Talbert Companies LLC: TxDOT bid record

Talbert Companies LLC submitted 65 bids on Texas DOT contracts in the data, from 06 DEC 2023 to 05 MAR 2026, and was the low bidder on 5 of them (8%). When it was not low, its total sat a median +14% above the low bid.

Owner
Texas DOT
Low bid volume
$7,900,853
Latest bid
05 MAR 2026
Data through
19 NOV 2026
65Bids
5Low bids
8Win rate, percent
+14%Median gap to the low bid when not low, 60 bids

By year

YearBidsLow bidsWin rate
2023100%
202426415%
20253213%
2026600%
Talbert Companies LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Paris District1000%
Bryan District600%
Wichita Falls District5120%
Dallas District500%
Waco District500%
Lufkin District5120%
Childress District500%
Fort Worth District400%
Yoakum District400%
Abilene District3133%
Houston District300%
San Angelo District3267%
Talbert Companies LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Prestressed concrete girder (TX28)425-7001LF1714 (82%)$204.74$250.00
Prestressed concrete slab beam (5SB15)425-7019LF1410 (71%)$220.64$265.00
Reinforced concrete slab422-7001SF238 (35%)$29.00$27.00
Class C concrete (column)420-7038CY188 (44%)$1,607.43$1,600.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI)658-7019EACH427 (17%)$37.84$35.00
Drilled shaft (24 in)416-7004LF237 (30%)$246.38$245.78
Cem stabil BKFL400-7010CY436 (14%)$258.75$200.00
Vegetative watering168-7001TGL316 (19%)$62.27$37.73
Drilled shaft (36 in)416-7006LF276 (22%)$310.65$300.00
Vegetative watering168-7001MG236 (26%)$82.50$29.97
Reflectorized pavement marker type II-A-A672-7004EACH226 (27%)$10.43$5.00
Preparing row100-7002STA475 (11%)$4,025.00$2,750.00
Talbert Companies LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Talbert Companies LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 MAR 2026A00195344Paris DistrictBridge Replacement, FM 816 (At Loring Creek Relief to .)7 of 12$2,467,312+18%
05 MAR 2026A00207303Paris DistrictConstruct Pedestrian Infrastructure, Various (Spur 503 to Loy Lake Rd)8 of 11$3,159,690+15%
05 FEB 2026A00194041Dallas DistrictBridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .)9 of 15$1,558,328+27%
05 FEB 2026A00183682Houston DistrictBridge Replacement, C MEYER RD (C Meyer Rd (CR 234) at Bee Creek to .)7 of 9$2,378,260+31%
04 FEB 2026A00134679Houston DistrictBridge Replacement, HOPKINS RD (Hopkins Rd (CR 209) at Turkey Creek to .)7 of 13$3,372,646+21%
04 FEB 2026A00198028Paris DistrictConstruct Pedestrian Infrastructure, BU 271B (E Price St to MLK Dr)9 of 13$864,900+19%
05 SEP 2025A00133456Dallas DistrictBridge Replacement, FM 636 (At Willow Creek to .)6 of 8$11,932,161+24%
08 AUG 2025A00129321Austin DistrictBridge Replacement, COUNTY ROAD 143 (On CR 143 at Dry Berry Creek to .)11 of 11$2,519,156+59%
07 AUG 2025A00206379Paris DistrictConstruct Pedestrian Infrastructure, Various (Various to .)2 of 12$530,539+10%
07 AUG 2025A00185701Lufkin DistrictBridge Replacement, COUNTY ROAD 3689 (CR 3689 at Cypress Creek to .)3 of 8$1,854,462+14%
02 JUL 2025A00183414Wichita Falls DistrictBridge Replacement, FM 923 (At Bush Knob Creek to .)2 of 8$737,258+1.0%
02 JUL 2025A00140933Lufkin DistrictBridge Replacement, COUNTY ROAD 4700 (CR 4700 AT LEE CREEK to .)6 of 6$1,699,830+21%
02 JUL 2025A00134449San Angelo DistrictBridge Replacement, COUNTY ROAD 302 (At South Concho river to .)1 of 8$1,387,935Low, 1.0% under the second
02 JUL 2025A00206903Yoakum DistrictConstruct Pedestrian Infrastructure, Various (SH 60 (Milam St) to FM 1301 (Boling Hwy))3 of 8$3,198,881+8.0%
01 JUL 2025A00183298Abilene DistrictBicycle And Pedestrian Improvements, SH 36 (BU 83D to FM 1750)4 of 5$4,711,656+13%
01 JUL 2025A00064769Dallas DistrictBridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .)4 of 13$3,204,607+3.0%
01 JUL 2025A00190867Paris DistrictBridge Replacement, PRESCOTT RD (At Draw to .)9 of 11$3,037,219+32%
01 JUL 2025A00183418Wichita Falls DistrictBridge Replacement, COUNTY ROAD 341 (CR258/Sign CR 341 at Draw to .)5 of 8$2,757,154+13%
01 JUL 2025A00183588Childress DistrictBridge Replacement, FM 94 (@ Draw to .)2 of 7$1,941,370+6.0%
05 JUN 2025A00187707Bryan DistrictConstruct Pedestrian Infrastructure, FM 2818 (0.5 Mi E of FM 2154 to 0.1 mi E of Welsh Ave)4 of 10$1,974,590+10%
05 JUN 2025A00135886Childress DistrictBridge Replacement, COUNTY ROAD 20 (@ Lelia Lake Creek to .)2 of 10$967,864+1.0%
05 JUN 2025A00061098Fort Worth DistrictBridge Replacement, COUNTY ROAD 454 (CR 454 @ Bosque River to .)3 of 9$990,346+14%
04 JUN 2025A00190494Bryan DistrictBicycle And Pedestrian Improvements, FM 908 (US 79 to Milam Ave.)3 of 7$859,937+20%
04 JUN 2025A00180852Waco DistrictBridge Replacement, COUNTY ROAD 203 (0.1 Mi S of Leon River to 0.1 Mi N of Leon River)4 of 11$4,400,553+5.0%
04 JUN 2025A00065080Fort Worth DistrictBridge Replacement, FM 4 (AT WEAVER BRANCH to .)2 of 7$2,879,977+21%
Talbert Companies LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy