TxDOT contract A00193937 bid tabulation
Intersection Improvement, SH 34 (At Abner Rd to .). Let by Texas DOT on September 2, 2026, Kaufman, Dallas District. 7 bids received; low bid $960,753 by Austin Bridge & Road Services, LP, +1.2% against the engineer's estimate of $949,220.
- Owner
- Texas DOT
- Letting
- 02 SEP 2026
- Pay items
- 65
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LP | $960,753 | Low | +1.0% |
| 2 | Highway 19 Construction LLC | $1,077,944 | +12% | +14% |
| 3 | Texas Materials Group, Inc. | $1,146,566 | +19% | +21% |
| 4 | Xit Paving and Construction Inc. | $1,197,303 | +25% | +26% |
| 5 | Quality Excavation, LLC | $1,216,243 | +27% | +28% |
| 6 | Ed Bell Construction Company | $1,519,774 | +58% | +60% |
| 7 | Ragle Construction, Inc. | $1,991,063 | +107% | +110% |
Engineer's estimate: $949,220.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Bridge & Road Services, LP | 2. Highway 19 Construction LLC | 3. Texas Materials Group, Inc. | 4. Xit Paving and Construction Inc. | 5. Quality Excavation, LLC | 6. Ed Bell Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 14.81 | $750.00 | $280.00 | $2,500.00 | $280.00 | $1,700.00 | $1,967.00 | $750.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 628 | $35.00 | $11.77 | $25.00 | $22.89 | $21.00 | $16.25 | $15.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 118 | $20.00 | $31.33 | $25.00 | $76.80 | $34.00 | $19.25 | $30.00 |
| 4 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 976 | $25.00 | $5.00 | $15.00 | $12.37 | $14.00 | $16.96 | $6.00 |
| 5 | Removing stab base and asphalt pavement(0"-16") (105-7129) | SY | 716 | $35.00 | $6.00 | $15.00 | $43.52 | $32.00 | $31.66 | $16.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 734.09 | $20.00 | $20.00 | $15.00 | $17.28 | $28.00 | $15.00 | $15.00 |
| 7 | Subgr widen (OC) (112-7001) | STA | 14.81 | $400.00 | $277.05 | $350.00 | $600.40 | $885.00 | $825.00 | $1,500.00 |
| 8 | Embankment (final)(OC)(type C) (132-7005) | CY | 1,374.88 | $21.00 | $37.75 | $20.00 | $50.81 | $25.00 | $20.00 | $50.00 |
| 9 | Backfill (type A or B) (134-7004) | STA | 14.81 | $200.00 | $388.26 | $500.00 | $776.81 | $2,336.00 | $315.00 | $1,000.00 |
| 10 | Road grader work (ord comp) (152-7001) | STA | 14.81 | $185.00 | $126.95 | $350.00 | $295.24 | $1,500.00 | $610.00 | $1,000.00 |
| 11 | Block sodding (162-7002) | SY | 7,167 | $5.25 | $3.90 | $5.00 | $4.28 | $5.00 | $4.41 | $4.25 |
| 12 | Drill seed (temporary_warm_cool) (164-7015) | SY | 3,583 | $0.25 | $0.34 | $0.30 | $0.53 | $0.50 | $0.39 | $0.36 |
| 13 | Vegetative watering (168-7001) | TGL | 1,601 | $5.25 | $1.00 | $10.00 | $1.00 | $10.00 | $18.00 | $1.00 |
| 14 | FL BS (compacted in place)(type D GR 1-2) (12") (247-7125) | SY | 1,954 | $31.00 | $65.00 | $46.00 | $48.87 | $52.00 | $41.75 | $50.00 |
| 15 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 588 | $4.75 | $6.97 | $10.00 | $6.57 | $1.00 | $9.61 | $2.10 |
| 16 | SP mixes SP-B PG64-22 (344-7001) | TON | 646 | $115.00 | $150.00 | $173.00 | $171.00 | $182.00 | $188.28 | $190.00 |
| 17 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 710 | $120.00 | $150.00 | $182.00 | $160.85 | $172.00 | $175.27 | $175.00 |
| 18 | Tack coat (344-7077) | GAL | 731 | $4.00 | $4.25 | $10.00 | $3.58 | $5.00 | $4.52 | $2.10 |
| 19 | Flexible pavement structure repair(8") (351-7007) | SY | 531 | $75.00 | $98.00 | $145.00 | $94.47 | $176.00 | $108.00 | $110.00 |
| 20 | Plane & text asphalt concrete pavement(0" to 3") (354-7003) | SY | 5,296 | $3.50 | $4.00 | $5.00 | $3.54 | $5.00 | $5.31 | $5.25 |
| 21 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 8 | $200.00 | $400.00 | $350.00 | $400.00 | $550.00 | $305.00 | $600.00 |
| 22 | RC pipe (CL III)(18 in) (464-7003) | LF | 292 | $80.00 | $66.00 | $47.00 | $66.00 | $149.00 | $88.00 | $90.00 |
| 23 | RC pipe (CL III)(24 in) (464-7005) | LF | 56 | $115.00 | $89.00 | $72.00 | $89.00 | $189.00 | $131.00 | $120.00 |
| 24 | RC pipe (CL III)(30 in) (464-7007) | LF | 132 | $145.00 | $135.00 | $100.00 | $135.00 | $209.00 | $149.00 | $180.00 |
| 25 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 15 | $1,300.00 | $1,800.00 | $795.00 | $1,800.00 | $2,095.00 | $1,400.00 | $900.00 |
| 26 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 4 | $2,050.00 | $2,400.00 | $1,250.00 | $2,400.00 | $2,586.00 | $1,700.00 | $1,200.00 |
| 27 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 4 | $3,500.00 | $4,900.00 | $2,500.00 | $4,900.00 | $3,486.00 | $2,525.00 | $3,000.00 |
| 28 | Set (type II) (18") (RCP) (4:1) (P) (467-7474) | EACH | 3 | $1,500.00 | $1,600.00 | $650.00 | $1,600.00 | $1,933.00 | $1,175.00 | $900.00 |
| 29 | Removing structure (set) (496-7004) | EACH | 20 | $500.00 | $175.00 | $500.00 | $175.00 | $840.00 | $220.00 | $250.00 |
| 30 | Removing structure (pipe) (496-7037) | EACH | 13 | $800.00 | $200.00 | $1,000.00 | $200.00 | $865.00 | $875.00 | $400.00 |
| 31 | Mobilization (500-7001) | LS | 1 | $75,800 | $104,000 | $90,000 | $115,000 | $50,000 | $100,000 | $264,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $10,000 | $8,000.00 | $2,000.00 | $16,500 | $2,400.00 | $8,300.00 | $31,500 |
| 33 | Portable changeable message sign (503-7002) | EACH | 4 | $2,000.00 | $1,467.06 | $5,000.00 | $7,000.00 | $7,352.00 | $11,750 | $10,000 |
| 34 | TMA (stationary) (505-7001) | DAY | 123 | $225.00 | $1.00 | $250.00 | $1.00 | $100.00 | $245.00 | $200.00 |
| 35 | TMA (mobile operation) (505-7003) | DAY | 15 | $275.00 | $1.00 | $100.00 | $0.01 | $100.00 | $1,017.71 | $800.00 |
| 36 | Construction exits (install) (type 1) (506-7020) | SY | 79 | $35.00 | $50.40 | $1.00 | $44.00 | $41.00 | $57.00 | $32.40 |
| 37 | Construction exits (remove) (506-7024) | SY | 79 | $12.00 | $15.56 | $1.00 | $15.00 | $18.00 | $17.60 | $16.20 |
| 38 | Temporary sediment control fence (install) (506-7039) | LF | 700 | $4.00 | $4.87 | $4.00 | $5.00 | $4.00 | $5.50 | $3.24 |
| 39 | Temporary sediment control fence (remove) (506-7041) | LF | 700 | $1.25 | $1.25 | $1.00 | $1.00 | $1.00 | $1.41 | $1.62 |
| 40 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 243 | $6.00 | $8.61 | $5.00 | $6.00 | $7.00 | $9.74 | $4.86 |
| 41 | Biodegradable erosion control logs (remove) (506-7046) | LF | 243 | $1.45 | $1.25 | $1.00 | $1.00 | $1.00 | $1.41 | $2.43 |
| 42 | Constructing detours (508-7001) | SY | 378 | $150.00 | $38.35 | $150.00 | $70.93 | $98.00 | $110.00 | $105.00 |
| 43 | Driveways (concrete) (hes) (530-7007) | SY | 153 | $125.00 | $135.00 | $110.00 | $135.00 | $130.00 | $131.00 | $153.00 |
| 44 | Driveways (ACP) (530-7010) | SY | 665 | $70.00 | $70.00 | $75.00 | $79.27 | $106.00 | $115.00 | $100.00 |
| 45 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 2,367 | $0.30 | $0.65 | $5.00 | $0.65 | $5.00 | $1.43 | $0.75 |
| 46 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 9 | $290.00 | $315.00 | $350.00 | $240.00 | $280.00 | $356.20 | $275.00 |
| 47 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 1 | $310.00 | $395.00 | $450.00 | $260.00 | $304.00 | $446.66 | $300.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 20 | $700.00 | $690.00 | $750.00 | $700.00 | $817.00 | $780.24 | $800.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $800.00 | $965.00 | $1,000.00 | $850.00 | $992.00 | $1,091.21 | $950.00 |
| 50 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 2 | $80.00 | $59.00 | $65.00 | $80.00 | $93.00 | $66.72 | $350.00 |
| 51 | Install OM SM RD sign (1-OM-con)Y (658-7079) | EACH | 16 | $160.00 | $30.00 | $750.00 | $20.00 | $23.00 | $33.92 | $175.00 |
| 52 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 1 | $160.00 | $30.00 | $800.00 | $20.00 | $23.00 | $33.93 | $175.00 |
| 53 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 42 | $0.70 | $2.00 | $3.00 | $0.65 | $2.00 | $2.75 | $4.00 |
| 54 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 450 | $0.70 | $2.25 | $3.00 | $0.65 | $2.00 | $2.75 | $4.00 |
| 55 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 275 | $0.90 | $1.60 | $3.00 | $1.60 | $2.00 | $2.26 | $2.43 |
| 56 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 20 | $8.00 | $8.20 | $21.00 | $8.20 | $10.00 | $9.05 | $21.33 |
| 57 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $175.00 | $205.00 | $195.00 | $205.00 | $239.00 | $226.16 | $270.00 |
| 58 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $171.00 | $228.00 | $225.00 | $228.00 | $266.00 | $282.70 | $324.00 |
| 59 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,961 | $0.20 | $0.36 | $1.00 | $0.36 | $0.50 | $2.26 | $0.36 |
| 60 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 2,961 | $0.20 | $0.36 | $1.00 | $0.36 | $0.50 | $2.26 | $0.36 |
| 61 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,837 | $0.40 | $0.72 | $1.00 | $0.72 | $0.75 | $1.13 | $0.78 |
| 62 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 4,476 | $0.32 | $0.72 | $1.50 | $0.72 | $0.75 | $1.13 | $0.78 |
| 63 | Reflectorized pavement marker type I-C (672-7002) | EACH | 16 | $4.00 | $4.75 | $10.00 | $4.75 | $6.00 | $7.92 | $11.00 |
| 64 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 220 | $4.00 | $4.75 | $10.00 | $4.75 | $6.00 | $6.78 | $11.00 |
| 65 | Full - width mowing (730-7019) | CYC | 2 | $2,750.00 | $2,115.54 | $500.00 | $5,000.00 | $1,325.00 | $6,219.34 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.