Brice Highway LLC: TxDOT bid record

Brice Highway LLC submitted 10 bids on Texas DOT contracts in the data, from 06 NOV 2024 to 01 JUL 2025, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +30% above the low bid.

Owner
Texas DOT
Low bid volume
$5,682,863
Latest bid
01 JUL 2025
Data through
19 NOV 2026
10Bids
1Low bids
10Win rate, percent
+30%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
2024200%
20258113%
Brice Highway LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District400%
Beaumont District2150%
Yoakum District200%
Lufkin District100%
San Antonio District100%
Brice Highway LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF84 (50%)$0.78$1.00
Temporary sediment control fence (install)506-7039LF83 (38%)$3.00$4.00
Metal W-beam guard fence (timber post)540-7001LF63 (50%)$28.23$27.00
Block sodding162-7002SY63 (50%)$5.38$6.20
Vegetative watering168-7001TGL92 (22%)$50.14$37.73
Biodegradable erosion control logs (remove)506-7046LF62 (33%)$2.00$1.40
Barricades, signs and traffic handling502-7001MO101 (10%)$8,060.64$5,000.00
Excavation (roadway)110-7001CY71 (14%)$27.01$20.00
Remove metal beam guard fence542-7001LF71 (14%)$3.50$3.00
Biodegradable erosion control logs (install) (12")506-7044LF51 (20%)$8.00$6.00
Metal beam guard fence trans (thrie-beam)540-7005EACH51 (20%)$2,185.00$2,140.00
Guardrail end treatment (remove)544-7003EACH51 (20%)$300.00$275.00
Brice Highway LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Brice Highway LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 JUL 2025A00183318Houston DistrictBicycle And Pedestrian Improvements, Various (On Taylor St and Waller-Tomball Rd to From Farr St to FM 2920)5 of 8$1,124,883+19%
01 JUL 2025A00194291Yoakum DistrictBridge Replacement, COUNTY ROAD 267 (At Draw to STR# AA03-06-002)7 of 7$3,615,073+30%
05 JUN 2025A00190138Beaumont DistrictBridge Replacement, COUNTY ROAD 2307 (@ GAYLOR CREEK to EXISTING STR#(201460AA0454002))1 of 3$5,682,863Low, 0.0% under the second
01 MAY 2025A00061563Lufkin DistrictBridge Replacement, SH 7 (AT MORRAL CREEK to .)8 of 8$9,773,672+57%
04 APR 2025A00131128Houston DistrictInstall/Upgrade Drainage Structure(S), FM 1097 (At Atkins Creek to .)3 of 8$3,694,692+6.0%
04 APR 2025A00198507Houston DistrictRehabilitate Bridge, IH 45 (At Spring Creek to .)6 of 6$1,985,400+106%
05 MAR 2025A00183345San Antonio DistrictConstruct Pedestrian Infrastructure, IH 410 (Callaghan Rd. to Pin Oak Dr.)6 of 6$4,404,057+53%
04 MAR 2025A00194210Yoakum DistrictBridge Replacement, COUNTY ROAD 404 (At Mud Creek to STR# AA04-18-001)9 of 9$4,862,850+57%
03 DEC 2024A00140315Houston DistrictIntersection Improvement, IH 610 (Market St. to 0.25 Mi W. of Mercury Dr.)4 of 11$4,408,972+12%
06 NOV 2024A00132358Beaumont DistrictConstruct Bridge, US 90 (AT UP RAILROAD to .)6 of 7$32,128,832+18%
Brice Highway LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.