Brice Highway LLC: TxDOT bid record
Brice Highway LLC submitted 10 bids on Texas DOT contracts in the data, from 06 NOV 2024 to 01 JUL 2025, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $5,682,863
- Latest bid
- 01 JUL 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 2 | 0 | 0% |
| 2025 | 8 | 1 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 4 | 0 | 0% |
| Beaumont District | 2 | 1 | 50% |
| Yoakum District | 2 | 0 | 0% |
| Lufkin District | 1 | 0 | 0% |
| San Antonio District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 8 | 4 (50%) | $0.78 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 8 | 3 (38%) | $3.00 | $4.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 6 | 3 (50%) | $28.23 | $27.00 |
| Block sodding | 162-7002 | SY | 6 | 3 (50%) | $5.38 | $6.20 |
| Vegetative watering | 168-7001 | TGL | 9 | 2 (22%) | $50.14 | $37.73 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 6 | 2 (33%) | $2.00 | $1.40 |
| Barricades, signs and traffic handling | 502-7001 | MO | 10 | 1 (10%) | $8,060.64 | $5,000.00 |
| Excavation (roadway) | 110-7001 | CY | 7 | 1 (14%) | $27.01 | $20.00 |
| Remove metal beam guard fence | 542-7001 | LF | 7 | 1 (14%) | $3.50 | $3.00 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 5 | 1 (20%) | $8.00 | $6.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 5 | 1 (20%) | $2,185.00 | $2,140.00 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 5 | 1 (20%) | $300.00 | $275.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ser Construction Partners, LLC | 3 | 3 of 3 |
| MC2 Civil, LLC | 3 | 3 of 3 |
| Isi Contracting, Inc. | 3 | 2 of 3 |
| R Construction Civil, LLC | 3 | 2 of 3 |
| Ragle Construction, Inc. | 3 | 0 of 3 |
| Forde Construction Company, Inc. | 3 | 0 of 3 |
| Texas Materials Group, Inc. | 3 | 0 of 3 |
| STX Civil | 3 | 3 of 3 |
| E-Z Bel Construction, LLC | 3 | 3 of 3 |
| Roman Emperors Road, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 JUL 2025 | A00183318 | Houston District | Bicycle And Pedestrian Improvements, Various (On Taylor St and Waller-Tomball Rd to From Farr St to FM 2920) | 5 of 8 | $1,124,883 | +19% |
| 01 JUL 2025 | A00194291 | Yoakum District | Bridge Replacement, COUNTY ROAD 267 (At Draw to STR# AA03-06-002) | 7 of 7 | $3,615,073 | +30% |
| 05 JUN 2025 | A00190138 | Beaumont District | Bridge Replacement, COUNTY ROAD 2307 (@ GAYLOR CREEK to EXISTING STR#(201460AA0454002)) | 1 of 3 | $5,682,863 | Low, 0.0% under the second |
| 01 MAY 2025 | A00061563 | Lufkin District | Bridge Replacement, SH 7 (AT MORRAL CREEK to .) | 8 of 8 | $9,773,672 | +57% |
| 04 APR 2025 | A00131128 | Houston District | Install/Upgrade Drainage Structure(S), FM 1097 (At Atkins Creek to .) | 3 of 8 | $3,694,692 | +6.0% |
| 04 APR 2025 | A00198507 | Houston District | Rehabilitate Bridge, IH 45 (At Spring Creek to .) | 6 of 6 | $1,985,400 | +106% |
| 05 MAR 2025 | A00183345 | San Antonio District | Construct Pedestrian Infrastructure, IH 410 (Callaghan Rd. to Pin Oak Dr.) | 6 of 6 | $4,404,057 | +53% |
| 04 MAR 2025 | A00194210 | Yoakum District | Bridge Replacement, COUNTY ROAD 404 (At Mud Creek to STR# AA04-18-001) | 9 of 9 | $4,862,850 | +57% |
| 03 DEC 2024 | A00140315 | Houston District | Intersection Improvement, IH 610 (Market St. to 0.25 Mi W. of Mercury Dr.) | 4 of 11 | $4,408,972 | +12% |
| 06 NOV 2024 | A00132358 | Beaumont District | Construct Bridge, US 90 (AT UP RAILROAD to .) | 6 of 7 | $32,128,832 | +18% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.