TxDOT contract A00199485 bid tabulation
Bicycle And Pedestrian Improvements, STENGER ST (Business 77 West to Fannin St.). Let by Texas DOT on August 7, 2025, Cameron, Pharr District. 8 bids received; low bid $1,627,355 by Earthworks Enterprise, -16% against the engineer's estimate of $1,926,659.
- Owner
- Texas DOT
- Letting
- 07 AUG 2025
- Pay items
- 88
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Earthworks Enterprise | $1,627,355 | Low | -16% |
| 2 | Lucania Contractors LLC | $1,753,152 | +8.0% | -9.0% |
| 3 | Asago, LLC | $1,783,266 | +10% | -7.0% |
| 4 | Artillery L.L.C. | $1,949,780 | +20% | +1.0% |
| 5 | Texas Cordia Construction, LLC | $2,254,598 | +39% | +17% |
| 6 | Clore Equipment LLC | $2,338,468 | +44% | +21% |
| 7 | P & C Oil Field Service LLC | $2,879,209 | +77% | +49% |
| 8 | Foremost Paving, Inc. | $3,376,913 | +108% | +75% |
Engineer's estimate: $1,926,659.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Earthworks Enterprise | 2. Lucania Contractors LLC | 3. Asago, LLC | 4. Artillery L.L.C. | 5. Texas Cordia Construction, LLC | 6. Clore Equipment LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 55 | $1,000.00 | $398.00 | $385.00 | $1,200.00 | $1,000.00 | $1,000.00 | $406.78 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 1,107 | $17.50 | $13.50 | $20.00 | $14.00 | $20.00 | $10.00 | $28.13 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 1,790 | $10.00 | $13.50 | $20.00 | $10.00 | $18.00 | $10.00 | $22.46 |
| 4 | Removing concrete (curb) (104-7016) | LF | 428 | $15.00 | $7.25 | $10.00 | $9.00 | $12.00 | $10.00 | $17.43 |
| 5 | Removing concrete (curb & gutter) (104-7017) | LF | 918 | $50.00 | $7.25 | $10.00 | $11.00 | $15.00 | $10.00 | $17.08 |
| 6 | Removing concrete (gutter) (104-7019) | LF | 709 | $5.00 | $7.25 | $10.00 | $12.00 | $15.00 | $20.00 | $17.17 |
| 7 | Excavation (roadway) (110-7001) | CY | 1,307 | $8.00 | $3.00 | $17.00 | $9.00 | $20.00 | $30.00 | $24.17 |
| 8 | Excavation (channel) (110-7002) | CY | 200 | $8.00 | $14.00 | $75.00 | $50.00 | $50.00 | $142.16 | |
| 9 | Embankment (final)(DC)(type C) (132-7006) | CY | 356 | $9.60 | $30.00 | $25.00 | $22.00 | $20.00 | $30.00 | $89.51 |
| 10 | Embankment (final)(DC)(type E) (132-7033) | CY | 700 | $30.00 | $20.00 | $17.00 | $25.00 | $40.00 | $55.68 | |
| 11 | Furn & place topsoil (4") (160-7002) | SY | 7,864 | $1.40 | $7.25 | $3.00 | $1.20 | $4.00 | $4.00 | $3.95 |
| 12 | Drill seed (permanent_urban_clay) (164-7012) | SY | 8,084 | $1.00 | $1.00 | $0.90 | $0.63 | $1.00 | $0.50 | $0.81 |
| 13 | Drill seed (temporary_cool) (164-7014) | SY | 670 | $3.00 | $2.70 | $4.85 | $1.00 | $0.50 | $6.77 | |
| 14 | Vegetative watering (168-7001) | TGL | 230 | $35.00 | $45.00 | $25.00 | $15.00 | $35.00 | $50.00 | $130.99 |
| 15 | FL BS (compacted in place)(type E GR 4) (10") (247-7108) | SY | 369 | $19.00 | $40.00 | $37.00 | $25.00 | $35.00 | $98.89 | |
| 16 | FL BS (compacted in place)(type E GR 4) (12") (247-7131) | SY | 369 | $23.25 | $44.00 | $44.00 | $30.00 | $40.00 | $101.90 | |
| 17 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 63 | $41.00 | $64.00 | $100.00 | $115.00 | $50.00 | $110.00 | $177.18 |
| 18 | Geogrid base reinforcement (type 2) (250-7002) | SY | 369 | $4.00 | $2.50 | $4.00 | $5.00 | $12.00 | $12.14 | |
| 19 | Lime (com or QK)(slurry) (260-7005) | TON | 176 | $300.00 | $370.00 | $378.00 | $325.00 | $350.00 | $350.00 | $366.90 |
| 20 | Lime TRT (existing material)(8") (260-7007) | SY | 6,166 | $7.00 | $2.00 | $9.50 | $6.50 | $3.00 | $10.00 | $7.28 |
| 21 | Lime TRT (existing material)(12") (260-7009) | SY | 227 | $8.00 | $2.00 | $30.00 | $22.00 | $4.00 | $20.00 | $40.41 |
| 22 | Lime TRT (new base)(10") (260-7016) | SY | 227 | $6.00 | $2.00 | $30.00 | $15.00 | $5.00 | $20.00 | $40.41 |
| 23 | Lime TRT (subgrade)(12") (260-7026) | SY | 19 | $2.00 | $50.00 | $250.00 | $5.00 | $120.00 | $296.53 | |
| 24 | Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(10") (276-7351) | SY | 8 | $40.00 | $300.00 | $475.00 | $50.00 | $550.00 | $594.75 | |
| 25 | Aggregate(type-D GR-4 sac-B)material & haul (302-7008) | CY | 3.10 | $307.00 | $500.00 | $1,200.00 | $100.00 | $3,000.00 | $406.33 | |
| 26 | Prime coat (MC-30) (310-7004) | GAL | 37.40 | $90.00 | $5.25 | $10.00 | $60.00 | $20.00 | $45.00 | $24.16 |
| 27 | Asphalt (AC-10-2TR) (316-7004) | GAL | 118 | $4.00 | $10.00 | $20.00 | $30.00 | $25.00 | $18.03 | |
| 28 | D-GR HMA type D sac-A PG76-22 (341-7057) | TON | 76 | $160.00 | $150.00 | $255.00 | $250.00 | $200.00 | $125.00 | $162.40 |
| 29 | Struct excavation (special) (400-7005) | CY | 68 | $115.00 | $65.00 | $165.00 | $100.00 | $130.00 | $33.44 | |
| 30 | Trench excavation protection (402-7001) | LF | 307 | $3.50 | $11.00 | $4.00 | $10.00 | $15.00 | $23.15 | |
| 31 | Class C concrete (rail foundation) (420-7052) | CY | 2 | $700.00 | $402.00 | $900.00 | $2,200.00 | $2,000.00 | $4,500.00 | $630.38 |
| 32 | Class C concrete (collar) (420-7061) | EACH | 5 | $1,300.00 | $1,600.00 | $3,500.00 | $2,500.00 | $3,000.00 | $2,120.57 | |
| 33 | Riprap (concrete)(4 in) (432-7001) | CY | 23 | $1,200.00 | $390.00 | $550.00 | $650.00 | $350.00 | $1,200.00 | $480.90 |
| 34 | Riprap (concrete)(5 in) (432-7002) | CY | 95 | $400.00 | $570.00 | $550.00 | $400.00 | $1,500.00 | $380.87 | |
| 35 | Riprap (mow strip)(4 in) (432-7013) | CY | 29 | $390.00 | $480.00 | $550.00 | $600.00 | $1,100.00 | $335.95 | |
| 36 | Rail (type T223) (450-7008) | LF | 30 | $190.00 | $280.00 | $650.00 | $400.00 | $1,100.00 | $145.91 | |
| 37 | Rail (type PR11) (450-7044) | LF | 30 | $200.00 | $214.00 | $400.00 | $350.00 | $400.00 | $1,050.00 | $385.28 |
| 38 | Concrete box culvert (12 FT X 9 FT) (462-7052) | LF | 116 | $2,500.00 | $2,050.00 | $1,650.00 | $4,000.00 | $2,100.00 | $1,983.31 | |
| 39 | RC pipe (CL III)(12 in) (464-7001) | LF | 57 | $105.00 | $90.00 | $90.00 | $130.00 | $120.00 | $137.22 | |
| 40 | RC pipe (CL III)(36 in) (464-7009) | LF | 14 | $350.00 | $340.00 | $350.00 | $405.00 | $350.00 | $345.31 | |
| 41 | RC pipe (CL III)(48 in) (464-7011) | LF | 10 | $350.00 | $640.00 | $550.00 | $665.00 | $720.00 | $623.64 | |
| 42 | RC pipe (CL III)(60 in) (464-7013) | LF | 14 | $600.00 | $600.00 | $750.00 | $1,000.00 | $830.00 | $578.83 | |
| 43 | Wingwall (FW - 0) (HW=12 FT) (466-7154) | EACH | 1 | $22,000 | $30,000 | $28,000 | $25,000 | $35,820 | $33,654 | |
| 44 | Wingwall (PW - 1) (HW=13 FT) (466-7183) | EACH | 1 | $24,000 | $31,000 | $42,000 | $30,000 | $51,240 | $33,704 | |
| 45 | Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292) | EACH | 1 | $1,800.00 | $1,200.00 | $2,000.00 | $3,000.00 | $1,530.00 | $1,556.42 | |
| 46 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $17,000 | $30,000 | $100,000 | $50,000 | $64,390 | $56,935 | |
| 47 | Mobilization (500-7001) | LS | 1 | $154,870 | $30,000 | $116,000 | $175,000 | $100,000 | $200,000 | $222,154 |
| 48 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $5,000.00 | $2,400.00 | $3,400.00 | $6,000.00 | $2,500.00 | $200.00 | $5,629.00 |
| 49 | Portable changeable message sign (503-7001) | DAY | 280 | $50.00 | $105.00 | $40.00 | $70.00 | $50.00 | $40.00 | $81.19 |
| 50 | Construction exits (install) (type 2) (506-7021) | SY | 156 | $18.00 | $30.00 | $30.00 | $25.00 | $20.00 | $37.88 | |
| 51 | Construction exits (remove) (506-7024) | SY | 156 | $9.00 | $9.00 | $10.00 | $15.00 | $20.00 | $11.37 | |
| 52 | Temporary sediment control fence (install) (506-7039) | LF | 5,302 | $4.00 | $5.50 | $4.00 | $7.00 | $3.00 | $4.00 | $4.15 |
| 53 | Temporary sediment control fence (remove) (506-7041) | LF | 5,302 | $1.25 | $2.00 | $1.00 | $0.50 | $1.50 | $1.00 | $1.90 |
| 54 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 142 | $2.50 | $14.00 | $4.00 | $10.00 | $8.00 | $3.00 | $10.09 |
| 55 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 46 | $8.00 | $14.00 | $5.00 | $20.00 | $10.00 | $3.00 | $19.03 |
| 56 | Biodegradable erosion control logs (remove) (506-7046) | LF | 187 | $2.00 | $7.23 | $1.50 | $1.00 | $2.00 | $3.00 | $6.64 |
| 57 | Concrete curb (type II) (529-7002) | LF | 190 | $13.00 | $43.00 | $30.00 | $25.00 | $25.00 | $70.00 | $54.14 |
| 58 | Concrete curb & gutter (type II) (529-7009) | LF | 1,760 | $21.00 | $43.00 | $28.00 | $26.00 | $35.00 | $30.00 | $58.22 |
| 59 | Concrete C&G (valley gutter) (529-7019) | LF | 331 | $56.00 | $43.00 | $98.00 | $40.00 | $35.00 | $70.00 | $120.82 |
| 60 | Intersections (ACP) (530-7002) | SY | 416 | $70.00 | $40.00 | $95.00 | $85.00 | $80.00 | $60.00 | $99.98 |
| 61 | Driveways (concrete) (530-7006) | SY | 1,067 | $100.00 | $79.00 | $85.00 | $65.00 | $90.00 | $130.00 | $98.27 |
| 62 | Driveways (ACP) (530-7010) | SY | 506 | $38.00 | $40.00 | $85.00 | $65.00 | $70.00 | $50.00 | $76.12 |
| 63 | Concrete sidewalks (4") (531-7001) | SY | 336 | $51.00 | $72.00 | $75.00 | $55.00 | $54.00 | $80.00 | $100.36 |
| 64 | Curb ramps (type 1) (531-7005) | EACH | 3 | $2,200.00 | $1,870.00 | $1,950.00 | $1,750.00 | $2,000.00 | $2,220.00 | $2,407.13 |
| 65 | Curb ramps (type 7) (531-7010) | EACH | 30 | $2,900.00 | $1,870.00 | $1,950.00 | $1,750.00 | $2,000.00 | $2,370.00 | $3,044.22 |
| 66 | Concrete sidewalks (special) (531-7025) | SY | 3,718 | $100.00 | $75.00 | $68.00 | $55.00 | $63.00 | $90.00 | $97.43 |
| 67 | Metal W-beam guard fence (timber post) (540-7001) | LF | 250 | $34.00 | $32.00 | $35.00 | $35.00 | $30.00 | $36.28 | |
| 68 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,700.00 | $1,600.00 | $2,000.00 | $2,500.00 | $1,970.00 | $2,420.14 | |
| 69 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,750.00 | $1,800.00 | $2,750.00 | $2,000.00 | $1,500.00 | $1,549.48 | |
| 70 | Remove metal beam guard fence (542-7001) | LF | 280 | $3.61 | $10.00 | $50.00 | $6.00 | $20.00 | $5.19 | |
| 71 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $8,500.00 | $4,200.00 | $4,200.00 | $4,000.00 | $3,530.00 | $3,914.75 | |
| 72 | Aluminum signs (type A) (636-7001) | SF | 41 | $40.00 | $37.00 | $55.00 | $17.00 | $50.00 | $50.00 | $24.36 |
| 73 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 36 | $1,000.00 | $1,180.00 | $720.00 | $750.00 | $1,000.00 | $970.00 | $817.29 |
| 74 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 10 | $1,200.00 | $1,250.00 | $800.00 | $1,100.00 | $1,000.00 | $630.00 | $1,055.44 |
| 75 | Remove SM RD SN sup&AM (644-7073) | EACH | 17 | $300.00 | $300.00 | $200.00 | $130.00 | $350.00 | $150.00 | $108.25 |
| 76 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 6 | $18.00 | $50.00 | $100.00 | $25.00 | $20.00 | $26.52 | |
| 77 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 9 | $61.00 | $50.00 | $88.00 | $75.00 | $30.00 | $32.48 | |
| 78 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 642 | $12.00 | $15.00 | $14.25 | $6.12 | $7.00 | $20.00 | $7.04 |
| 79 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $350.00 | $336.00 | $204.00 | $250.00 | $350.00 | $243.57 | |
| 80 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1 | $350.00 | $336.00 | $408.00 | $500.00 | $350.00 | $460.06 | |
| 81 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 183 | $3.37 | $3.50 | $1.38 | $1.50 | $3.00 | $1.62 | |
| 82 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 62 | $3.37 | $3.50 | $1.38 | $1.50 | $3.00 | $1.62 | |
| 83 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 121 | $3.37 | $3.50 | $1.38 | $1.50 | $3.00 | $1.62 | |
| 84 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 422 | $2.00 | $3.37 | $3.50 | $0.92 | $1.25 | $3.00 | $1.08 |
| 85 | Reflectorized pavement marking type I (Y)4"(broken)(100MIL) (666-7414) | LF | 514 | $2.00 | $3.37 | $3.50 | $0.92 | $1.50 | $3.00 | $1.08 |
| 86 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 1,351 | $2.00 | $3.37 | $3.50 | $0.92 | $1.50 | $3.00 | $1.08 |
| 87 | Pre PM type B(BL&WH)(acc PRK)(W/bordr)LG (668-7067) | EACH | 1 | $1,200.00 | $520.00 | $500.00 | $285.60 | $350.00 | $520.00 | $324.75 |
| 88 | Bird exclusion method (5029-7001) | SF | 2,800 | $8.43 | $2.50 | $1.00 | $10.00 | $4.00 | $10.83 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way