TxDOT contract A00184386 bid tabulation

Hazard Elimination & Safety, ODOMS LN (On Odoms Rd., From Baker Potts Rd. to 0.18 Miles East of Altas Palmas Rd.). Let by Texas DOT on August 8, 2025, Cameron, Pharr District. 6 bids received; low bid $978,047 by Earthworks Enterprise, -27% against the engineer's estimate of $1,337,871.

Owner
Texas DOT
Letting
08 AUG 2025
Pay items
52
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Earthworks Enterprise$978,047Low-27%
2Rovan Texas, L.L.C.$1,488,577+52%+11%
3Foremost Paving, Inc.$1,691,067+73%+26%
4Artillery L.L.C.$1,697,893+74%+27%
5Ioc Company LLC$1,927,544+97%+44%
6Clore Equipment LLC$2,056,430+110%+54%
TxDOT contract A00184386: bids by rank

Engineer's estimate: $1,337,871.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Earthworks Enterprise2. Rovan Texas, L.L.C.3. Foremost Paving, Inc.4. Artillery L.L.C.5. Ioc Company LLC6. Clore Equipment LLC
1Preparing row (100-7002)STA53$1,200.00$134.00$1,904.80$2,500.00$1,500.00$1,000.00$763.62
2Excavation (roadway) (110-7001)CY5,851$12.40$4.00$12.59$26.90$18.00$10.00$26.81
3Embankment (final)(DC)(type C) (132-7006)CY802$8.87$18.00$17.44$3.00$20.00$15.00$49.61
4Furn & place topsoil (vehicle) (160-7007)CY100$50.53$74.00$63.96$62.20$30.00$40.00$62.29
5Hydro mulch seed (permanent_rural_clay) (164-7018)SY15,031$0.45$0.60$0.53$0.50$1.00$0.46$0.52
6Hydro mulch seed (temporary_warm) (164-7021)SY15,031$0.45$0.40$0.35$0.30$1.00$0.30$0.35
7Vegetative watering (168-7001)TGL96$27.25$29.00$68.55$55.50$40.00$40.00$150.75
8FL BS (roadway del)(type E GR 4)(final pos) (247-7277)CY1,415$40.96$70.00$72.79$59.30$60.00$75.00$64.54
9Geogrid base reinforcement (type 2) (250-7002)SY16,048$1.27$1.10$1.66$2.50$3.00$3.25$2.29
10Lime (com or QK)(slurry) or QK(dry) (260-7001)TON49$521.86$394.00$336.06$388.60$450.00$350.00$324.49
11Lime TRT (existing material)(6") (260-7006)SY16,048$9.27$2.17$2.42$3.50$2.00$5.00$6.21
12Cement (275-7001)TON78$205.49$226.00$201.90$254.10$200.00$200.00$230.77
13Cement TRT (existing material & new base)(6") (275-7006)SY16,048$2.52$1.01$3.37$6.40$3.00$5.00$13.29
14Prime coat (AE-P) (310-7001)GAL2,686$8.83$4.50$5.60$6.20$10.00$6.00$19.82
15D-GR HMA type D sac-B PG64-22 (341-7045)TON1,530$110.00$118.00$124.56$152.70$200.00$210.00$135.94
16Struct excavation (special) (400-7005)CY5$73.50$88.00$150.00$130.00$150.00$425.00$174.32
17Cut & restoring pavement (400-7006)SY213$85.00$30.00$72.09$100.00$200.00$180.00$48.58
18Cem stabil BKFL (400-7010)CY10$96.50$88.00$120.00$195.00$150.00$200.00$311.16
19Trench excavation protection (402-7001)LF61$2.71$4.50$10.00$1.00$20.00$5.00$116.50
20RC pipe (CL III)(18 in) (464-7003)LF1,219$118.23$96.00$71.37$128.00$140.00$145.13$111.66
21RC pipe (CL III)(24 in) (464-7005)LF32$97.66$110.00$83.65$140.00$150.00$272.21$171.54
22RC pipe (CL V)(18 in) (464-7032)LF180$130.62$109.00$85.62$170.00$150.00$290.42$144.58
23Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH4$5,500.00$6,488.05$7,000.00$7,000.00$7,369.63$8,801.02
24Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH10$1,796.91$970.00$1,684.64$1,100.00$1,500.00$3,074.28$3,890.95
25Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH4$1,900.00$1,042.00$1,415.01$1,390.00$2,000.00$3,667.33$3,890.95
26Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH68$1,579.72$1,042.00$1,415.00$1,390.00$1,500.00$1,883.90$2,920.37
27Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$2,600.00$1,300.00$1,784.96$1,300.00$2,000.00$3,930.60$4,107.38
28Removing structure (set) (496-7004)EACH2$561.88$288.00$882.78$600.00$1,000.00$750.00$949.96
29Removing structure (pipe) (496-7007)LF780$13.88$20.50$23.60$20.00$10.00$40.00$31.73
30Mobilization (500-7001)LS1$99,102$100,000$276,568$135,000$175,000$200,000$195,361
31Barricades, signs and traffic handling (502-7001)MO12$4,000.00$2,051.00$6,468.74$6,009.90$6,000.00$3,904.95$9,742.50
32TMA (stationary) (505-7001)DAY10$45.00$97.00$552.81$629.60$500.00$268.53$820.81
33Rock filter dams (install) (type 2) (506-7002)LF13$393.00$359.33$310.00$100.00$310.00$351.81
34Rock filter dams (remove) (506-7011)LF13$213.00$193.48$170.00$50.00$170.00$189.44
35Construction exits (install) (type 2) (506-7021)SY858$28.05$12.00$28.75$30.20$30.00$60.61$20.05
36Construction exits (remove) (506-7024)SY858$8.92$6.00$12.19$18.00$10.00$30.54$4.14
37Temporary sediment control fence (install) (506-7039)LF707$6.05$6.00$5.25$4.70$10.00$4.65$5.14
38Temporary sediment control fence (remove) (506-7041)LF707$2.25$3.00$2.49$2.20$3.00$2.15$2.44
39Biodegradable erosion control logs (install) (12") (506-7044)LF120$10.00$8.84$10.80$8.00$10.75$8.66
40Biodegradable erosion control logs (remove) (506-7046)LF120$5.00$4.42$5.90$3.00$5.90$4.33
41Driveways (ACP) (530-7010)SY1,347$69.75$27.00$52.49$94.00$80.00$140.44$97.50
42Mailbox install-S (TWW-post) type 4 (560-7008)EACH17$267.11$393.00$374.19$325.00$250.00$525.00$568.31
43Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH7$926.71$1,026.00$978.65$850.00$1,200.00$985.00$1,173.39
44Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH4$857.43$1,147.00$1,093.79$950.00$1,200.00$1,200.00$1,369.95
45Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$1,046.32$1,237.00$1,180.14$1,025.00$1,200.00$1,600.00$1,173.39
46Remove SM RD SN sup&AM (644-7073)EACH6$124.15$302.00$287.84$250.00$850.00$150.00$827.93
47Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH6$90.20$67.00$63.33$55.00$1,000.00$150.00$59.56
48Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF71$8.86$18.00$19.90$14.80$8.00$16.08$19.49
49Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF10,176$0.84$1.25$0.93$1.00$1.50$1.03$0.91
50Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF770$0.66$1.50$2.76$1.20$1.50$1.30$2.71
51Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF4,314$0.85$1.25$1.38$1.00$1.50$1.03$1.35
52Reflectorized pavement marker type II-A-A (672-7004)EACH84$6.68$8.00$27.64$5.80$15.00$6.30$27.06
TxDOT contract A00184386: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy