Low, 2.0% under the second |
| 04 AUG 2021 | 08213033 | Corpus Christi District | FM 665 Hazard elimination & safety from CR 107 to FM 666 | 3 of 3 | $5,442,188 | +21% |
| 02 JUL 2021 | 07213227 | Corpus Christi District | FM 3162 Widen road - add shoulders from FM 534 to END OF STATE MAINTENANCE | 6 of 9 | $2,953,600 | +26% |
| 01 JUL 2021 | 07213008 | Corpus Christi District | FM 81 Roadway rehabilitation/reconstruction with no add from SH 80 IN HELENA to FM 627 | 6 of 9 | $9,440,000 | +23% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.