TxDOT contract A00183318 bid tabulation

Bicycle And Pedestrian Improvements, Various (On Taylor St and Waller-Tomball Rd to From Farr St to FM 2920). Let by Texas DOT on July 1, 2025, Harris, Houston District. 8 bids received; low bid $948,028 by Highway 19 Construction LLC, -18% against the engineer's estimate of $1,157,880.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
55
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Highway 19 Construction LLC$948,028Low-18%
2MBN Enterprises LLC$949,5450.0%-18%
3STX Civil$1,056,364+11%-9.0%
4Ti-Zack Concrete, LLC$1,096,134+16%-5.0%
5Brice Highway LLC$1,124,883+19%-3.0%
6Artillery L.L.C.$1,316,025+39%+14%
7Grey Sky Construction LLC$1,426,496+50%+23%
8Ragle Construction, Inc.$1,431,102+51%+24%
TxDOT contract A00183318: bids by rank

Engineer's estimate: $1,157,880.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Highway 19 Construction LLC2. MBN Enterprises LLC3. STX Civil4. Ti-Zack Concrete, LLC5. Brice Highway LLC6. Artillery L.L.C.
1Preparing row (100-7002)STA3$5,250.00$5,000.00$4,500.00$3,000.00$1,100.00$28,150$7,500.00
2Preparation row (tree remove) (0"-12" diameter) (100-7003)EACH29$455.00$1,000.00$1,400.00$150.00$770.00$550.00$1,500.00
3Tree protection (install) (100-7013)EACH39$500.55$500.00$410.00$1.00$1.10$495.00$750.00
4Removing concrete (riprap) (104-7006)SY25$23.00$25.00$25.00$20.00$31.92$63.28$30.00
5Removing concrete (driveways) (104-7011)SY176$51.68$25.00$25.00$20.00$45.34$54.79$30.00
6Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY18$22.00$35.00$40.00$20.00$44.33$87.03$30.00
7Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY333$9.00$15.00$20.00$6.00$23.96$10.00$10.00
8Excavation (channel) (110-7002)CY408$47.44$25.00$24.00$30.00$44.71$44.97$25.00
9Embankment (final)(DC)(type C) (132-7006)CY200$51.40$100.00$30.00$45.00$60.90$59.99$30.00
10Erosion control compost (vehicle) (161-7008)CY50$30.02$50.00$75.00$35.00$1.10$75.00$100.00
11Block sodding (162-7002)SY3,100$5.86$8.00$10.00$20.00$5.50$4.90$10.00
12Fertilizer (166-7001)ACRE0.65$1,359.49$150.00$1,800.00$15,000$1.10$2,000.00$1,000.00
13Vegetative watering (168-7001)TGL121$95.23$60.00$80.00$50.00$1.10$71.85$40.00
14FL BS (compacted in place)(type A GR 1-2) (8") (247-7067)SY224$17.75$75.00$46.00$40.00$69.09$70.00$70.00
15D-GR HMA type D PG64-22 (341-7043)TON95$564.90$350.00$190.00$350.00$275.00$300.00$250.00
16Class C concrete (collar) (420-7061)EACH4$922.50$1,500.00$1,000.00$1,000.00$1,844.70$2,500.00$3,000.00
17RC pipe (CL IV)(18 in) (464-7019)LF811$128.82$106.00$104.00$150.00$153.78$150.00$140.00
18RC pipe (CL IV)(24 in) (464-7021)LF43$105.00$135.00$110.00$210.00$329.97$240.00$170.00
19Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH1$5,731.67$7,500.00$7,000.00$9,000.00$4,507.80$4,500.00$6,000.00
20Inlet (complete)(type A)(hou) (465-7313)EACH3$8,138.50$7,500.00$7,000.00$8,000.00$5,127.10$5,000.00$7,000.00
21Inlet (complete)(type AZ)(hou) (465-7316)EACH2$8,138.50$7,500.00$7,000.00$10,000$4,767.40$8,000.00$6,000.00
22Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH2$32,450$21,000$15,000$30,000$29,979$13,000$6,000.00
23Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH34$1,623.67$1,200.00$2,000.00$1,800.00$1,560.90$2,000.00$2,500.00
24Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$2,600.00$2,000.00$2,750.00$2,100.00$2,310.00$3,000.00$3,500.00
25Adjusting manholes (479-7001)EACH1$1,676.78$500.00$2,500.00$2,000.00$1,596.00$1,860.36$2,000.00
26Removing structure (inlet) (496-7002)EACH3$330.00$1,000.00$1,000.00$100.00$854.70$834.18$2,000.00
27Removing structure (pipe) (496-7007)LF671$43.18$50.00$15.00$10.00$46.46$45.47$25.00
28Mobilization (500-7001)LS1$93,737$150,000$90,000$96,000$83,970$110,000$250,000
29Barricades, signs and traffic handling (502-7001)MO9$6,260.71$5,000.00$6,000.00$3,000.00$9,350.00$2,581.11$10,000
30Construction exits (install) (type 1) (506-7020)SY440$29.33$25.00$20.00$40.00$0.11$22.00$20.00
31Construction exits (remove) (506-7024)SY440$15.00$10.00$6.00$5.00$0.11$10.00$10.00
32Temporary sediment control fence (install) (506-7039)LF2,078$5.75$4.00$4.50$5.00$0.11$2.25$7.00
33Temporary sediment control fence (remove) (506-7041)LF2,078$1.53$1.00$2.00$2.00$0.11$0.50$2.00
34Biodegradable erosion control logs (install) (12") (506-7044)LF164$6.92$5.00$12.00$10.00$0.11$8.00$11.00
35Biodegradable erosion control logs (remove) (506-7046)LF164$1.37$1.00$2.00$1.00$0.11$2.00$5.00
36Driveways (concrete) (530-7006)SY427$171.13$110.00$100.00$130.00$138.87$180.00$126.00
37Driveways (ACP) (530-7010)SY552$34.31$85.00$100.00$90.00$93.50$85.00$110.00
38Concrete sidewalks (6") (531-7003)SY1,787$173.00$75.00$100.00$115.00$161.82$125.00$126.00
39Curb ramps (type 1) (531-7005)EACH9$3,200.00$1,500.00$2,000.00$3,000.00$2,234.52$3,405.19$4,000.00
40Metal W-beam guard fence (timber post) (540-7001)LF100$30.01$27.00$40.00$35.00$29.70$35.00$35.00
41Downstream anchor terminal section (540-7015)EACH1$1,555.15$1,250.00$1,800.00$1,900.00$1,375.00$1,850.00$1,500.00
42TL-3 31" short radius (transition) (540-7035)EACH1$5,798.25$1,085.00$4,000.00$23,000$1,193.50$1,500.00$1,500.00
43Remove metal beam guard fence (542-7001)LF60$8.84$3.00$15.00$2.00$3.30$5.00$15.00
44Remove terminal anchor section (542-7002)EACH1$194.00$220.00$400.00$500.00$242.00$500.00$500.00
45Remove downstream anchor terminal (542-7003)EACH1$273.00$230.00$400.00$500.00$253.00$150.00$500.00
46Guardrail end treatment (install) (544-7001)EACH1$3,256.63$3,050.00$5,000.00$3,800.00$3,355.00$3,850.00$4,000.00
47Mailbox install-S (TWW-post) type 4 (560-7008)EACH4$275.00$315.00$400.00$500.00$346.50$415.00$750.00
48Mailbox install-D (TWW-post) type 4 (560-7009)EACH3$284.61$355.00$450.00$500.00$390.50$465.00$750.00
49Mailbox install-M (TWW-post) type 4 (560-7010)EACH6$350.00$385.00$850.00$500.00$973.50$825.00$1,250.00
50Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH6$565.00$850.00$650.00$700.00$918.50$625.00$1,250.00
51Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH9$563.07$350.00$600.00$400.00$819.50$495.00$1,000.00
52Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF228$8.28$10.00$18.00$25.00$22.11$20.10$25.00
53Pavement sler 24" (666-7352)LF228$1.71$5.00$3.00$1.00$0.79$0.75$1.50
54Pavement surface preparation for marking (24") (678-7008)LF228$0.68$5.00$3.00$0.50$0.26$0.25$1.00
55Remove and relocate meters and boxes (7004-7055)EACH6$2,560.00$500.00$3,000.00$3,500.00$1,650.00$1,352.80$2,500.00
TxDOT contract A00183318: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy