TxDOT contract A00199485 bid tabulation

Bicycle And Pedestrian Improvements, STENGER ST (Business 77 West to Fannin St.). Let by Texas DOT on August 7, 2025, Cameron, Pharr District. 8 bids received; low bid $1,627,355 by Earthworks Enterprise, -16% against the engineer's estimate of $1,926,659.

Owner
Texas DOT
Letting
07 AUG 2025
Pay items
88
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Earthworks Enterprise$1,627,355Low-16%
2Lucania Contractors LLC$1,753,152+8.0%-9.0%
3Asago, LLC$1,783,266+10%-7.0%
4Artillery L.L.C.$1,949,780+20%+1.0%
5Texas Cordia Construction, LLC$2,254,598+39%+17%
6Clore Equipment LLC$2,338,468+44%+21%
7P & C Oil Field Service LLC$2,879,209+77%+49%
8Foremost Paving, Inc.$3,376,913+108%+75%
TxDOT contract A00199485: bids by rank

Engineer's estimate: $1,926,659.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Earthworks Enterprise2. Lucania Contractors LLC3. Asago, LLC4. Artillery L.L.C.5. Texas Cordia Construction, LLC6. Clore Equipment LLC
1Preparing row (100-7002)STA55$1,000.00$398.00$385.00$1,200.00$1,000.00$1,000.00$406.78
2Removing concrete (driveways) (104-7011)SY1,107$17.50$13.50$20.00$14.00$20.00$10.00$28.13
3Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY1,790$10.00$13.50$20.00$10.00$18.00$10.00$22.46
4Removing concrete (curb) (104-7016)LF428$15.00$7.25$10.00$9.00$12.00$10.00$17.43
5Removing concrete (curb & gutter) (104-7017)LF918$50.00$7.25$10.00$11.00$15.00$10.00$17.08
6Removing concrete (gutter) (104-7019)LF709$5.00$7.25$10.00$12.00$15.00$20.00$17.17
7Excavation (roadway) (110-7001)CY1,307$8.00$3.00$17.00$9.00$20.00$30.00$24.17
8Excavation (channel) (110-7002)CY200$8.00$14.00$75.00$50.00$50.00$142.16
9Embankment (final)(DC)(type C) (132-7006)CY356$9.60$30.00$25.00$22.00$20.00$30.00$89.51
10Embankment (final)(DC)(type E) (132-7033)CY700$30.00$20.00$17.00$25.00$40.00$55.68
11Furn & place topsoil (4") (160-7002)SY7,864$1.40$7.25$3.00$1.20$4.00$4.00$3.95
12Drill seed (permanent_urban_clay) (164-7012)SY8,084$1.00$1.00$0.90$0.63$1.00$0.50$0.81
13Drill seed (temporary_cool) (164-7014)SY670$3.00$2.70$4.85$1.00$0.50$6.77
14Vegetative watering (168-7001)TGL230$35.00$45.00$25.00$15.00$35.00$50.00$130.99
15FL BS (compacted in place)(type E GR 4) (10") (247-7108)SY369$19.00$40.00$37.00$25.00$35.00$98.89
16FL BS (compacted in place)(type E GR 4) (12") (247-7131)SY369$23.25$44.00$44.00$30.00$40.00$101.90
17FL BS (roadway del)(type E GR 4)(final pos) (247-7277)CY63$41.00$64.00$100.00$115.00$50.00$110.00$177.18
18Geogrid base reinforcement (type 2) (250-7002)SY369$4.00$2.50$4.00$5.00$12.00$12.14
19Lime (com or QK)(slurry) (260-7005)TON176$300.00$370.00$378.00$325.00$350.00$350.00$366.90
20Lime TRT (existing material)(8") (260-7007)SY6,166$7.00$2.00$9.50$6.50$3.00$10.00$7.28
21Lime TRT (existing material)(12") (260-7009)SY227$8.00$2.00$30.00$22.00$4.00$20.00$40.41
22Lime TRT (new base)(10") (260-7016)SY227$6.00$2.00$30.00$15.00$5.00$20.00$40.41
23Lime TRT (subgrade)(12") (260-7026)SY19$2.00$50.00$250.00$5.00$120.00$296.53
24Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(10") (276-7351)SY8$40.00$300.00$475.00$50.00$550.00$594.75
25Aggregate(type-D GR-4 sac-B)material & haul (302-7008)CY3.10$307.00$500.00$1,200.00$100.00$3,000.00$406.33
26Prime coat (MC-30) (310-7004)GAL37.40$90.00$5.25$10.00$60.00$20.00$45.00$24.16
27Asphalt (AC-10-2TR) (316-7004)GAL118$4.00$10.00$20.00$30.00$25.00$18.03
28D-GR HMA type D sac-A PG76-22 (341-7057)TON76$160.00$150.00$255.00$250.00$200.00$125.00$162.40
29Struct excavation (special) (400-7005)CY68$115.00$65.00$165.00$100.00$130.00$33.44
30Trench excavation protection (402-7001)LF307$3.50$11.00$4.00$10.00$15.00$23.15
31Class C concrete (rail foundation) (420-7052)CY2$700.00$402.00$900.00$2,200.00$2,000.00$4,500.00$630.38
32Class C concrete (collar) (420-7061)EACH5$1,300.00$1,600.00$3,500.00$2,500.00$3,000.00$2,120.57
33Riprap (concrete)(4 in) (432-7001)CY23$1,200.00$390.00$550.00$650.00$350.00$1,200.00$480.90
34Riprap (concrete)(5 in) (432-7002)CY95$400.00$570.00$550.00$400.00$1,500.00$380.87
35Riprap (mow strip)(4 in) (432-7013)CY29$390.00$480.00$550.00$600.00$1,100.00$335.95
36Rail (type T223) (450-7008)LF30$190.00$280.00$650.00$400.00$1,100.00$145.91
37Rail (type PR11) (450-7044)LF30$200.00$214.00$400.00$350.00$400.00$1,050.00$385.28
38Concrete box culvert (12 FT X 9 FT) (462-7052)LF116$2,500.00$2,050.00$1,650.00$4,000.00$2,100.00$1,983.31
39RC pipe (CL III)(12 in) (464-7001)LF57$105.00$90.00$90.00$130.00$120.00$137.22
40RC pipe (CL III)(36 in) (464-7009)LF14$350.00$340.00$350.00$405.00$350.00$345.31
41RC pipe (CL III)(48 in) (464-7011)LF10$350.00$640.00$550.00$665.00$720.00$623.64
42RC pipe (CL III)(60 in) (464-7013)LF14$600.00$600.00$750.00$1,000.00$830.00$578.83
43Wingwall (FW - 0) (HW=12 FT) (466-7154)EACH1$22,000$30,000$28,000$25,000$35,820$33,654
44Wingwall (PW - 1) (HW=13 FT) (466-7183)EACH1$24,000$31,000$42,000$30,000$51,240$33,704
45Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292)EACH1$1,800.00$1,200.00$2,000.00$3,000.00$1,530.00$1,556.42
46Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$17,000$30,000$100,000$50,000$64,390$56,935
47Mobilization (500-7001)LS1$154,870$30,000$116,000$175,000$100,000$200,000$222,154
48Barricades, signs and traffic handling (502-7001)MO9$5,000.00$2,400.00$3,400.00$6,000.00$2,500.00$200.00$5,629.00
49Portable changeable message sign (503-7001)DAY280$50.00$105.00$40.00$70.00$50.00$40.00$81.19
50Construction exits (install) (type 2) (506-7021)SY156$18.00$30.00$30.00$25.00$20.00$37.88
51Construction exits (remove) (506-7024)SY156$9.00$9.00$10.00$15.00$20.00$11.37
52Temporary sediment control fence (install) (506-7039)LF5,302$4.00$5.50$4.00$7.00$3.00$4.00$4.15
53Temporary sediment control fence (remove) (506-7041)LF5,302$1.25$2.00$1.00$0.50$1.50$1.00$1.90
54Biodegradable erosion control logs (install) (6") (506-7042)LF142$2.50$14.00$4.00$10.00$8.00$3.00$10.09
55Biodegradable erosion control logs (install) (12") (506-7044)LF46$8.00$14.00$5.00$20.00$10.00$3.00$19.03
56Biodegradable erosion control logs (remove) (506-7046)LF187$2.00$7.23$1.50$1.00$2.00$3.00$6.64
57Concrete curb (type II) (529-7002)LF190$13.00$43.00$30.00$25.00$25.00$70.00$54.14
58Concrete curb & gutter (type II) (529-7009)LF1,760$21.00$43.00$28.00$26.00$35.00$30.00$58.22
59Concrete C&G (valley gutter) (529-7019)LF331$56.00$43.00$98.00$40.00$35.00$70.00$120.82
60Intersections (ACP) (530-7002)SY416$70.00$40.00$95.00$85.00$80.00$60.00$99.98
61Driveways (concrete) (530-7006)SY1,067$100.00$79.00$85.00$65.00$90.00$130.00$98.27
62Driveways (ACP) (530-7010)SY506$38.00$40.00$85.00$65.00$70.00$50.00$76.12
63Concrete sidewalks (4") (531-7001)SY336$51.00$72.00$75.00$55.00$54.00$80.00$100.36
64Curb ramps (type 1) (531-7005)EACH3$2,200.00$1,870.00$1,950.00$1,750.00$2,000.00$2,220.00$2,407.13
65Curb ramps (type 7) (531-7010)EACH30$2,900.00$1,870.00$1,950.00$1,750.00$2,000.00$2,370.00$3,044.22
66Concrete sidewalks (special) (531-7025)SY3,718$100.00$75.00$68.00$55.00$63.00$90.00$97.43
67Metal W-beam guard fence (timber post) (540-7001)LF250$34.00$32.00$35.00$35.00$30.00$36.28
68Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,700.00$1,600.00$2,000.00$2,500.00$1,970.00$2,420.14
69Downstream anchor terminal section (540-7015)EACH2$1,750.00$1,800.00$2,750.00$2,000.00$1,500.00$1,549.48
70Remove metal beam guard fence (542-7001)LF280$3.61$10.00$50.00$6.00$20.00$5.19
71Guardrail end treatment (install) (544-7001)EACH2$8,500.00$4,200.00$4,200.00$4,000.00$3,530.00$3,914.75
72Aluminum signs (type A) (636-7001)SF41$40.00$37.00$55.00$17.00$50.00$50.00$24.36
73Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH36$1,000.00$1,180.00$720.00$750.00$1,000.00$970.00$817.29
74Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH10$1,200.00$1,250.00$800.00$1,100.00$1,000.00$630.00$1,055.44
75Remove SM RD SN sup&AM (644-7073)EACH17$300.00$300.00$200.00$130.00$350.00$150.00$108.25
76Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH6$18.00$50.00$100.00$25.00$20.00$26.52
77Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH9$61.00$50.00$88.00$75.00$30.00$32.48
78Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF642$12.00$15.00$14.25$6.12$7.00$20.00$7.04
79Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH2$350.00$336.00$204.00$250.00$350.00$243.57
80Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH1$350.00$336.00$408.00$500.00$350.00$460.06
81All-wther PM type I (W)6"(solid)(100MIL) (666-7309)LF183$3.37$3.50$1.38$1.50$3.00$1.62
82All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF62$3.37$3.50$1.38$1.50$3.00$1.62
83All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF121$3.37$3.50$1.38$1.50$3.00$1.62
84Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405)LF422$2.00$3.37$3.50$0.92$1.25$3.00$1.08
85Reflectorized pavement marking type I (Y)4"(broken)(100MIL) (666-7414)LF514$2.00$3.37$3.50$0.92$1.50$3.00$1.08
86Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417)LF1,351$2.00$3.37$3.50$0.92$1.50$3.00$1.08
87Pre PM type B(BL&WH)(acc PRK)(W/bordr)LG (668-7067)EACH1$1,200.00$520.00$500.00$285.60$350.00$520.00$324.75
88Bird exclusion method (5029-7001)SF2,800$8.43$2.50$1.00$10.00$4.00$10.83
TxDOT contract A00199485: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy