Lucania Contractors LLC: TxDOT bid record
Lucania Contractors LLC submitted 42 bids on Texas DOT contracts in the data, from 01 FEB 2024 to 04 NOV 2026, and was the low bidder on 10 of them (24%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,797,101
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 2 | 33% |
| 2025 | 15 | 3 | 20% |
| 2026 | 21 | 5 | 24% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Pharr District | 17 | 7 | 41% |
| Corpus Christi District | 10 | 1 | 10% |
| Laredo District | 9 | 2 | 22% |
| San Antonio District | 3 | 0 | 0% |
| Yoakum District | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 40 | 14 (35%) | $2,875.00 | $5,000.00 |
| Vegetative watering | 168-7001 | TGL | 16 | 12 (75%) | $12.50 | $37.73 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 13 | 9 (69%) | $500.00 | $643.00 |
| Excavation (roadway) | 110-7001 | CY | 19 | 5 (26%) | $20.00 | $20.00 |
| Cem stabil BKFL | 400-7010 | CY | 19 | 5 (26%) | $180.00 | $200.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 14 | 5 (36%) | $3,675.00 | $3,245.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 18 | 4 (22%) | $2.00 | $1.40 |
| Prime coat (MC-30) | 310-7004 | GAL | 13 | 4 (31%) | $10.00 | $6.42 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 9 | 4 (44%) | $2,350.00 | $2,140.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 23 | 3 (13%) | $2.00 | $1.00 |
| Preparing row | 100-7002 | STA | 17 | 3 (18%) | $3,000.00 | $2,750.00 |
| TMA (stationary) | 505-7001 | DAY | 13 | 3 (23%) | $300.00 | $230.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| STX Civil | 19 | 11 of 19 |
| E-Z Bel Construction, LLC | 10 | 7 of 10 |
| CK Newberry, LLC | 8 | 1 of 8 |
| Artillery L.L.C. | 8 | 2 of 8 |
| Foremost Paving, Inc. | 7 | 0 of 7 |
| SCR Civil Construction, LLC | 7 | 4 of 7 |
| Icos Management, LLC | 6 | 2 of 6 |
| Presidio Contracting, LLC | 6 | 5 of 6 |
| J. Carroll Weaver, Inc. | 6 | 2 of 6 |
| 3LW Civil LLC | 6 | 3 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00209149 | Laredo District | Bridge Replacement, MANGANA-HEIN RD (MANGANA HEIN RD to .) | 6 of 7 | $3,466,015 | +21% |
| 07 OCT 2026 | A00209154 | Laredo District | Bridge Replacement, BROWN RD (BROWN RD to .) | 2 of 6 | $594,689 | +23% |
| 06 OCT 2026 | A00220834 | Laredo District | BRIDGE PREVENTATIVE MAINTENANCE, IH0035 (Various to Various) | 4 of 8 | $1,650,880 | +33% |
| 02 SEP 2026 | A00221866 | Pharr District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2480 (FM2480 to Cameron County) | 2 of 2 | $1,394,642 | +3.0% |
| 06 AUG 2026 | A00192928 | Pharr District | Hazard Elimination & Safety, FM 1015 (Mile 12 N Rd. to Ida St.) | 4 of 4 | $841,633 | +27% |
| 06 AUG 2026 | A00136986 | San Antonio District | Bridge Replacement, IH 10 (At SH 80 to .) | 8 of 8 | $7,955,804 | +38% |
| 05 AUG 2026 | A00191479 | Pharr District | Landscape Development, BU 77X (E. Washington Ave. to E. Jefferson Ave.) | 1 of 6 | $240,952 | Low, 8.0% under the second |
| 05 AUG 2026 | A00198027 | Laredo District | Remove/Replace Bridge Rail, Various (DISTRICTWIDE to .) | 1 of 3 | $2,041,432 | Low, 4.0% under the second |
| 05 AUG 2026 | A00203563 | Pharr District | Hazard Elimination & Safety, E CANTON RD (Various Locations Within Hidalgo County to .) | 1 of 4 | $757,002 | Low |
| 02 JUL 2026 | A00183413 | Pharr District | Construct Pedestrian Infrastructure, Various (Various Locations Districtwide to .) | 7 of 8 | $2,429,029 | +25% |
| 25 JUN 2026 | A00218968 | Pharr District | BRIDGE PREVENTATIVE MAINTENANCE, IH0069E (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 3 of 3 | $811,735 | +11% |
| 25 JUN 2026 | A00218969 | Pharr District | BRIDGE PREVENTATIVE MAINTENANCE, BU0077X (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 1 of 3 | $277,220 | Low, 81% under the second |
| 03 JUN 2026 | A00206853 | Pharr District | Construct Pedestrian Infrastructure, W FREDDY GONZALEZ DR (On Freddy Gonzalez Dr, from 9th St Ave to Closner Blvd.) | 2 of 7 | $570,328 | +16% |
| 03 JUN 2026 | A00190949 | Corpus Christi District | Bridge Replacement, LAZY F (0.1 Mi S of FM 883 to FM 883) | 4 of 10 | $972,037 | +18% |
| 02 JUN 2026 | A00133020 | Laredo District | Rehabilitate Existing Roadway, FM 1472 (TRADE CENTER BLVD to 0.4 MILES NORTH OF TRADE CENTER BLVD) | 5 of 7 | $3,419,724 | +16% |
| 02 JUN 2026 | A00196825 | Corpus Christi District | Bridge Maintenance, Various (at Various Locations to in Goliad and Karnes Counties) | 13 of 14 | $286,115 | +61% |
| 07 MAY 2026 | A00185350 | Corpus Christi District | Construct Pedestrian Infrastructure, Various (Various Locations in Kingsville to .) | 3 of 8 | $1,271,429 | +9.0% |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 6 of 13 | $1,280,548 | +13% |
| 04 MAR 2026 | A00191889 | Pharr District | Bridge Replacement, CR 115 (On Browne Ave, 0.35 Mi N of SH 4 to STR# 210310AA0284001 @ Drainage Ditch) | 1 of 6 | $1,389,617 | Low, 5.0% under the second |
| 05 FEB 2026 | A00186405 | Corpus Christi District | Bridge Replacement, US 181 (0.6 MI S of CR 1206 to 0.9 MI S of CR 1206) | 8 of 12 | $2,248,903 | +24% |
| 07 JAN 2026 | A00207865 | Corpus Christi District | Construct Pedestrian Infrastructure, SH 286 (Horne Rd to Baldwin Blvd) | 4 of 5 | $1,132,231 | +25% |
| 04 DEC 2025 | A00218471 | Pharr District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM 106 (FM106 to San Ramon Rd) | 1 of 6 | $383,573 | Low, 47% under the second |
| 03 DEC 2025 | A00130820 | Yoakum District | Bridge Replacement, FM 239 (AT DRAW & AT DRAW to STR# 0943-02-005 & -004) | 8 of 8 | $1,414,658 | +60% |
| 02 DEC 2025 | A00128664 | Yoakum District | Bridge Replacement, FM 1300 (AT GOLDENROD CREEK to STR # 0420-10-010) | 6 of 10 | $2,897,662 | +9.0% |
| 10 NOV 2025 | A00216832 | Corpus Christi District | BRIDGE PREVENTATIVE MAINTENANCE, US0077 (VARIOUS to .) | 8 of 8 | $1,135,284 | +199% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.