TxDOT letting results, January 14, 2025
25 contracts let by Texas DOT on January 14, 2025, $9,694,122 in low bids, a median of 3 bidders per contract. On the 25 with an engineer's estimate, the low bid came in under it 17 times; median low bid -5.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 25
- Low bids, total
- $9,694,122
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00213086 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, FM1356 (BU 77 to .10 miles east of US 77) | Corpus Christi District | 3 | Anderson Columbia Co., Inc. | $898,358 | $1,056,520 | +18% | -6.0% | TxDOT |
| A00213196 | HOT MIX, IH0045 (Various to Various) | Bryan District | 2 | Touchstone Resources, LLC | $880,000 | $900,000 | +2.0% | +13% | TxDOT |
| A00212386 | HOT MIX, SH0036 (Various Locations to Various Locations) | Houston District | 4 | Texas Materials Group, Inc. | $714,700 | $719,890 | +1.0% | -9.0% | TxDOT |
| A00212419 | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (VARIOUS to VARIOUS) | Odessa District | 4 | Icos Management, LLC | $686,631 | $798,236 | +16% | -10% | TxDOT |
| A00212392 | CLEANING AND SWEEPING HIGHWAYS, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County) | Houston District | 3 | Sweeping Corporation of America, LLC | $673,876 | $710,286 | +5.0% | -17% | TxDOT |
| A00211707 | CRASH CUSHION ATTENUATOR REPAIR, IH0069 (IH 69 various locations to IH 69 various locations) | Houston District | 6 | Roy Jorgensen Associates, Inc. | $516,859 | $581,050 | +12% | -9.0% | TxDOT |
| A00176523 | SMALL SIGN REPLACEMENT, SH0288 (VARIOUS HWYS WITHIN BRAZORIA COUNTY to VARIOUS HWYS WITHIN BRAZORIA COUNTY) | Houston District | 3 | Hazmat International, Inc. | $475,750 | $490,807 | +3.0% | -18% | TxDOT |
| A00213243 | METAL BEAM GUARD FENCE REPAIR, SH0030 (Various to Various) | Bryan District | 4 | Ross Sa Enterprise LLC | $465,520 | $555,225 | +19% | -34% | TxDOT |
| A00212884 | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (VARIOUS to .) | Corpus Christi District | 6 | Rhino Equity, LLC | $456,790 | $729,208 | +60% | -15% | TxDOT |
| A00213389 | LIMESTONE ROCK ASPHALT, US0181 (VARIOUS to .) | Corpus Christi District | 3 | USA Amtech, Inc. | $416,750 | $423,283 | +2.0% | 0.0% | TxDOT |
| A00212379 | BRIDGE DECK REPAIR, US0059 (Various Highways in Fort Bend County to Various Highways in Fort Bend County) | Houston District | 2 | Isi Contracting, Inc. | $409,700 | $541,000 | +32% | -5.0% | TxDOT |
| A00213391 | LIMESTONE ROCK ASPHALT, US0181 (VARIOUS to .) | Corpus Christi District | 2 | Martin Marietta Materials, Inc. | $330,690 | $336,240 | +2.0% | 0.0% | TxDOT |
| A00213175 | MOWING HIGHWAY RIGHT OF WAY, US0079 (Various to Various) | Bryan District | 4 | Aaba Mowing Contractors, Limited Liability Company | $292,187 | $298,758 | +2.0% | -18% | TxDOT |
| A00213122 | LIMESTONE ROCK ASPHALT, IH0037 (Various locations throughout Pleasanton to Maintenance Section) | San Antonio District | 3 | Vulcan Construction Materials, LLC | $283,760 | $301,290 | +6.0% | 0.0% | TxDOT |
| A00213395 | LIMESTONE ROCK ASPHALT, US0077 (VARIOUS to .) | Corpus Christi District | 3 | USA Amtech, Inc. | $279,530 | $297,898 | +7.0% | -5.0% | TxDOT |
| A00213123 | LIMESTONE ROCK ASPHALT, SH0016 (Various locations throughout Bandera to Maintenance Section) | San Antonio District | 4 | Vulcan Construction Materials, LLC | $276,288 | $285,768 | +3.0% | +2.0% | TxDOT |
| A00213119 | LIMESTONE ROCK ASPHALT, IH0010 (Various locations in East and West Bexar to Maintenance Sections) | San Antonio District | 4 | Vulcan Construction Materials, LLC | $271,723 | $278,250 | +2.0% | +1.0% | TxDOT |
| A00213120 | LIMESTONE ROCK ASPHALT, IH0010 (Various locations throughout Seguin to Maintenance Section) | San Antonio District | 4 | Vulcan Construction Materials, LLC | $265,150 | $280,650 | +6.0% | -3.0% | TxDOT |
| A00213124 | HOT MIX, US0090 (Various locations throughout Hondo to Maintenance Section) | San Antonio District | 6 | Lone Star Paving Company | $224,850 | $229,500 | +2.0% | -6.0% | TxDOT |
| A00213188 | EMULSION, SH0006 (Various to Various) | Bryan District | 3 | Martin Resource Management Corporation | $205,640 | $212,640 | +3.0% | -16% | TxDOT |
| A00213394 | AGGREGATE, SH0358 (VARIOUS to .) | Corpus Christi District | 5 | Vulcan Construction Materials, LLC | $191,270 | $200,000 | +5.0% | -1.0% | TxDOT |
| A00213402 | EMULSION, US0181 (VARIOUS to .) | Corpus Christi District | 1 | Ergon Asphalt & Emulsions, Inc. | $181,140 | +8.0% | TxDOT | ||
| A00212945 | EMULSION, BI0010G (VARIOUS to VARIOUS) | Odessa District | 3 | Wright Asphalt Products Company LLC | $124,200 | $149,000 | +20% | -21% | TxDOT |
| A00213125 | LIMESTONE ROCK ASPHALT, IH0035 (Various locations in New Braunfels to Maintenance Section) | San Antonio District | 3 | Vulcan Construction Materials, LLC | $107,960 | $111,960 | +4.0% | +3.0% | TxDOT |
| A00213121 | HOT-MIX COLD-LAID, IH0010 (Various locations in East and West Bexar to Maintenance Sections) | San Antonio District | 4 | Texas Materials Group, Inc. | $64,800 | $66,000 | +2.0% | -1.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.