TxDOT contract A00061563 bid tabulation

Bridge Replacement, SH 7 (AT MORRAL CREEK to .). Let by Texas DOT on May 1, 2025, Nacogdoches, Lufkin District. 8 bids received; low bid $6,230,927 by THK Construction LLC, -15% against the engineer's estimate of $7,373,105.

Owner
Texas DOT
Letting
01 MAY 2025
Pay items
108
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1THK Construction LLC$6,230,927Low-15%
2Longview Bridge and Road, LTD.$6,657,814+7.0%-10%
3A. L. Helmcamp, Inc.$6,780,150+9.0%-8.0%
4Highway 19 Construction LLC$7,114,128+14%-4.0%
5True Roads Construction, LLC$7,372,316+18%0.0%
6Altus Construction LLC$8,195,695+32%+11%
7Hodges and Son Construction Company, Inc.$8,690,667+39%+18%
8Brice Highway LLC$9,773,672+57%+33%
TxDOT contract A00061563: bids by rank

Engineer's estimate: $7,373,105.

Bid tabulation

LinePay itemUnitQuantityEstimate1. THK Construction LLC2. Longview Bridge and Road, LTD.3. A. L. Helmcamp, Inc.4. Highway 19 Construction LLC5. True Roads Construction, LLC6. Altus Construction LLC
1Preparing row (100-7002)STA36$2,000.00$3,000.00$3,500.00$7,500.00$5,000.00$2,800.00$22,566
2Removing concrete (riprap) (104-7006)SY284$40.00$20.00$20.00$35.00$25.00$14.00$34.67
3Remove (15") TRT/untrt base & asphalt pavement (105-7035)SY2,789$25.00$10.64$15.00$7.50$15.00$13.50$22.10
4Remove (8"-19") TRT/untrt base & asphalt pavement (105-7119)SY71$20.00$2.75$22.00$15.00$15.00$24.00$20.80
5Remove stab base and asphalt pavement (6"-20") (105-7123)SY1,654$10.00$12.86$12.50$7.00$15.00$16.00$23.79
6Excavation (roadway) (110-7001)CY2,370$20.00$10.00$18.50$12.00$10.00$17.00$20.34
7Embankment (final)(DC)(type C) (132-7006)CY4,252$25.00$10.00$26.50$18.00$30.00$36.00$16.54
8Blading (150-7001)STA29$350.00$500.00$250.00$188.00$350.00$220.00$303.39
9Furn & place topsoil (4") (160-7002)SY60,400$2.50$3.00$3.10$1.00$2.76$3.00$5.82
10Block sodding (162-7002)SY88$10.00$13.91$14.00$10.00$5.00$8.80$7.02
11Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073)SY60,400$1.75$0.67$0.65$0.54$0.25$0.55$0.98
12Bonded fiber MTRX seed (temporary)(warm) (164-7074)SY30,200$1.25$0.63$0.60$0.54$0.25$0.55$0.30
13Bonded fiber MTRX seed (temporary)(cool) (164-7075)SY30,200$1.25$0.63$0.65$0.54$0.25$0.55$0.30
14Vegetative watering (168-7001)TGL3,624.80$20.00$5.00$16.00$3.50$10.00$20.00$31.71
15Sprinkling (dust control) (204-7001)TGL60$10.00$100.00$25.00$3.50$100.00$20.00$0.87
16FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY2,073$40.00$76.00$57.00$44.00$35.00$58.50$32.22
17FL BS (compacted in place)(rap) (6") (247-7341)SY1,654$40.00$25.00$30.00$24.00$25.00$15.00$28.19
18Cement (275-7001)TON126$260.00$300.00$300.00$250.00$350.00$290.00$238.38
19Cement TRT (new base)(12") (275-7013)SY3,727$10.00$5.00$4.00$5.00$4.00$6.00$2.17
20Cement TRT (subgrade)(12") (275-7015)SY3,848$6.00$5.00$4.00$7.00$5.00$5.75$4.98
21Asphalt (RC-250) (316-7032)TON36$1,500.00$963.00$1,225.00$1,200.00$100.00$1.00$2,083.71
22Asphalt (AC-15P or CRS-2P) (316-7078)GAL21.30$1,250.00$3.75$26.00$10.00$100.00$1.00$5.42
23Aggregate (type E or L, GR-5) (316-7254)CY25$360.00$1,177.00$330.00$750.00$200.00$1,000.00$111.36
24Aggregate (type E or L, PE or PL GR 4) (sac-A) (316-7274)CY99$360.00$856.00$220.00$350.00$200.00$700.00$146.49
25SP mixes SP-C PG70-22 (344-7019)TON1,442$180.00$269.79$172.00$190.00$350.00$220.00$261.66
26SP mixes SP-C sac-A PG70-22 (344-7020)TON357$309.26$167.00$220.00$350.00$230.00$265.01
27SP mixes SP-D PG64-22 (level-UP) (344-7044)TON30$180.00$465.45$260.00$350.00$350.00$400.00$261.90
28SP mixes SP-D PG64-22 (exempt) (344-7074)TON89$180.00$310.30$320.00$750.00$350.00$285.00$457.69
29Planing asphalt concrete pavement(0" to 4") (354-7034)SY9,417$8.00$3.66$4.00$3.10$17.00$4.00$4.18
30Cut & restoring pavement (400-7006)SY24$200.00$150.00$205.00$220.00$250.00$175.00$216.71
31Cem stabil BKFL (400-7010)CY384$325.00$260.00$230.00$190.00$300.00$290.00$261.50
32Drilled shaft (18 in) (416-7002)LF140$175.00$274.38$185.00$280.00$150.00$148.00$207.65
33Drilled shaft (24 in) (416-7004)LF420$304.45$243.00$270.00$300.00$235.00$167.19
34Drilled shaft (36 in) (416-7006)LF630$380.00$395.57$353.00$290.00$600.00$320.00$230.36
35Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF8$300.00$778.01$450.00$460.00$450.00$445.00$840.36
36Class C concrete (abutment) (420-7012)CY88.40$1,300.00$1,100.00$1,100.00$2,100.00$1,163.00$1,175.00$1,261.51
37Class C concrete (cap) (420-7022)CY65.40$1,500.00$1,500.00$1,300.00$1,600.00$1,500.00$1,400.00$1,805.77
38Class C concrete (column) (420-7038)CY15$2,000.00$2,500.00$2,050.00$2,100.00$1,200.00$2,800.00$3,454.25
39Reinforced concrete slab (422-7001)SF12,420$23.00$17.78$25.00$34.00$27.00$31.00$36.42
40Reinforced concrete slab (slab beam) (422-7007)SF3,900$21.00$17.00$31.00$19.00$26.00$75.38
41Approach slab (422-7013)CY154$830.00$700.00$800.00$800.00$750.00$665.00$663.48
42Prestressed concrete girder (TX34) (425-7002)LF1,013.54$200.00$237.00$200.00$235.00$320.00$245.00$272.97
43Prestressed concrete girder (TX40) (425-7003)LF696.50$225.00$237.00$200.00$235.00$320.00$265.00$215.10
44Prestressed concrete slab beam (5SB15) (425-7019)LF742.50$305.00$260.00$275.00$259.00$310.00$321.07
45Riprap (concrete)(4 in) (432-7001)CY0.35$700.00$2,000.00$4,500.00$1,800.00$1,500.00$4,000.00$650.12
46Riprap (stone protection)(18 in) (432-7043)CY181$130.00$185.00$146.00$180.00$185.00$177.70
47Riprap (stone protection)(24 in) (432-7045)CY4,265$320.00$130.00$195.00$146.00$180.00$180.00$140.81
48Rail (type T223) (450-7008)LF324$165.00$100.00$220.00$150.00$120.00$309.47
49Rail (type SSTR) (450-7024)LF604$130.00$155.00$80.00$145.00$180.00$100.00$175.41
50Armor joint (sealed) (454-7003)LF44$150.00$210.00$200.00$180.00$140.00$173.37
51Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF103$250.00$150.00$300.00$250.00$180.00$260.00$326.86
52RC pipe (CL III)(18 in) (464-7003)LF144$90.00$60.00$75.00$75.00$65.00$125.00$90.15
53Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH8$1,500.00$1,000.00$1,400.00$1,300.00$1,000.00$1,300.00$1,601.90
54Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$30,000$21,000$40,000$20,000$30,000$40,452
55Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$75,000$50,000$32,000$93,000$160,000$90,000$98,241
56Removing structure (pipe) (496-7037)EACH4$1,000.00$500.00$1,000.00$1,600.00$500.00$1,800.00$1,083.54
57Mobilization (500-7001)LS1$700,000$400,000$400,000$655,000$750,000$650,000$816,419
58Barricades, signs and traffic handling (502-7001)MO25$3,500.00$792.45$5,000.00$15,000$2,500.00$7,500.00$4,334.15
59Portable changeable message sign (503-7002)EACH3$20,000$25,000$17,000$12,000$15,000$17,500$20,226
60TMA (stationary) (505-7001)DAY100$325.00$250.00$330.00$200.00$250.00$200.00$192.67
61TMA (mobile operation) (505-7003)DAY10$350.00$300.00$550.00$300.00$1,000.00$200.00$216.71
62Rock filter dams (install) (type 2) (506-7002)LF898$55.00$36.38$40.00$37.00$65.00$40.00$47.47
63Rock filter dams (remove) (506-7011)LF898$15.00$13.91$9.00$8.00$10.00$8.80$14.76
64Construction exits (install) (type 2) (506-7021)SY669$40.00$10.00$50.00$25.00$25.00$32.00$39.87
65Construction exits (remove) (506-7024)SY669$15.00$1.00$11.00$5.00$10.00$11.00$10.97
66Construction perimeter fence (506-7034)LF460$15.00$10.00$8.00$7.00$3.00$6.60$4.94
67Temporary sediment control fence (install) (506-7039)LF7,147$5.00$4.07$4.25$3.90$4.00$4.00$3.96
68Temporary sediment control fence (remove) (506-7041)LF7,147$1.00$0.86$1.00$1.00$1.00$1.10$1.20
69Constructing detours (508-7001)SY4,337$110.00$151.72$160.00$150.00$120.00$200.00$125.78
70Driveways (ACP) (530-7010)SY389$75.00$73.83$365.00$62.00$75.00$68.00$79.02
71Metal W-beam guard fence (timber post) (540-7001)LF1,012.50$35.00$33.16$30.00$26.00$25.00$33.00$32.36
72Metal beam guard fence trans (thrie-beam) (540-7005)EACH8$1,500.00$1,845.75$2,100.00$1,800.00$2,850.00$1,900.00$2,195.97
73Downstream anchor terminal section (540-7015)EACH2$1,524.75$1,800.00$1,700.00$2,500.00$1,500.00$2,080.39
74Remove metal beam guard fence (542-7001)LF1,550$8.00$3.21$2.25$2.20$3.00$3.30$6.36
75RM metal beam guard fence trans (thrie-beam) (542-7004)EACH4$1,200.00$160.50$225.00$220.00$2,500.00$165.00$248.49
76Guardrail end treatment (install) (544-7001)EACH10$3,500.00$3,236.75$3,500.00$3,300.00$3,050.00$3,325.00$3,814.05
77Guardrail end treatment (remove) (544-7003)EACH8$725.00$214.00$225.00$220.00$250.00$220.00$288.94
78Wire fence (type D) (552-7004)LF5,758$30.00$15.00$35.00$11.00$15.00$16.50$16.97
79Mailbox install-S (WC-post) type 3 (560-7004)EACH3$400.00$323.14$350.00$340.00$450.00$900.00$317.84
80Relocate existing mailbox (560-7012)EACH1$400.00$216.14$225.00$290.00$350.00$550.00$9,193.49
81In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH1$4,700.00$8,511.22$11,550$12,000$10,500$11,500$20.09
82Conduit (PVC) (schedule 80) (2") (618-7054)LF620$12.00$18.60$18.50$19.00$17.00$18.00$2.91
83Electrical conductor (no.8) bare (620-7007)LF620$2.00$2.70$2.75$3.00$2.50$2.75$3.39
84Electrical conductor (no.8) insulated (620-7008)LF1,240$2.00$3.14$3.00$3.00$2.70$3.00$3.39
85Ground box type A (122311)W/apron (624-7002)EACH3$1,500.00$1,372.40$1,925.00$2,000.00$1,750.00$1,900.00$1,482.41
86Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048)EACH1$9,000.00$10,304$9,500.00$9,700.00$8,550.00$9,400.00$11,130
87Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$850.00$1,626.40$1,675.00$1,220.00$1,000.00$1,100.00$1,346.48
88Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH8$810.00$486.85$500.00$620.00$700.00$1,100.00$676.13
89Remove SM RD SN sup&AM (644-7073)EACH6$185.00$105.93$110.00$140.00$100.00$110.00$150.25
90Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH8$57.00$21.40$35.00$33.00$35.00$22.00$24.85
91Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH14$46.00$26.75$40.00$36.00$35.00$27.50$28.32
92Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH1$40.00$53.50$100.00$130.00$35.00$275.00$144.47
93Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF11,496$1.00$0.81$1.00$0.80$0.75$0.82$0.87
94Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF11,496$1.00$0.81$1.00$0.80$0.75$0.82$0.87
95Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH144$6.00$7.49$8.00$7.40$7.00$7.70$8.09
96Work zone pavement marking removing (W)6"(solid) (662-7068)LF5,748$2.50$2.14$2.25$2.20$2.00$2.20$2.31
97Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH575$2.50$2.68$5.00$1.00$2.00$2.20$0.54
98Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,150$2.50$2.68$5.00$1.00$2.00$2.20$0.57
99Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF16$1.00$8.56$9.00$8.50$20.00$8.80$9.25
100Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF5,740$1.00$2.68$2.75$2.60$2.50$2.75$2.89
101Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF5,740$1.00$2.68$2.75$2.60$2.50$2.75$2.89
102Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF119$1.00$5.35$6.00$5.30$5.00$5.50$5.78
103Prefabricated PM type C (W)(24")(solid) (668-7089)LF16$18.00$21.40$25.00$22.00$20.00$22.00$23.12
104Reflectorized pavement marker type I-C (672-7002)EACH1$6.00$21.40$25.00$22.00$20.00$22.00$23.12
105Reflectorized pavement marker type II-A-A (672-7004)EACH144$6.00$10.70$12.00$11.00$10.00$11.00$11.56
106Eliminating existing PM & markers (4") (677-7001)LF5,748$0.60$1.07$2.25$0.70$2.00$4.40$0.65
107Bonding course (3007-7001)GAL710$6.50$8.56$5.50$6.00$7.00$7.00$4.12
108Temporary detour bridge (4012-7001)EACH1$300,000$445,000$500,000$300,000$200,000$600,000$539,306
TxDOT contract A00061563: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy