DCC Construction and Services, L.L.C.: TxDOT bid record

DCC Construction and Services, L.L.C. submitted 27 bids on Texas DOT contracts in the data, from 10 AUG 2022 to 07 JUN 2024, and was the low bidder on 10 of them (37%). When it was not low, its total sat a median +24% above the low bid.

Owner
Texas DOT
Low bid volume
$14,342,850
Latest bid
07 JUN 2024
Data through
19 NOV 2026
27Bids
10Low bids
37Win rate, percent
+24%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
202211100%
2023200%
202424938%
DCC Construction and Services, L.L.C., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Paris District9556%
Lufkin District6233%
Amarillo District22100%
Austin District200%
Abilene District2150%
Laredo District100%
Wichita Falls District100%
Yoakum District100%
Bryan District100%
San Angelo District100%
Tyler District100%
DCC Construction and Services, L.L.C., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete structure repair (vertical & overhead)429-7007SF139 (69%)$175.00$220.00
Preparing row100-7002STA129 (75%)$1,000.00$2,750.00
Riprap (stone protection)(18 in)432-7043CY148 (57%)$200.00$200.00
Rock filter dams (remove)506-7011LF88 (100%)$1.00$12.00
Barricades, signs and traffic handling502-7001MO246 (25%)$3,250.00$5,000.00
Temporary sediment control fence (remove)506-7041LF116 (55%)$1.00$1.00
Cem stabil BKFL400-7010CY105 (50%)$212.50$200.00
Flowable backfill401-7001CY105 (50%)$300.00$350.00
Portable changeable message sign503-7002EACH93 (33%)$15,000$10,000
Removing concrete (riprap)104-7006SY83 (38%)$100.00$25.00
Furnishing and placing topsoil (4")160-6003SY63 (50%)$4.50$3.00
Cleaning and sealing existing joints(CL3)438-6002LF63 (50%)$37.50$47.00
DCC Construction and Services, L.L.C., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

DCC Construction and Services, L.L.C., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 JUN 202406241001Tyler DistrictFM1798 Bridge preventative maintenance from VARIOUS LOCATIONS to IN THE TYLER DISTRICT2 of 4$178,000+24%
06 JUN 202406243249Lufkin DistrictCR Bridge replacement from CR 2545 AT BAYOU SIEPE6 of 6$890,884+52%
05 JUN 202406243036San Angelo DistrictVA Bridge maintenance from VARIOUS ROADWAYS IN SJT DISTRICT3 of 6$591,000+31%
03 MAY 202405243221Lufkin DistrictCR Bridge replacement from CARMONA ROAD AT PINEY CREEK to AT PINEY CREEK.1 of 4$3,547,063Low, 16% under the second
03 MAY 202405243231Abilene DistrictVA Bridge maintenance from VARIOUS1 of 5$1,269,224Low, 15% under the second
02 MAY 202405243033Amarillo DistrictVA Bridge maintenance from DISTRICT WIDE1 of 5$1,283,633Low, 17% under the second
02 MAY 202405243037Paris DistrictSH 24 Bridge maintenance from NB AT DOCTOR'S CREEK1 of 6$1,224,153Low, 8.0% under the second
02 MAY 202405243040Paris DistrictFM 2653 Bridge maintenance from AT IH 303 of 5$1,342,575+35%
02 MAY 202405243041Lufkin DistrictCR Bridge replacement from HAMILTON ROAD AT TRIB OF JAMES CREE2 of 5$509,360+2.0%
05 APR 202404243234Paris DistrictVA Bridge maintenance from VARIOUS LOCATIONS1 of 4$1,799,705Low, 22% under the second
05 APR 202404243235Austin DistrictIH 35 Bridge maintenance from 200 FT N OF LAKE CREEK to 200 FT S OF LAKE CREEK3 of 5$270,601+15%
04 APR 202404243007Lufkin DistrictFM 3278 Bridge maintenance from AT TRINITY RIVER BRIDGE2 of 2$5,076,257+4.0%
04 APR 202404243028Paris DistrictVA Bridge maintenance from VARIOUS LOCATIONS1 of 5$865,586Low, 25% under the second
04 APR 202404243031Yoakum DistrictCR Bridge replacement from BARTON CREEK RD AT BARTONS CREEK to STR# AA01-95-0013 of 10$1,009,590+6.0%
04 APR 202404243035Bryan DistrictVA Bridge maintenance from VARIOUS LOCATIONS to IN ROBERTSON COUNTY2 of 3$392,496+10%
06 MAR 202403243224Wichita Falls DistrictVA Bridge maintenance from VARIOUS LOCATIONS to IN WICHITA AND CLAY COUNTIES3 of 6$1,271,275+9.0%
06 MAR 202403243225Abilene DistrictIH 20 Bridge maintenance from VARIOUS LOCATIONS3 of 7$893,315+59%
02 FEB 202402243236Paris DistrictSH 121 Bridge maintenance from AT US 69 to , ETC.1 of 5$2,050,081Low, 5.0% under the second
02 FEB 202402243238Paris DistrictBU 82-J Bridge maintenance from AT EAST LANGFORD CREEK to , ETC.4 of 8$692,718+10%
02 FEB 202402244217Paris DistrictSH0034 Bridge preventative maintenance from VARIOUS LOCATIONS IN to HUNT COUNTY1 of 8$416,470Low, 2.0% under the second
01 FEB 202402243034Paris DistrictCR Bridge replacement from AT ELBA CREEK to , ETC.3 of 7$1,679,381+6.0%
01 FEB 202402243043Austin DistrictCR Bridge replacement from ON CR 452 AT BRANCH OF MUSTANG CRK to STR# 14-246-0-AA04-13-0018 of 8$280,469+123%
01 FEB 202402244024Laredo DistrictUS0083 Bridge preventative maintenance from VARIOUS to VARIOUS2 of 5$1,270,060+38%
05 JAN 202401243233Amarillo DistrictUS 60 Bridge maintenance from DISTRICTWIDE1 of 1$1,635,105Low
06 DEC 202312233224Paris DistrictVA Preventive maintenance from VARIOUS LOCATIONS4 of 10$496,400+67%
DCC Construction and Services, L.L.C.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy