TxDOT contract A00119667 bid tabulation
Widen Road - Add Lanes, SH 359 (3,800 FT S of FM 624 to FM 70). Let by Texas DOT on November 5, 2025, Jim Wells, Corpus Christi District. 7 bids received; low bid $14,897,452 by CK Newberry, LLC, -16% against the engineer's estimate of $17,836,723.
- Owner
- Texas DOT
- Letting
- 05 NOV 2025
- Pay items
- 90
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | CK Newberry, LLC | $14,897,452 | Low | -16% |
| 2 | Anderson Columbia Co., Inc. | $15,644,258 | +5.0% | -12% |
| 3 | J E Construction Services, LLC | $16,115,567 | +8.0% | -10% |
| 4 | Hunter Industries, LTD. | $16,496,597 | +11% | -8.0% |
| 5 | J. Carroll Weaver, Inc. | $17,433,210 | +17% | -2.0% |
| 6 | Bay LTD. | $17,998,571 | +21% | +1.0% |
| 7 | Go Underground, Limited Liability Company | $22,952,426 | +54% | +29% |
Engineer's estimate: $17,836,723.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. CK Newberry, LLC | 2. Anderson Columbia Co., Inc. | 3. J E Construction Services, LLC | 4. Hunter Industries, LTD. | 5. J. Carroll Weaver, Inc. | 6. Bay LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 87 | $20.00 | $20.00 | $44.00 | $9.00 | $29.70 | $29.53 | $26.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 29,969 | $8.00 | $6.00 | $8.00 | $11.00 | $12.10 | $12.09 | $4.80 |
| 3 | Embankment (final)(DC)(type C) (132-7006) | CY | 31,531 | $18.00 | $7.00 | $12.00 | $6.00 | $11.00 | $6.91 | $6.20 |
| 4 | Compost manuf topsoil (4") (161-7002) | SY | 165,567 | $2.24 | $0.75 | $1.40 | $2.00 | $0.99 | $1.75 | $2.10 |
| 5 | Drill seed (permanent_rural_sand) (164-7009) | SY | 165,567 | $0.26 | $0.10 | $0.14 | $0.25 | $0.13 | $0.14 | $0.70 |
| 6 | Vegetative watering (168-7001) | TGL | 2,582.80 | $22.50 | $10.00 | $24.00 | $19.00 | $23.10 | $28.35 | $5.70 |
| 7 | FL BS (roadway del)(type A GR 1-2)(final pos) (247-7259) | CY | 26,309 | $60.00 | $80.00 | $77.00 | $74.00 | $97.08 | $100.08 | $110.00 |
| 8 | Rework BS metal (type C)(12")(density control) (251-7056) | SY | 160,164 | $1.00 | $0.75 | $1.20 | $0.25 | $2.54 | $0.46 | $1.15 |
| 9 | Cement (275-7001) | TON | 3,248 | $220.00 | $185.00 | $220.00 | $171.00 | $204.60 | $206.47 | $210.00 |
| 10 | Cement TRT (existing material & new base)(12") (275-7009) | SY | 160,164 | $2.75 | $1.25 | $2.60 | $2.00 | $3.85 | $2.94 | $4.70 |
| 11 | Prime coat (RC-250) (310-7006) | GAL | 39,522 | $5.00 | $3.25 | $5.00 | $3.00 | $4.40 | $5.06 | $4.10 |
| 12 | Asphalt(AC-15P, HFRS-2P or CRS-2P) (316-7070) | GAL | 75,285 | $8.00 | $2.75 | $3.50 | $3.00 | $3.52 | $4.86 | $4.10 |
| 13 | Aggregate (type-PB, GR-4S or 4)(sac-B) (316-7212) | CY | 1,976 | $120.00 | $120.00 | $132.00 | $97.00 | $130.67 | $195.04 | $170.00 |
| 14 | Aggregate (type-PB, GR-5)(sac-B) (316-7214) | CY | 1,638 | $180.00 | $100.00 | $172.00 | $93.00 | $130.64 | $188.00 | $160.00 |
| 15 | D-GR HMA type-B sac-B PG64-22 (341-7002) | TON | 35,239 | $120.00 | $105.00 | $98.00 | $115.00 | $101.20 | $116.55 | $100.00 |
| 16 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 23,074 | $110.00 | $115.00 | $116.00 | $130.00 | $108.90 | $138.75 | $120.00 |
| 17 | Tack coat (341-7082) | GAL | 16,784 | $5.00 | $4.00 | $5.20 | $4.00 | $3.30 | $4.44 | $4.10 |
| 18 | Flexible pavement structure repair(3") (351-7002) | SY | 16,852 | $28.00 | $25.00 | $22.00 | $20.00 | $22.69 | $26.09 | $31.00 |
| 19 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 49,556 | $2.00 | $1.25 | $1.20 | $2.00 | $1.71 | $2.22 | $1.95 |
| 20 | Cem stabil BKFL (400-7010) | CY | 248 | $200.00 | $225.00 | $220.00 | $85.00 | $205.21 | $162.06 | $68.00 |
| 21 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 23 | $700.00 | $450.00 | $520.00 | $750.00 | $648.02 | $1,098.90 | $940.00 |
| 22 | Concrete box culvert (4 FT X 4 FT)(extend) (462-7060) | LF | 231 | $1,000.00 | $550.00 | $710.00 | $640.00 | $729.02 | $688.20 | $860.00 |
| 23 | Concrete box culvert (5 FT X 5 FT)(extend) (462-7064) | LF | 420 | $1,100.00 | $650.00 | $770.00 | $590.00 | $810.03 | $700.41 | $870.00 |
| 24 | Concrete box culvert (6 FT X 3 FT)(extend) (462-7066) | LF | 28 | $1,000.00 | $750.00 | $850.00 | $860.00 | $831.63 | $931.29 | $930.00 |
| 25 | RC pipe (CL III)(18 in) (464-7003) | LF | 452 | $80.00 | $90.00 | $115.00 | $91.00 | $73.44 | $92.13 | $170.00 |
| 26 | RC pipe (CL III)(24 in) (464-7005) | LF | 108 | $350.00 | $100.00 | $160.00 | $121.00 | $97.20 | $113.22 | $180.00 |
| 27 | Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(C) (467-7042) | EACH | 4 | $20,000 | $6,500.00 | $5,000.00 | $11,040 | $5,940.19 | $7,292.70 | $9,000.00 |
| 28 | Set (type I)(S= 4 FT)(HW= 5 FT)(6:1)(C) (467-7077) | EACH | 12 | $8,000.00 | $5,000.00 | $8,500.00 | $8,900.00 | $5,400.17 | $7,659.00 | $10,800 |
| 29 | Set (type I)(S= 4 FT)(HW= 6 FT)(4:1)(C) (467-7080) | EACH | 6 | $14,000 | $6,500.00 | $8,000.00 | $8,660.00 | $8,100.25 | $7,992.00 | $12,200 |
| 30 | Set (type I)(S= 5 FT)(HW= 5 FT)(6:1)(C) (467-7105) | EACH | 20 | $23,000 | $7,000.00 | $9,500.00 | $8,430.00 | $7,560.24 | $9,712.50 | $15,100 |
| 31 | Set (type I)(S= 6 FT)(HW= 6 FT)(6:1)(C) (467-7138) | EACH | 2 | $10,200 | $10,000 | $10,000 | $7,310.00 | $12,960 | $9,990.00 | $10,900 |
| 32 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 28 | $2,000.00 | $1,800.00 | $1,500.00 | $3,790.00 | $1,944.06 | $1,887.00 | $2,300.00 |
| 33 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 8 | $2,500.00 | $2,800.00 | $3,000.00 | $4,640.00 | $2,160.07 | $2,775.00 | $2,900.00 |
| 34 | Clean existing culverts (480-7001) | EACH | 23 | $1,250.00 | $1,000.00 | $2,700.00 | $2,660.00 | $2,160.07 | $2,553.00 | $1,800.00 |
| 35 | Removing structure (set) (496-7004) | EACH | 60 | $1,200.00 | $1,000.00 | $1,400.00 | $1,430.00 | $648.02 | $715.95 | $830.00 |
| 36 | Removing structure (pipe) (496-7007) | LF | 441 | $50.00 | $15.00 | $30.00 | $51.00 | $21.60 | $8.88 | $22.00 |
| 37 | Mobilization (500-7001) | LS | 1 | $1,722,301 | $1,215,000 | $910,000 | $1,456,845 | $1,259,719 | $856,943 | $1,291,600 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 22 | $5,000.00 | $8,000.00 | $3,000.00 | $5,430.00 | $6,701.96 | $6,105.00 | $4,300.00 |
| 39 | Portable changeable message sign (503-7001) | DAY | 175 | $107.00 | $60.00 | $67.00 | $65.00 | $119.19 | $111.00 | $110.00 |
| 40 | Rock filter dams (install) (type 2) (506-7007) | CY | 6 | $400.00 | $450.00 | $450.00 | $281.00 | $420.40 | $360.75 | $560.00 |
| 41 | Rock filter dams (remove) (506-7012) | CY | 6 | $180.00 | $150.00 | $150.00 | $90.00 | $143.06 | $55.50 | $55.00 |
| 42 | Construction exits (install) (type 1) (506-7020) | SY | 1,120 | $40.00 | $15.00 | $45.00 | $49.00 | $44.12 | $16.65 | $16.50 |
| 43 | Construction exits (remove) (506-7024) | SY | 1,120 | $10.00 | $5.00 | $12.00 | $13.00 | $11.78 | $11.10 | $7.25 |
| 44 | Temporary sediment control fence (install) (506-7039) | LF | 1,490 | $5.50 | $8.00 | $8.00 | $6.00 | $7.35 | $6.11 | $7.40 |
| 45 | Temporary sediment control fence (remove) (506-7041) | LF | 1,490 | $2.00 | $2.00 | $1.50 | $2.00 | $1.26 | $2.22 | $4.80 |
| 46 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 900 | $30.00 | $35.00 | $30.00 | $76.00 | $46.47 | $22.86 | $14.00 |
| 47 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 5,400 | $12.00 | $15.00 | $20.00 | $7.00 | $20.16 | $17.37 | $14.00 |
| 48 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 900 | $12.00 | $30.00 | $25.00 | $11.00 | $26.00 | $22.86 | $14.00 |
| 49 | Intersections (ACP) (530-7002) | SY | 3,211 | $15.00 | $50.00 | $110.00 | $71.00 | $45.10 | $64.38 | $78.00 |
| 50 | Driveways (concrete) (530-7006) | SY | 87 | $105.00 | $215.00 | $200.00 | $103.00 | $129.60 | $172.05 | $130.00 |
| 51 | Driveways (ACP) (530-7010) | SY | 5,071 | $15.00 | $50.00 | $50.00 | $59.00 | $45.10 | $32.19 | $110.00 |
| 52 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 65,018 | $0.20 | $0.10 | $0.14 | $0.25 | $0.19 | $0.12 | $0.21 |
| 53 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 54,908 | $0.20 | $0.12 | $0.14 | $0.25 | $0.23 | $0.17 | $0.25 |
| 54 | Remove metal beam guard fence (542-7001) | LF | 310 | $3.00 | $6.00 | $5.00 | $2.00 | $5.00 | $5.55 | $20.00 |
| 55 | Remove terminal anchor section (542-7002) | EACH | 2 | $350.00 | $900.00 | $300.00 | $195.00 | $300.00 | $555.00 | $3,200.00 |
| 56 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $350.00 | $900.00 | $300.00 | $201.00 | $300.00 | $555.00 | $3,200.00 |
| 57 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 24 | $1,250.00 | $450.00 | $1,200.00 | $1,590.00 | $1,100.00 | $2,572.31 | $2,900.00 |
| 58 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $1,000.00 | $450.00 | $1,000.00 | $703.00 | $875.00 | $2,572.31 | $2,900.00 |
| 59 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 4 | $8,900.00 | $7,500.00 | $9,000.00 | $8,050.00 | $8,350.00 | $8,325.00 | $5,800.00 |
| 60 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $1,250.00 | $1,000.00 | $1,000.00 | $905.00 | $901.00 | $1,054.50 | $1,100.00 |
| 61 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 57 | $1,000.00 | $750.00 | $800.00 | $640.00 | $687.00 | $821.40 | $840.00 |
| 62 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 5 | $1,000.00 | $825.00 | $1,000.00 | $650.00 | $758.00 | $999.00 | $930.00 |
| 63 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 31 | $1,000.00 | $850.00 | $1,000.00 | $790.00 | $788.00 | $1,037.85 | $970.00 |
| 64 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,200.00 | $1,000.00 | $1,200.00 | $980.00 | $964.00 | $1,498.50 | $1,200.00 |
| 65 | Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036) | EACH | 1 | $1,500.00 | $1,200.00 | $1,500.00 | $1,096.00 | $1,128.00 | $1,498.50 | $1,400.00 |
| 66 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 12 | $750.00 | $650.00 | $650.00 | $650.00 | $601.00 | $693.75 | $740.00 |
| 67 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 6,264 | $2.00 | $1.50 | $1.50 | $1.10 | $1.50 | $1.67 | $1.75 |
| 68 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 7,128 | $6.00 | $1.50 | $1.50 | $1.20 | $1.50 | $1.67 | $1.75 |
| 69 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 18,780 | $4.00 | $1.50 | $1.40 | $1.00 | $1.30 | $1.44 | $1.50 |
| 70 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 21,372 | $4.00 | $1.50 | $1.40 | $1.00 | $1.30 | $1.44 | $1.50 |
| 71 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 117,360 | $1.00 | $0.40 | $0.34 | $0.25 | $0.32 | $0.36 | $0.37 |
| 72 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 117,360 | $0.50 | $0.40 | $0.34 | $0.25 | $0.32 | $0.36 | $0.37 |
| 73 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 6,771 | $0.60 | $0.50 | $2.00 | $3.00 | $1.63 | $0.37 | $1.70 |
| 74 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 6,876 | $1.20 | $0.50 | $2.10 | $3.00 | $1.63 | $0.37 | $2.00 |
| 75 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 836 | $2.00 | $2.00 | $2.10 | $1.50 | $2.00 | $2.22 | $2.30 |
| 76 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 700 | $2.50 | $2.00 | $2.10 | $1.50 | $2.00 | $2.22 | $2.30 |
| 77 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 887 | $1.00 | $2.00 | $2.10 | $1.50 | $2.00 | $2.22 | $2.30 |
| 78 | Type I high perf PM (W)6"(broken)(090MIL) (666-7289) | LF | 5,009 | $1.00 | $2.00 | $2.10 | $1.50 | $2.00 | $2.22 | $2.30 |
| 79 | Type I high perf PM (W)6"(solid)(090MIL) (666-7292) | LF | 65,014 | $2.00 | $0.75 | $0.74 | $0.50 | $0.72 | $0.80 | $0.85 |
| 80 | Type I high perf PM (Y)6"(broken)(090MIL) (666-7301) | LF | 82,044 | $1.00 | $0.75 | $0.74 | $0.50 | $0.72 | $0.80 | $0.85 |
| 81 | Type I high perf PM (Y)6"(solid)(090MIL) (666-7304) | LF | 2,654 | $1.00 | $2.00 | $2.10 | $1.50 | $2.00 | $2.22 | $2.30 |
| 82 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 857 | $17.00 | $18.00 | $20.00 | $14.00 | $18.00 | $19.98 | $21.00 |
| 83 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 30 | $200.00 | $165.00 | $150.00 | $126.00 | $150.00 | $166.50 | $170.00 |
| 84 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 5 | $450.00 | $550.00 | $550.00 | $430.00 | $500.00 | $555.00 | $580.00 |
| 85 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $275.00 | $275.00 | $280.00 | $218.00 | $250.00 | $277.50 | $290.00 |
| 86 | Prefabricated PM type C (Y)(12")(solid) (668-7125) | LF | 175 | $7.00 | $18.00 | $20.00 | $14.00 | $18.00 | $19.98 | $21.00 |
| 87 | Reflectorized pavement marker type I-C (672-7002) | EACH | 58 | $5.50 | $15.00 | $16.00 | $13.00 | $15.00 | $16.65 | $17.50 |
| 88 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,051 | $6.00 | $8.00 | $8.00 | $6.00 | $7.50 | $8.33 | $8.70 |
| 89 | Eliminating existing PM & markers (4") (677-7001) | LF | 65,568 | $0.40 | $0.50 | $0.50 | $0.50 | $0.45 | $0.50 | $1.45 |
| 90 | Tree trimming / brush removal (752-7001) | MI | 5 | $10,900 | $25,000 | $5,000.00 | $8,200.00 | $11,000 | $14,000 | $5,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 5, 2025. Compiled by Mirage Metrics.