| 1 | Preparing row (100-7002) | STA | 17.43 | $10,000 | $21,000 | $10,000 | $29,364 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 302 | | $20.75 | $34.00 | $32.40 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 92 | | $33.22 | $104.00 | $21.60 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 60 | | $49.99 | $79.00 | $32.40 |
| 5 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 252 | | $24.94 | $41.00 | $64.80 |
| 6 | Removing concrete (curb ramp) (104-7015) | SY | 71 | | $22.33 | $65.00 | $64.80 |
| 7 | Removing concrete (inter art concrete blocks) (104-7044) | SY | 107 | | $28.92 | $135.00 | $263.12 |
| 8 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 7,810 | | $0.96 | $10.00 | $2.05 |
| 9 | Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010) | SY | 374 | $8.00 | $8.78 | $34.00 | $43.64 |
| 10 | Remove (9") TRT/untrt base & asphalt pavement (105-7029) | SY | 3,476 | | $6.01 | $25.00 | $13.80 |
| 11 | Excavation (roadway) (110-7001) | CY | 940.74 | $30.00 | $19.24 | $39.00 | $103.58 |
| 12 | Embankment (final)(DC)(type C) (132-7006) | CY | 2,366.64 | $35.00 | $34.91 | $53.00 | $95.76 |
| 13 | Furn & place topsoil (6") (160-7004) | SY | 50 | | $25.00 | $36.00 | $103.06 |
| 14 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 8,904 | $2.50 | $0.18 | $0.75 | $0.13 |
| 15 | Broadcast seed (temporary_warm) (164-7005) | SY | 4,327 | $2.00 | $0.18 | $0.75 | $0.26 |
| 16 | Broadcast seed (temporary_cool) (164-7006) | SY | 4,327 | $2.00 | $0.21 | $0.75 | $3.23 |
| 17 | Vegetative watering (168-7001) | TGL | 137.71 | $60.00 | $42.64 | $132.00 | $66.36 |
| 18 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 995 | $200.00 | $158.12 | $152.00 | $169.45 |
| 19 | CM TRT(PT MX)(CL M)(tya)(GR1-2)(FN pos) (276-7077) | CY | 624 | | $140.78 | $155.00 | $194.37 |
| 20 | Prime coat (AE-P) (310-7001) | GAL | 1,864 | $7.00 | $5.25 | $4.50 | $7.99 |
| 21 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 616 | | $146.00 | $175.00 | $197.69 |
| 22 | D-GR HMA type D PG 64-22 (exempt) (341-7064) | TON | 590 | $130.00 | $163.00 | $178.00 | $232.95 |
| 23 | Tack coat (341-7082) | GAL | 981 | $10.00 | $4.75 | $4.50 | $37.32 |
| 24 | Struct excavation (pipe) (400-7003) | CY | 50 | | $15.12 | $100.00 | $12.96 |
| 25 | Cem stabil BKFL (400-7010) | CY | 321 | $250.00 | $255.59 | $133.00 | $144.17 |
| 26 | Sheet piling (PZ - 27) (407-7002) | SF | 4,385 | | $77.37 | $65.00 | $90.20 |
| 27 | Drilled shaft (24 in) (416-7004) | LF | 966 | $280.00 | $352.57 | $325.00 | $463.16 |
| 28 | Drilled shaft (36 in) (416-7006) | LF | 610 | | $434.23 | $685.00 | $734.12 |
| 29 | Class C concrete (abutment) (420-7012) | CY | 117.20 | $2,000.00 | $1,432.74 | $2,500.00 | $2,968.63 |
| 30 | Class C concrete (cap) (420-7022) | CY | 16 | $2,000.00 | $2,533.25 | $3,000.00 | $5,571.33 |
| 31 | Class C concrete (column) (420-7038) | CY | 7.20 | $2,000.00 | $1,982.49 | $5,400.00 | $7,138.06 |
| 32 | Class C concrete (rail foundation) (420-7052) | CY | 10 | | $755.73 | $1,000.00 | $2,356.75 |
| 33 | Class C concrete (collar) (420-7061) | EACH | 1 | | $1,484.20 | $1,800.00 | $918.00 |
| 34 | Class C concrete (coping) (420-7143) | LF | 119 | | $283.05 | $220.00 | $591.54 |
| 35 | Reinforced concrete slab (422-7001) | SF | 8,687 | $32.00 | $32.53 | $32.00 | $72.50 |
| 36 | Approach slab (422-7013) | CY | 175.30 | $900.00 | $1,186.25 | $900.00 | $1,014.74 |
| 37 | Prestressed concrete girder (TX28) (425-7001) | LF | 486.50 | | $303.28 | $287.00 | $381.62 |
| 38 | Prestressed concrete slab beam (4SB12) (425-7016) | LF | 178.05 | | $297.06 | $270.00 | $232.09 |
| 39 | Prestressed concrete slab beam (5SB15) (425-7019) | LF | 839.92 | $250.00 | $266.09 | $292.00 | $254.74 |
| 40 | Riprap (mow strip)(4 in) (432-7013) | CY | 31 | | $615.89 | $870.00 | $1,728.00 |
| 41 | Riprap (stone protection)(21 in) (432-7044) | CY | 703 | $200.00 | $243.70 | $263.00 | $324.00 |
| 42 | Rail (type T221) (450-7004) | LF | 204 | | $217.89 | $183.00 | $172.80 |
| 43 | Rail (type T223) (450-7008) | LF | 433 | $200.00 | $221.70 | $187.00 | $211.68 |
| 44 | Rail (type PR11) (450-7044) | LF | 204 | | $143.59 | $144.00 | $156.60 |
| 45 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 102 | | $318.37 | $236.00 | $79.74 |
| 46 | RC pipe (CL III)(12 in) (464-7001) | LF | 28 | | $82.70 | $76.00 | $70.20 |
| 47 | RC pipe (CL III)(18 in) (464-7003) | LF | 73 | | $99.05 | $72.00 | $75.60 |
| 48 | Set (type II) (12 in) (RCP) (3: 1) (C) (467-7289) | EACH | 2 | | $2,070.45 | $2,000.00 | $972.00 |
| 49 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 3 | | $1,776.57 | $2,000.00 | $1,080.00 |
| 50 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | | $2,410.11 | $2,200.00 | $1,296.00 |
| 51 | Cast-in-place trench drain (474-7021) | LF | 24 | | $606.96 | $685.00 | $972.00 |
| 52 | Adjusting manholes (water valve box) (479-7007) | EACH | 3 | | $1,860.23 | $125.00 | $1,620.00 |
| 53 | Removing structure (set) (496-7004) | EACH | 2 | | $494.14 | $800.00 | $648.00 |
| 54 | Removing structure (pipe) (496-7007) | LF | 33 | | $42.23 | $80.00 | $54.00 |
| 55 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 4 | $20,000 | $33,000 | $52,000 | $47,405 |
| 56 | Mobilization (500-7001) | LS | 1 | $396,000 | $500,000 | $455,000 | $611,500 |
| 57 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $7,000.00 | $3,594.90 | $3,600.00 | $2,545.00 |
| 58 | Portable changeable message sign (503-7001) | DAY | 100 | $100.00 | $339.82 | $150.00 | $81.00 |
| 59 | Rock filter dams (install) (type 2) (506-7002) | LF | 305 | $55.00 | $46.00 | $48.00 | $45.90 |
| 60 | Rock filter dams (remove) (506-7011) | LF | 305 | $15.00 | $15.00 | $16.00 | $10.80 |
| 61 | Temporary sediment control fence (install) (506-7039) | LF | 6,326 | $5.00 | $4.00 | $4.25 | $3.24 |
| 62 | Temporary sediment control fence (remove) (506-7041) | LF | 6,326 | $1.00 | $1.00 | $1.00 | $1.08 |
| 63 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 100 | | $5.00 | $5.60 | $8.64 |
| 64 | Biodegradable erosion control logs (remove) (506-7046) | LF | 100 | | $1.00 | $1.00 | $2.16 |
| 65 | Constructing detours (508-7001) | SY | 1,665 | | $79.98 | $94.00 | $122.63 |
| 66 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 840 | | $69.70 | $40.00 | $89.74 |
| 67 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 570 | | $14.55 | $34.00 | $8.16 |
| 68 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 840 | | $15.52 | $28.00 | $26.53 |
| 69 | Portable concrete traffic barrier (pinning) (512-7071) | EACH | 156 | | $286.75 | $72.00 | $119.39 |
| 70 | Driveways (concrete) (530-7006) | SY | 67 | | $216.45 | $225.00 | $243.00 |
| 71 | Driveways (ACP) (530-7010) | SY | 403 | | $82.72 | $69.00 | $87.47 |
| 72 | Driveways (base) (530-7015) | SY | 49 | $40.00 | $162.12 | $110.00 | $154.16 |
| 73 | Concrete sidewalks (6") (531-7003) | SY | 3,947 | | $104.04 | $54.00 | $205.20 |
| 74 | Curb ramps (type 1) (531-7005) | EACH | 4 | | $2,952.35 | $3,800.00 | $3,780.00 |
| 75 | Curb ramps (type 2) (531-7006) | EACH | 1 | | $2,952.38 | $3,800.00 | $3,780.00 |
| 76 | Curb ramps (type 3) (531-7007) | EACH | 1 | | $2,952.38 | $3,800.00 | $3,780.00 |
| 77 | Curb ramps (type 6) (531-7009) | EACH | 1 | | $5,177.09 | $3,800.00 | $3,780.00 |
| 78 | Curb ramps (type 7) (531-7010) | EACH | 11 | | $2,952.35 | $3,800.00 | $3,780.00 |
| 79 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 2,530 | | $0.59 | $1.50 | $0.64 |
| 80 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 1,680 | | $0.67 | $1.70 | $0.72 |
| 81 | Metal W-beam guard fence (timber post) (540-7001) | LF | 537.50 | $35.00 | $28.86 | $30.00 | $29.70 |
| 82 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $2,000.00 | $2,079.00 | $2,100.00 | $2,160.00 |
| 83 | TL-2 31" short radius (complete) (540-7036) | EACH | 1 | | $25,275 | $20,000 | $30,240 |
| 84 | Remove metal beam guard fence (542-7001) | LF | 375 | | $3.00 | $6.35 | $2.70 |
| 85 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | | $250.00 | $318.00 | $270.00 |
| 86 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,500.00 | $3,349.00 | $3,300.00 | $3,240.00 |
| 87 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | | $250.00 | $318.00 | $270.00 |
| 88 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 5 | | $3,400.00 | $1,770.00 | $2,052.00 |
| 89 | Crash cushion attenuator (remove) (545-7004) | EACH | 9 | | $2,200.00 | $860.00 | $972.00 |
| 90 | Crash cushion attenuator (install)(L)(N)(TL2) (545-7005) | EACH | 2 | $25,000 | $27,950 | $33,000 | $28,809 |
| 91 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 2 | | $27,950 | $33,000 | $28,809 |
| 92 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 9 | | $9,650.00 | $8,735.00 | $8,634.60 |
| 93 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 30 | | $587.00 | $620.00 | $729.00 |
| 94 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | | $852.00 | $900.00 | $1,161.00 |
| 95 | Remove SM RD SN sup&AM (644-7073) | EACH | 39 | $125.00 | $79.00 | $84.00 | $102.60 |
| 96 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 6 | | $15.50 | $60.00 | $22.68 |
| 97 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 4 | $35.00 | $16.25 | $60.00 | $16.20 |
| 98 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 15 | | $22.00 | $40.00 | $37.80 |
| 99 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 3 | $35.00 | $27.00 | $40.00 | $37.80 |
| 100 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 88 | | $4.00 | $5.10 | $6.48 |
| 101 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 5,535 | | $1.00 | $1.30 | $1.52 |
| 102 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 150 | | $8.50 | $11.00 | $17.82 |
| 103 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 7,000 | | $1.00 | $1.30 | $1.57 |
| 104 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 671 | | $7.85 | $10.00 | $16.74 |
| 105 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 340 | | $1.10 | $1.40 | $0.81 |
| 106 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 671 | | $7.50 | $9.50 | $3.24 |
| 107 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 50 | | $2.00 | $2.60 | $1.13 |
| 108 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 170 | | $2.00 | $2.60 | $0.97 |
| 109 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 340 | | $2.25 | $2.90 | $5.24 |
| 110 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 170 | | $1.45 | $1.85 | $8.26 |
| 111 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 45 | | $2.50 | $3.20 | $8.26 |
| 112 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 2,765 | | $1.00 | $1.30 | $1.03 |
| 113 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 290 | | $1.50 | $1.90 | $1.46 |
| 114 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,955 | | $1.00 | $1.30 | $1.03 |
| 115 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 37 | | $6.00 | $7.70 | $7.56 |
| 116 | Eliminating existing PM & markers (4") (677-7001) | LF | 6,760 | | $0.50 | $0.65 | $0.58 |
| 117 | Eliminating existing PM & markers (24") (677-7008) | LF | 40 | | $5.00 | $6.40 | $2.70 |
| 118 | Pavement surface preparation for marking (6") (678-7002) | LF | 560 | | $0.50 | $0.65 | $0.65 |
| 119 | Pavement surface preparation for marking (24") (678-7008) | LF | 671 | | $1.00 | $1.30 | $3.24 |
| 120 | Temporary traffic signals (681-7001) | EACH | 1 | | $50,000 | $25,000 | $42,015 |
| 121 | Intrlck art concrete BLKS W/cable (6" min) (4001-7005) | SF | 3,090 | | $9.85 | $16.00 | $41.50 |
| 122 | Residential driveway temporary signal system (6089-7001) | MO | 5 | | $8,800.00 | $4,000.00 | $2,500.00 |