TxDOT contract A00183412 bid tabulation

Construct Pedestrian Infrastructure, US 83 (Roma High School to Gutierrez St.). Let by Texas DOT on April 4, 2025, Starr, Pharr District. 6 bids received; low bid $1,458,980 by Reim Construction, Inc., -12% against the engineer's estimate of $1,661,328.

Owner
Texas DOT
Letting
04 APR 2025
Pay items
84
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Reim Construction, Inc.$1,458,980Low-12%
2Artillery L.L.C.$1,478,530+1.0%-11%
3STX Civil$1,496,861+3.0%-10%
43LW Civil LLC$1,581,915+8.0%-5.0%
5Ti-Zack Concrete, LLC$1,921,151+32%+16%
6Icos Management, LLC$2,403,352+65%+45%
TxDOT contract A00183412: bids by rank

Engineer's estimate: $1,661,328.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Reim Construction, Inc.2. Artillery L.L.C.3. STX Civil4. 3LW Civil LLC5. Ti-Zack Concrete, LLC6. Icos Management, LLC
1Preparing row (100-7001)ACRE1$10,000$3,500.00$10,000$10,000$31,462$11,500$11,000
2Removing concrete (riprap) (104-7006)SY468$35.00$29.75$36.00$25.00$30.28$20.46$44.00
3Removing concrete (driveways) (104-7011)SY453$20.00$19.50$36.00$25.00$47.19$28.19$66.00
4Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY105$30.00$14.50$27.00$20.00$53.08$30.40$55.00
5Removing concrete (curb or curb & gutter) (104-7018)LF909$15.00$27.75$8.00$10.00$8.35$17.56$22.00
6Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052)SY885$18.00$6.60$15.00$15.00$50.00$18.03$66.00
7Embankment (final)(OC)(type A) (132-7001)CY13$100.00$83.50$100.00$35.00$50.27$50.80$110.00
8Furn & place topsoil (4") (160-7002)SY6,189$5.00$5.90$5.00$1.50$4.25$2.45$5.00
9Block sodding (162-7002)SY6,189$10.00$12.00$6.00$4.00$0.10$4.89$5.00
10Vegetative watering (168-7001)TGL105.40$50.00$41.50$40.00$10.00$0.10$1.15$1.00
11Class C concrete (collar) (420-7061)EACH11$2,200.00$814.00$500.00$1,200.00$870.49$2,990.22$2,200.00
12Class C concrete (miscellaneous) (420-7067)CY13.10$1,000.00$844.00$700.00$850.00$849.39$934.84$880.00
13Riprap (concrete)(6 in) (432-7003)CY68.60$500.00$487.00$650.00$580.00$529.21$934.84$660.00
14Rail (handrail)(type B) (450-7059)LF231$185.00$129.00$150.00$150.00$135.60$172.50$165.00
15Concrete box culvert (3 FT X 2 FT)(extend) (462-7056)LF13$400.00$436.00$900.00$800.00$498.36$959.56$1,100.00
16RC pipe (CL III)(18 in) (464-7003)LF270$100.00$85.00$100.00$125.00$110.69$239.05$242.00
17Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070)EACH1$7,500.00$3,890.00$6,000.00$5,000.00$6,560.74$13,690$7,700.00
18Inlet (complete)(PSL)(RC)(5FTX5FT) (465-7074)EACH2$10,000$5,930.00$8,000.00$9,000.00$8,959.90$14,946$16,500
19Inlet (complete)(pazd)(RC)(5FTX5FT) (465-7154)EACH5$10,000$6,640.00$8,000.00$8,500.00$9,218.26$14,950$15,400
20Grate & frame (471-7003)EACH52$2,000.00$1,540.00$1,700.00$1,000.00$2,278.40$1,937.35$2,200.00
21Adjusting manholes (479-7001)EACH1$2,000.00$889.00$500.00$1,000.00$720.67$319.20$2,200.00
22Adjusting manholes (utility box) (479-7004)EACH6$1,500.00$604.00$500.00$250.00$261.94$266.00$1,100.00
23Removing structure (inlet) (496-7002)EACH6$1,250.00$489.00$500.00$550.00$823.07$2,017.97$1,650.00
24Removing structure (pipe) (496-7007)LF233$20.00$28.00$20.00$20.00$69.84$52.49$17.00
25Mobilization (500-7001)LS1$146,360$115,000$100,000$115,000$130,004$196,200$55,000
26Barricades, signs and traffic handling (502-7001)MO6$5,000.00$2,000.00$4,000.00$2,500.00$22,217$5,175.00$1.00
27Portable changeable message sign (503-7002)EACH2$11,000$9,990.00$12,000$7,000.00$7,854.93$1.15$5,500.00
28TMA (stationary) (505-7001)DAY116$200.00$66.50$300.00$5.00$1.00$1.15$1.00
29TMA (mobile operation) (505-7003)DAY2$250.00$666.00$500.00$10.00$0.10$1.15$550.00
30Sandbags for erosion control (506-7035)EACH97$9.00$4.20$20.00$1.00$0.10$1.15$1.00
31Biodegradable erosion control logs (install) (6") (506-7042)LF343$6.00$3.25$5.00$4.00$0.10$1.15$10.00
32Biodegradable erosion control logs (install) (12") (506-7044)LF4,698$7.00$4.50$5.00$4.00$0.10$0.12$1.00
33Biodegradable erosion control logs (remove) (506-7046)LF5,041$2.00$1.00$2.00$1.00$0.10$0.12$1.00
34Concrete curb (type II) (529-7002)LF464$30.00$25.50$20.00$35.00$41.30$55.48$88.00
35Concrete curb & gutter (type I) (529-7008)LF19$30.00$37.25$40.00$40.00$44.19$55.48$165.00
36Concrete curb & gutter (type II) (529-7009)LF1,076$40.00$25.75$35.00$45.00$25.37$55.48$88.00
37Concrete curb (slotted) (529-7013)LF31$40.00$51.50$100.00$60.00$31.45$55.48$132.00
38Concrete curb & gutter (armor curb) (529-7018)LF98$275.00$349.00$300.00$100.00$315.03$271.25$220.00
39Driveways (concrete) (530-7006)SY1,240$90.00$78.00$90.00$110.00$88.03$135.79$154.00
40Concrete sidewalks (4") (531-7001)SY3,898$80.00$54.00$72.00$95.00$57.94$107.45$88.00
41Concrete sidewalks (6") (531-7003)SY100$100.00$63.50$90.00$120.00$79.57$161.74$110.00
42Curb ramps (type 1) (531-7015)SY64$165.00$317.00$150.00$160.00$132.82$161.74$1,320.00
43Curb ramps (type 3) (531-7017)SY161$165.00$471.00$150.00$160.00$153.61$161.74$1,320.00
44Curb ramps (type 6) (531-7019)SY29$165.00$321.00$150.00$190.00$270.55$161.74$1,980.00
45Curb ramps (type 7) (531-7020)SY48$165.00$190.00$150.00$200.00$183.85$161.74$1,980.00
46Curb ramps (type 10) (531-7021)SY139$165.00$263.00$150.00$150.00$148.61$161.74$1,320.00
47Curb ramps (type 21) (531-7023)SY16$165.00$225.00$150.00$200.00$159.51$161.74$1,320.00
48Concrete sidewalks (special) (531-7025)SY544$225.00$221.00$170.00$200.00$269.46$311.61$132.00
49Chain link fence (install) (6') (550-7001)LF17$50.00$69.00$150.00$50.00$74.40$115.00$220.00
50Gate (type 1) (552-7006)EACH2$5,000.00$1,240.00$1,000.00$2,500.00$1,338.00$632.50$2,200.00
51Gate (type 2) (552-7007)EACH3$10,000$1,280.00$1,000.00$3,000.00$1,374.00$862.50$2,200.00
52Conduit (PVC) (schedule 40) (4") (618-7040)LF200$21.00$40.25$40.00$39.75$32.83$41.40$55.00
53Electrical conductor (no.6) bare (620-7009)LF285$3.00$2.20$2.00$2.15$2.69$2.24$50.00
54Ground box type A (122311)W/apron (624-7002)EACH3$1,300.00$1,340.00$1,200.00$1,324.84$1,022.78$1,380.00$1,650.00
55Ground box type D (162922) (624-7007)EACH6$1,100.00$1,470.00$1,350.00$1,451.81$1,026.78$1,512.25$1,870.00
56Ground box type D (162922)W/apron (624-7008)EACH1$1,300.00$1,470.00$1,350.00$1,451.80$1,537.17$1,512.25$2,750.00
57Remove ground box (624-7013)EACH7$200.00$391.00$350.00$386.41$292.13$402.50$550.00
58Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH13$800.00$742.00$1,000.00$85.00$714.73$747.50$220.00
59Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH1$1,000.00$932.00$1,000.00$835.00$931.37$747.50$1,650.00
60Relocate SM RD SN sup&AM type S80 (644-7067)EACH10$650.00$243.00$300.00$775.00$784.44$632.50$1,650.00
61Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF192$1.00$11.25$12.00$11.04$12.00$2.30$4.00
62Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,884$4.00$10.00$10.00$9.94$10.80$12.42$4.00
63Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF145$1.00$112.00$105.00$110.40$120.00$1.84$4.00
64Pavement sler 6" (666-7347)LF145$1.00$1.65$2.00$1.66$1.80$0.69$5.00
65Pavement sler 8" (666-7348)LF192$1.00$2.25$2.50$2.21$2.40$1.38$5.00
66Pavement sler 24" (666-7352)LF1,884$5.00$3.30$3.50$3.31$3.60$2.30$5.00
67Pavement sler (arrow) (666-7353)EACH4$50.00$56.00$75.00$55.20$60.00$46.00$1,100.00
68Pavement sler (word) (666-7354)EACH5$50.00$83.50$100.00$82.80$90.00$46.00$1,100.00
69Prefabricated PM type B (W)(arrow) (668-7023)EACH4$400.00$1,670.00$1,500.00$1,656.05$1,800.00$322.00$1,100.00
70Prefabricated PM type B (W)(word) (668-7031)EACH5$400.00$2,230.00$2,000.00$2,208.07$2,400.00$322.00$1,100.00
71Reflectorized pavement marker type I-C (672-7002)EACH11$10.00$56.00$50.00$55.20$60.00$7.82$550.00
72Eliminating existing PM & markers (4") (677-7001)LF176$1.00$2.80$4.00$2.76$3.00$1.84$2.00
73Eliminating existing PM & markers (8") (677-7004)LF185$2.00$5.60$5.00$5.52$6.00$2.30$2.00
74Eliminating existing PM & markers (12") (677-7006)LF249$2.00$8.35$9.00$8.28$9.00$4.60$2.00
75Eliminating existing PM & markers (24") (677-7008)LF269$5.00$11.25$9.00$11.04$12.00$9.20$2.00
76Eliminating existing PM & markers (arrow) (677-7009)EACH4$100.00$112.00$100.00$110.40$120.00$92.00$220.00
77Pedestrian signal section (LED)(2 indications) (682-7017)EACH8$800.00$1,010.00$1,000.00$999.15$645.61$1,040.75$1,100.00
78Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF1,670$2.50$2.60$3.00$2.59$3.39$2.70$4.00
79Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010)LF1,710$3.00$2.95$3.00$2.93$4.09$3.05$4.00
80Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080)LF2,780$2.00$2.60$3.00$2.59$2.04$2.70$4.00
81Pedestrian pole assembly (687-7001)EACH8$2,500.00$3,750.00$3,500.00$3,709.56$1,860.07$3,864.00$5,500.00
82Pedestrian detect push button (APS) (688-7001)EACH8$1,500.00$1,040.00$1,000.00$1,032.27$783.61$10.93$1,650.00
83Removal of signal head assembly (690-7024)EACH8$200.00$123.00$170.00$121.44$255.61$126.50$220.00
84Removal of pedestrian push buttons (690-7030)EACH8$150.00$33.50$60.00$33.12$255.61$34.50$55.00
TxDOT contract A00183412: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy