TxDOT contract A00218396 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, FM0897 (Various locations to Fannin and Hopkins County). Let by Texas DOT on August 20, 2026, Fannin, Paris District. 8 bids received; low bid $538,294 by Gibson & Associates, Inc., -25% against the engineer's estimate of $714,058.
- Owner
- Texas DOT
- Letting
- 20 AUG 2026
- Pay items
- 25
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gibson & Associates, Inc. | $538,294 | Low | -25% |
| 2 | The Truesdell Corporation | $575,575 | +7.0% | -19% |
| 3 | Structural Integrity Group LLC | $575,949 | +7.0% | -19% |
| 4 | Winding Road Construction, Inc. | $595,549 | +11% | -17% |
| 5 | Garret Shields Infrastructure | $617,710 | +15% | -13% |
| 6 | Cross Plus Construction, LLC | $667,005 | +24% | -7.0% |
| 7 | Highway 19 Construction LLC | $699,368 | +30% | -2.0% |
| 8 | Rear Contractors LLC | $954,581 | +77% | +34% |
Engineer's estimate: $714,058.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Gibson & Associates, Inc. | 2. The Truesdell Corporation | 3. Structural Integrity Group LLC | 4. Winding Road Construction, Inc. | 5. Garret Shields Infrastructure | 6. Cross Plus Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 94 | $75.00 | $40.00 | $125.00 | $70.00 | $94.00 | $40.00 | $55.00 |
| 2 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 5 | $300.00 | $500.00 | $150.00 | $1,210.00 | $500.00 | $200.00 | $220.00 |
| 3 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 20 | $300.00 | $360.00 | $175.00 | $852.00 | $250.00 | $200.00 | $275.00 |
| 4 | Riprap (stone protection)(18 in) (432-7043) | CY | 200 | $250.00 | $332.00 | $225.00 | $312.00 | $265.00 | $200.00 | $330.00 |
| 5 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 484 | $50.00 | $52.00 | $44.00 | $45.00 | $29.75 | $50.00 | $44.00 |
| 6 | Multi-layer polymer overlay (439-7014) | SY | 5,378 | $55.00 | $33.75 | $42.00 | $40.00 | $43.50 | $50.00 | $44.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $54,349 | $56,000 | $131,696 | $56,000 | $25,000 | $50,000 | $55,000 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $5,750.00 | $12,000 | $3,000.00 | $10,000 | $8,000.00 | $5,000.00 | $5,500.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 45 | $175.00 | $104.00 | $100.00 | $200.00 | $375.00 | $100.00 | $275.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 31 | $200.00 | $200.00 | $265.00 | $400.00 | $1,000.00 | $300.00 | $550.00 |
| 11 | One-way traffic control (port traffic signal) (510-7003) | MO | 1 | $10,000 | $7,500.00 | $1,000.00 | $8,750.00 | $8,000.00 | $7,000.00 | $22,000 |
| 12 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 2,900 | $3.00 | $0.72 | $0.75 | $0.70 | $0.72 | $0.80 | $0.86 |
| 13 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 48 | $15.00 | $5.50 | $6.00 | $3.25 | $5.50 | $6.25 | $6.60 |
| 14 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 9,600 | $3.00 | $0.72 | $0.75 | $0.70 | $0.72 | $0.80 | $0.86 |
| 15 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 240 | $2.50 | $11.00 | $11.00 | $6.00 | $11.00 | $12.50 | $13.20 |
| 16 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 291 | $1.50 | $4.00 | $6.50 | $3.00 | $5.00 | $1.25 | $8.99 |
| 17 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 10,600 | $1.35 | $0.83 | $1.00 | $1.25 | $0.83 | $1.00 | $0.99 |
| 18 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 663 | $1.75 | $1.10 | $1.10 | $1.25 | $1.10 | $1.25 | $1.32 |
| 19 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 5,300 | $1.35 | $0.83 | $1.00 | $1.25 | $0.83 | $1.00 | $0.99 |
| 20 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 65 | $5.00 | $11.00 | $11.00 | $10.00 | $11.00 | $12.50 | $13.20 |
| 21 | Eliminating existing PM & markers (6") (677-7002) | LF | 6,250 | $2.75 | $0.61 | $0.75 | $1.65 | $0.60 | $0.70 | $0.73 |
| 22 | Eliminating existing PM & markers (24") (677-7008) | LF | 48 | $10.00 | $5.50 | $10.00 | $7.00 | $5.50 | $6.25 | $6.60 |
| 23 | CNC crack repair (discrete)(gravity) (780-7001) | LF | 4,829 | $30.00 | $21.00 | $14.00 | $17.50 | $27.50 | $30.00 | $33.00 |
| 24 | Mltply PV MK W/wty (W) (6") (solid) (6065-7001) | LF | 2,200 | $3.50 | $3.30 | $3.50 | $1.25 | $3.30 | $3.75 | $3.96 |
| 25 | Mltply PV MK W/wty (Y) (6") (broken) (6065-7005) | LF | 280 | $5.00 | $3.30 | $3.50 | $1.25 | $3.30 | $3.75 | $3.96 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.