TxDOT contract A00183345 bid tabulation
Construct Pedestrian Infrastructure, IH 410 (Callaghan Rd. to Pin Oak Dr.). Let by Texas DOT on March 5, 2025, Bexar, San Antonio District. 6 bids received; low bid $2,872,934 by E-Z Bel Construction, LLC, -0.8% against the engineer's estimate of $2,896,669.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 134
- Data through
- 19 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E-Z Bel Construction, LLC | $2,872,934 | Low | -1.0% |
| 2 | Ti-Zack Concrete, LLC | $3,460,984 | +20% | +19% |
| 3 | Dan Williams Company | $3,461,365 | +20% | +19% |
| 5 | MP Heavy Construction Inc | $3,546,049 | +23% | +22% |
| 6 | Brice Highway LLC | $4,404,057 | +53% | +52% |
Engineer's estimate: $2,896,669.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. E-Z Bel Construction, LLC | 2. Ti-Zack Concrete, LLC | 3. Dan Williams Company | 4. MP Heavy Construction Inc | 5. Brice Highway LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 83.99 | $1,800.00 | $550.00 | $825.00 | $4,000.00 | $2,384.00 | $4,640.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 110 | $24.79 | $10.00 | $24.62 | $50.00 | $13.59 | $95.15 |
| 3 | Removing concrete (medians) (104-7008) | SY | 24 | $20.32 | $25.00 | $37.62 | $70.00 | $30.80 | $110.17 |
| 4 | Removing concrete (pavers) (104-7010) | SY | 5 | $25.00 | $25.00 | $36.12 | $320.00 | $7.89 | $205.53 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 1,837 | $33.00 | $25.00 | $19.66 | $30.00 | $19.30 | $92.77 |
| 6 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 211 | $41.00 | $25.00 | $21.40 | $35.00 | $20.00 | $51.11 |
| 7 | Removing concrete (curb) (104-7016) | LF | 1,805 | $12.30 | $4.00 | $10.00 | $10.50 | $21.80 | $15.06 |
| 8 | Removing concrete (foundations) (104-7024) | CY | 1 | $275.86 | $25.00 | $902.88 | $1,000.00 | $550.00 | $1,037.46 |
| 9 | Remove (8") TRT/untrt base & asphalt pavement (105-7028) | SY | 131 | $20.00 | $11.00 | $27.57 | $35.00 | $6.75 | $62.48 |
| 10 | Excavation (special) (110-7003) | CY | 160.40 | $134.37 | $25.00 | $56.29 | $61.00 | $28.00 | $205.72 |
| 11 | Embankment (final)(OC)(type B) (132-7003) | CY | 133.40 | $144.59 | $31.00 | $67.68 | $61.00 | $36.00 | $340.56 |
| 12 | Compost manuf topsoil (4") (161-7002) | SY | 3,380 | $4.62 | $1.00 | $5.24 | $8.50 | $3.50 | $2.75 |
| 13 | Block sodding (162-7002) | SY | 3,380 | $7.81 | $7.95 | $7.70 | $8.25 | $8.75 | $7.95 |
| 14 | Vegetative watering (168-7001) | TGL | 52.73 | $76.94 | $110.00 | $1.10 | $20.00 | $30.00 | $392.40 |
| 15 | D-GR HMA type-C PG70-22 (level-UP) (341-7026) | TON | 17.30 | $203.87 | $748.14 | $330.00 | $650.00 | $255.00 | $250.00 |
| 16 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 867 | $5.27 | $10.50 | $16.50 | $35.00 | $4.25 | $6.41 |
| 17 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 391 | $5.01 | $16.10 | $22.00 | $37.00 | $6.05 | $6.60 |
| 18 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 8 | $332.61 | $260.00 | $440.00 | $450.00 | $737.00 | $385.00 |
| 19 | Class A concrete (miscellaneous) (420-7002) | CY | 10 | $759.00 | $490.00 | $936.60 | $900.00 | $787.50 | $2,650.93 |
| 20 | Class C concrete (miscellaneous) (420-7067) | CY | 24.30 | $2,000.00 | $480.00 | $936.60 | $900.00 | $4,000.00 | $2,382.03 |
| 21 | Riprap (concrete)(4 in) (432-7001) | CY | 117.50 | $773.00 | $560.00 | $936.60 | $675.00 | $701.00 | $918.05 |
| 22 | Rail (handrail)(type D) (450-7061) | LF | 33 | $103.16 | $250.00 | $396.00 | $250.00 | $250.00 | $413.55 |
| 23 | Inlet (comp)(type sidewalk bridge) (465-7336) | EACH | 1 | $11,599 | $14,500 | $24,750 | $12,500 | $5,000.00 | $7,716.22 |
| 24 | Grate & frame (471-7003) | EACH | 4 | $2,500.00 | $5,000.00 | $9,350.00 | $4,500.00 | $2,700.00 | $5,152.48 |
| 25 | Mobilization (500-7001) | LS | 1 | $263,939 | $200,000 | $349,000 | $340,000 | $459,000 | $400,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $7,500.00 | $1,000.00 | $8,800.00 | $25,000 | $3,500.00 | $16,200 |
| 27 | Portable changeable message sign (503-7002) | EACH | 4 | $11,793 | $30,000 | $2,000.00 | $12,000 | $11,000 | $34,789 |
| 28 | TMA (stationary) (505-7001) | DAY | 130 | $252.75 | $360.00 | $1.10 | $150.00 | $220.00 | $526.25 |
| 29 | TMA (mobile operation) (505-7002) | HR | 160 | $123.20 | $84.00 | $1.10 | $65.00 | $70.00 | $174.27 |
| 30 | Construction perimeter fence (506-7034) | LF | 5,000 | $9.00 | $3.50 | $1.10 | $2.00 | $2.15 | $1.95 |
| 31 | Sandbags for erosion control (506-7035) | EACH | 100 | $40.00 | $10.00 | $0.11 | $10.00 | $11.00 | $10.00 |
| 32 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 8,800 | $6.46 | $7.00 | $0.11 | $3.50 | $3.80 | $3.45 |
| 33 | Biodegradable erosion control logs (remove) (506-7046) | LF | 8,800 | $1.63 | $1.00 | $0.11 | $1.00 | $0.55 | $0.50 |
| 34 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,000 | $50.00 | $23.00 | $60.00 | $35.00 | $95.00 | $89.21 |
| 35 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 60 | $54.52 | $26.00 | $60.00 | $35.00 | $94.00 | $90.98 |
| 36 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,000 | $16.71 | $10.00 | $11.00 | $20.00 | $22.50 | $14.79 |
| 37 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 60 | $20.35 | $7.00 | $11.00 | $20.00 | $22.00 | $21.94 |
| 38 | Colored textured concrete (4") (527-7001) | SY | 25 | $94.14 | $100.00 | $177.75 | $300.00 | $132.00 | $313.41 |
| 39 | Landscape pavers (528-7001) | SY | 63 | $97.62 | $100.00 | $165.00 | $115.00 | $98.00 | $256.94 |
| 40 | Remove and relay pavers (528-7003) | SY | 83 | $100.00 | $100.00 | $165.00 | $125.00 | $185.00 | $300.00 |
| 41 | Concrete curb (type II) (529-7002) | LF | 1,878 | $48.00 | $24.00 | $54.35 | $35.00 | $14.66 | $8.73 |
| 42 | Concrete curb (mono) (type II) (529-7007) | LF | 414 | $22.89 | $33.00 | $45.98 | $38.00 | $17.50 | $8.73 |
| 43 | Concrete curb (type C1) (529-7016) | LF | 1,141 | $102.00 | $77.00 | $276.73 | $175.00 | $220.00 | $360.68 |
| 44 | Concrete curb (type C2) (529-7023) | LF | 60 | $150.00 | $243.00 | $298.90 | $265.00 | $312.00 | $360.79 |
| 45 | Intersections (ACP) (530-7002) | SY | 1,196 | $70.00 | $151.00 | $187.32 | $90.00 | $156.00 | $55.00 |
| 46 | Driveways (concrete) (530-7006) | SY | 1,808 | $102.25 | $124.00 | $146.26 | $120.00 | $117.00 | $166.71 |
| 47 | Concrete sidewalks (4") (531-7001) | SY | 4,902 | $94.73 | $97.00 | $125.00 | $70.00 | $87.50 | $116.42 |
| 48 | Concrete sidewalks (6") (531-7003) | SY | 56 | $96.46 | $100.00 | $177.82 | $90.00 | $109.00 | $231.20 |
| 49 | Curb ramps (type 1) (531-7005) | EACH | 13 | $2,478.12 | $5,000.00 | $2,838.18 | $2,600.00 | $2,316.00 | $4,984.90 |
| 50 | Curb ramps (type 2) (531-7006) | EACH | 25 | $3,000.00 | $5,000.00 | $2,838.18 | $2,600.00 | $2,826.00 | $4,984.90 |
| 51 | Curb ramps (type 3) (531-7007) | EACH | 9 | $3,000.00 | $5,000.00 | $2,838.18 | $2,600.00 | $2,900.00 | $4,984.90 |
| 52 | Curb ramps (type 7) (531-7010) | EACH | 10 | $2,750.00 | $5,000.00 | $2,838.18 | $2,600.00 | $2,528.00 | $4,984.90 |
| 53 | Curb ramps (type 22) (531-7014) | EACH | 1 | $4,000.00 | $6,000.00 | $2,838.18 | $4,200.00 | $3,469.00 | $4,984.93 |
| 54 | Concrete median (536-7002) | SY | 80 | $113.25 | $270.00 | $177.82 | $115.00 | $308.00 | $253.44 |
| 55 | Remove metal beam guard fence (542-7001) | LF | 275 | $6.62 | $6.00 | $5.78 | $6.00 | $3.00 | $6.00 |
| 56 | Remove terminal anchor section (542-7002) | EACH | 2 | $399.80 | $170.00 | $302.50 | $450.00 | $252.00 | $450.00 |
| 57 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $201.99 | $450.00 | $357.50 | $450.00 | $299.00 | $450.00 |
| 58 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 8 | $260.00 | $300.00 | $605.00 | $560.00 | $307.00 | $560.00 |
| 59 | Remove RD IL asm (trans-base) (610-7009) | EACH | 1 | $786.54 | $738.00 | $1,100.00 | $1,100.00 | $583.00 | $1,050.00 |
| 60 | Replace luminaire W/(150W EQ) LED (610-7011) | EACH | 6 | $532.33 | $680.00 | $880.00 | $600.00 | $704.00 | $600.00 |
| 61 | Replace luminaire W/(250W EQ) LED (610-7012) | EACH | 8 | $827.52 | $680.00 | $880.00 | $600.00 | $990.00 | $600.00 |
| 62 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 1 | $4,665.14 | $13,000 | $10,450 | $11,000 | $7,480.00 | $9,820.00 |
| 63 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 545 | $16.04 | $15.00 | $22.00 | $22.00 | $12.00 | $22.00 |
| 64 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 265 | $27.23 | $30.00 | $22.00 | $24.00 | $13.50 | $24.00 |
| 65 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 375 | $37.12 | $30.00 | $33.00 | $28.00 | $17.45 | $28.00 |
| 66 | Conduit (prepare) (618-7090) | LF | 8,295 | $1.92 | $1.00 | $2.20 | $3.00 | $7.81 | $3.00 |
| 67 | Electrical conductor (no.14) insulated (620-7002) | LF | 100 | $1.76 | $1.00 | $4.40 | $1.20 | $1.40 | $1.20 |
| 68 | Electrical conductor (no.8) bare (620-7007) | LF | 670 | $2.10 | $2.00 | $4.40 | $1.90 | $2.13 | $1.90 |
| 69 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,340 | $1.94 | $2.50 | $4.40 | $1.90 | $2.20 | $1.90 |
| 70 | Electrical conductor (no.6) bare (620-7009) | LF | 425 | $2.20 | $2.50 | $4.40 | $2.40 | $1.75 | $2.40 |
| 71 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,050 | $2.33 | $3.00 | $4.40 | $2.40 | $2.33 | $2.40 |
| 72 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $1,316.97 | $1,500.00 | $1,540.00 | $2,000.00 | $1,118.00 | $1,525.00 |
| 73 | Ground box type D (162922) (624-7007) | EACH | 7 | $1,158.63 | $1,000.00 | $1,540.00 | $2,000.00 | $1,441.00 | $1,410.00 |
| 74 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,639.37 | $2,000.00 | $2,090.00 | $2,000.00 | $1,310.00 | $1,785.00 |
| 75 | Remove ground box (624-7013) | EACH | 17 | $247.31 | $270.00 | $440.00 | $250.00 | $352.00 | $200.00 |
| 76 | Remove electrical services (628-7002) | EACH | 1 | $669.66 | $370.00 | $825.00 | $1,000.00 | $968.00 | $500.00 |
| 77 | Elc SRV type A 240/480 060(NS)SS(E)SP(U) (628-7049) | EACH | 1 | $8,538.80 | $10,000 | $9,900.00 | $12,500 | $7,320.00 | $9,450.00 |
| 78 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 23 | $795.63 | $550.00 | $850.00 | $1,200.00 | $700.00 | $1,545.00 |
| 79 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 4 | $900.00 | $859.00 | $850.00 | $1,000.00 | $600.00 | $1,655.00 |
| 80 | Relocate SM RD SN sup&AM(sign only) (644-7072) | EACH | 6 | $204.50 | $115.00 | $850.00 | $120.00 | $650.00 | $115.42 |
| 81 | Remove SM RD SN (foundation only) (644-7106) | EACH | 6 | $216.54 | $137.50 | $275.00 | $120.00 | $125.00 | $117.00 |
| 82 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 2,044 | $1.00 | $2.65 | $1.93 | $1.75 | $0.68 | $1.75 |
| 83 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 606 | $1.43 | $2.85 | $1.93 | $1.75 | $0.81 | $1.75 |
| 84 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 811 | $1.57 | $4.00 | $5.50 | $3.00 | $1.30 | $10.00 |
| 85 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 3,007 | $9.68 | $6.00 | $10.45 | $9.50 | $9.45 | $9.50 |
| 86 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 756 | $1.25 | $2.00 | $1.65 | $1.50 | $1.15 | $1.50 |
| 87 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 81 | $8.55 | $6.00 | $10.45 | $9.50 | $9.00 | $9.50 |
| 88 | Reflectorized pavement marking type II (W) 4" (broken) (666-7168) | LF | 134 | $0.77 | $2.00 | $1.10 | $1.00 | $0.30 | $1.00 |
| 89 | Pavement sler 4" (666-7346) | LF | 134 | $0.54 | $0.50 | $1.10 | $1.00 | $0.50 | $1.00 |
| 90 | Pavement sler 8" (666-7348) | LF | 756 | $0.92 | $0.50 | $1.65 | $1.50 | $0.60 | $1.50 |
| 91 | Pavement sler 24" (666-7352) | LF | 3,088 | $3.81 | $2.00 | $3.85 | $3.50 | $2.50 | $3.50 |
| 92 | Eliminating existing PM & markers (4") (677-7001) | LF | 104 | $0.73 | $1.00 | $1.65 | $1.50 | $0.82 | $1.50 |
| 93 | Eliminating existing PM & markers (8") (677-7004) | LF | 756 | $1.71 | $1.00 | $1.65 | $1.50 | $1.50 | $1.50 |
| 94 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,653 | $8.25 | $3.00 | $2.75 | $2.50 | $5.00 | $2.50 |
| 95 | Pavement surface preparation for marking (4") (678-7001) | LF | 134 | $0.34 | $0.11 | $0.17 | $1.00 | $0.72 | $0.15 |
| 96 | Pavement surface preparation for marking (8") (678-7004) | LF | 756 | $0.52 | $0.11 | $0.33 | $1.00 | $0.90 | $0.30 |
| 97 | Pavement surface preparation for marking (24") (678-7008) | LF | 3,088 | $1.36 | $0.55 | $0.55 | $1.00 | $1.20 | $0.50 |
| 98 | Install highway traffic signal (upgrade) (680-7011) | EACH | 3 | $7,040.71 | $5,600.00 | $3,300.00 | $3,500.00 | $10,010 | $3,150.00 |
| 99 | Temporary traffic signals (681-7001) | EACH | 1 | $25,000 | $130,000 | $93,500 | $125,000 | $201,300 | $75,454 |
| 100 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 12 | $677.00 | $850.00 | $907.50 | $700.00 | $1,210.00 | $675.00 |
| 101 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 7,085 | $2.58 | $3.00 | $3.30 | $3.20 | $4.63 | $3.20 |
| 102 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 2,425 | $3.46 | $4.00 | $4.40 | $4.20 | $6.33 | $4.20 |
| 103 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 11,470 | $1.99 | $2.00 | $2.20 | $2.90 | $3.34 | $2.90 |
| 104 | Pedestrian pole assembly (687-7001) | EACH | 17 | $2,534.84 | $2,000.00 | $2,640.00 | $3,250.00 | $5,500.00 | $2,600.00 |
| 105 | Remove pedestrian pole assembly (687-7005) | EACH | 10 | $643.00 | $135.00 | $550.00 | $1,000.00 | $216.00 | $375.00 |
| 106 | Pedestrian detect push button (APS) (688-7001) | EACH | 32 | $1,105.49 | $1,100.00 | $935.00 | $1,200.00 | $1,440.00 | $1,150.00 |
| 107 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $1,874.82 | $6,000.00 | $3,850.00 | $5,000.00 | $5,520.00 | $3,745.00 |
| 108 | Removal of conduit (690-7001) | LF | 730 | $10.46 | $3.00 | $3.30 | $3.50 | $15.60 | $3.50 |
| 109 | Removal of cables (690-7009) | LF | 21,385 | $0.95 | $1.00 | $1.10 | $1.00 | $1.20 | $1.00 |
| 110 | Removal of pedestrian push buttons (690-7030) | EACH | 18 | $122.33 | $100.00 | $82.50 | $80.00 | $36.00 | $80.00 |
| 111 | ITS com CBL (ethernet) (6005-7001) | LF | 505 | $2.62 | $4.00 | $4.40 | $2.00 | $3.54 | $2.00 |
| 112 | System integration (6009-7001) | LS | 1 | $5,000.00 | $10,000 | $7,700.00 | $7,000.00 | $9,840.00 | $6,508.00 |
| 113 | Manhole (prepare) (6013-7005) | EACH | 2 | $290.00 | $2,500.00 | $2,200.00 | $1,500.00 | $900.00 | $1,200.00 |
| 114 | Ground box (prepare) (6013-7006) | EACH | 19 | $260.51 | $200.00 | $550.00 | $225.00 | $460.00 | $225.00 |
| 115 | Remove ITS radio (6014-7007) | EACH | 1 | $2,706.09 | $200.00 | $935.00 | $550.00 | $900.00 | $550.00 |
| 116 | Relocate CCTV field equipment (6018-7007) | EACH | 1 | $3,672.28 | $400.00 | $2,200.00 | $2,000.00 | $4,320.00 | $2,000.00 |
| 117 | Field hardened ethernet switch relocate (6023-7002) | EACH | 1 | $500.00 | $800.00 | $1,650.00 | $1,000.00 | $1,032.00 | $1,000.00 |
| 118 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 2,280 | $1.56 | $4.00 | $6.60 | $2.50 | $3.72 | $2.50 |
| 119 | FO splice enclosure (type 2) (6027-7003) | EACH | 1 | $2,112.50 | $2,300.00 | $2,750.00 | $1,800.00 | $2,421.00 | $1,800.00 |
| 120 | Fiber optic fusion splice (6027-7004) | EACH | 4 | $116.79 | $400.00 | $550.00 | $160.00 | $227.00 | $160.00 |
| 121 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 3 | $2,313.69 | $1,800.00 | $2,750.00 | $2,150.00 | $2,260.00 | $2,110.00 |
| 122 | Remove fiber optic cable (6027-7018) | LF | 1,610 | $2.18 | $3.00 | $5.50 | $3.00 | $1.32 | $3.00 |
| 123 | Relocate fiber optic cable (6027-7023) | LF | 50 | $8.76 | $6.00 | $22.00 | $14.00 | $15.90 | $14.00 |
| 124 | Remove existing cables (power) (6072-7001) | LF | 120 | $1.58 | $4.00 | $5.50 | $4.00 | $1.32 | $4.00 |
| 125 | Remove existing cables (communication) (6072-7002) | LF | 285 | $0.52 | $4.00 | $5.50 | $3.00 | $1.32 | $3.00 |
| 126 | Remove existing lane control system (6080-7001) | EACH | 1 | $6,000.00 | $3,500.00 | $5,500.00 | $4,000.00 | $4,080.00 | $3,025.00 |
| 127 | Remove existing fiber hub (6080-7002) | EACH | 1 | $15,000 | $6,000.00 | $7,700.00 | $6,000.00 | $11,400 | $5,500.00 |
| 128 | Removing existing wireless ethernet radio LNK (6080-7003) | EACH | 1 | $500.00 | $1,500.00 | $2,750.00 | $1,800.00 | $900.00 | $1,700.00 |
| 129 | New meter box (7040-7001) | EACH | 3 | $1,200.00 | $500.00 | $1,375.00 | $2,000.00 | $5,900.00 | $750.00 |
| 130 | Adjust valve box (7040-7002) | EACH | 11 | $2,000.00 | $400.00 | $497.45 | $1,850.00 | $1,500.00 | $1,622.43 |
| 131 | Relocate existing & new meter box (7040-7003) | EACH | 3 | $1,500.00 | $700.00 | $2,750.00 | $2,000.00 | $3,500.00 | $3,688.03 |
| 132 | Fire hydrant assembly (7040-7021) | EACH | 1 | $11,000 | $10,000 | $16,500 | $12,500 | $2,900.00 | $15,502 |
| 133 | San SWR structures (reconstruct EX MH) (7041-7001) | EACH | 4 | $10,000 | $25,500 | $11,000 | $13,000 | $2,500.00 | $6,058.07 |
| 134 | Existing manhole adjustments (7041-7002) | EACH | 2 | $3,000.00 | $3,000.00 | $1,368.00 | $7,500.00 | $1,800.00 | $4,350.88 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.