Artillery L.L.C.: TxDOT bid record

Artillery L.L.C. submitted 15 bids on Texas DOT contracts in the data, from 05 MAR 2025 to 06 AUG 2026, and was the low bidder on 1 of them (7%). When it was not low, its total sat a median +31% above the low bid.

Owner
Texas DOT
Low bid volume
$662,209
Latest bid
06 AUG 2026
Data through
19 NOV 2026
15Bids
1Low bids
7Win rate, percent
+31%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20251100%
20264125%
Artillery L.L.C., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Pharr District1119%
Corpus Christi District200%
Paris District100%
Houston District100%
Artillery L.L.C., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marking type I (W)24"(solid)(100MIL)666-7036LF92 (22%)$11.00$8.00
Concrete sidewalks (4")531-7001SY82 (25%)$76.50$80.00
Preparing row100-7002STA62 (33%)$1,250.00$2,750.00
Barricades, signs and traffic handling502-7001MO151 (7%)$5,000.00$5,000.00
Biodegradable erosion control logs (remove)506-7046LF131 (8%)$3.00$1.40
Driveways (concrete)530-7006SY101 (10%)$108.00$110.00
Biodegradable erosion control logs (install) (12")506-7044LF81 (13%)$10.00$6.00
Temporary sediment control fence (install)506-7039LF61 (17%)$9.00$4.00
Furn & place topsoil (4")160-7002SY61 (17%)$7.00$3.66
Curb ramps (type 1)531-7005EACH51 (20%)$3,000.00$2,500.00
Curb ramps (type 7)531-7010EACH51 (20%)$3,000.00$2,500.00
Artillery L.L.C., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Artillery L.L.C., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00192928Pharr DistrictHazard Elimination & Safety, FM 1015 (Mile 12 N Rd. to Ida St.)1 of 4$662,209Low, 3.0% under the second
02 JUL 2026A00183413Pharr DistrictConstruct Pedestrian Infrastructure, Various (Various Locations Districtwide to .)3 of 8$2,197,522+13%
03 JUN 2026A00206853Pharr DistrictConstruct Pedestrian Infrastructure, W FREDDY GONZALEZ DR (On Freddy Gonzalez Dr, from 9th St Ave to Closner Blvd.)7 of 7$777,697+58%
07 MAY 2026A00185350Corpus Christi DistrictConstruct Pedestrian Infrastructure, Various (Various Locations in Kingsville to .)7 of 8$1,840,850+57%
04 DEC 2025A00218471Pharr DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, FM 106 (FM106 to San Ramon Rd)6 of 6$650,732+70%
04 SEP 2025A00192921Pharr DistrictHazard Elimination & Safety, US 83 (0.3 Miles East of Vanderpool Rd. to Tabasco Rd.)5 of 9$875,550+19%
04 SEP 2025A00151488Pharr DistrictBRIDGE PREVENTATIVE MAINTENANCE, BU0077X (VARIOUS ROADWAYS to Cameron and Willacy County)5 of 5$839,315+72%
08 AUG 2025A00184386Pharr DistrictHazard Elimination & Safety, ODOMS LN (On Odoms Rd., From Baker Potts Rd. to 0.18 Miles East of Altas Palmas Rd.)4 of 6$1,697,893+74%
07 AUG 2025A00199485Pharr DistrictBicycle And Pedestrian Improvements, STENGER ST (Business 77 West to Fannin St.)4 of 8$1,949,780+20%
07 AUG 2025A00206379Paris DistrictConstruct Pedestrian Infrastructure, Various (Various to .)11 of 12$757,478+57%
02 JUL 2025A00209531Pharr DistrictBridge Maintenance, SH 107 (SH 107 @ Drain to 0.25 MI E OF FM 2061NBI# 211090052801003)2 of 3$1,131,092+3.0%
01 JUL 2025A00183318Houston DistrictBicycle And Pedestrian Improvements, Various (On Taylor St and Waller-Tomball Rd to From Farr St to FM 2920)6 of 8$1,316,025+39%
04 APR 2025A00183412Pharr DistrictConstruct Pedestrian Infrastructure, US 83 (Roma High School to Gutierrez St.)2 of 6$1,478,530+1.0%
03 APR 2025A00198202Corpus Christi DistrictConstruct Pedestrian Infrastructure, Various (AT VARIOUS LOCATIONS to -)4 of 6$2,035,792+12%
05 MAR 2025A00213980Pharr DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, FM0907 (Durante Ave to Intersection of IH 2 Frontage)5 of 7$1,457,041+23%
Artillery L.L.C.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy