TxDOT contract A00133456 bid tabulation
Bridge Replacement, FM 636 (At Willow Creek to .). Let by Texas DOT on September 5, 2025, Navarro, Dallas District. 8 bids received; low bid $9,649,382 by Indus Road & Bridge, Inc., -8.0% against the engineer's estimate of $10,486,887.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 107
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc. | $9,649,382 | Low | -8.0% |
| 2 | Skyline Bridge LLC | $9,894,124 | +3.0% | -6.0% |
| 3 | Highway 19 Construction LLC | $9,974,224 | +3.0% | -5.0% |
| 4 | Hodges and Son Construction Company, Inc. | $11,175,915 | +16% | +7.0% |
| 5 | A. L. Helmcamp, Inc. | $11,812,159 | +22% | +13% |
| 6 | Talbert Companies LLC | $11,932,161 | +24% | +14% |
| 7 | Grey Sky Construction LLC | $11,996,385 | +24% | +14% |
| 8 | Harper Brothers Construction LLC | $12,490,379 | +29% | +19% |
Engineer's estimate: $10,486,887.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Indus Road & Bridge, Inc. | 2. Skyline Bridge LLC | 3. Highway 19 Construction LLC | 4. Hodges and Son Construction Company, Inc. | 5. A. L. Helmcamp, Inc. | 6. Talbert Companies LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 28 | $8,000.00 | $14,000 | $2,000.00 | $5,000.00 | $4,000.00 | $250.00 | $3,300.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 871 | $32.00 | $15.00 | $10.00 | $25.00 | $14.00 | $60.00 | $33.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 5,740 | $25.00 | $18.00 | $18.00 | $20.00 | $10.00 | $11.00 | $22.00 |
| 4 | Embankment (final)(DC)(type C1) (132-7008) | CY | 13,045 | $25.00 | $26.00 | $27.00 | $30.00 | $25.00 | $35.00 | $33.00 |
| 5 | Embankment (final)(DC)(type C2) (132-7010) | CY | 801 | $75.00 | $327.00 | $40.00 | $50.00 | $25.00 | $110.00 | $33.00 |
| 6 | Compost manuf topsoil (4") (161-7002) | SY | 22,220 | $3.00 | $2.20 | $4.00 | $2.00 | $2.00 | $2.00 | $1.08 |
| 7 | Drill seed (permanent_rural_clay) (164-7010) | SY | 22,220 | $0.50 | $0.40 | $0.75 | $0.45 | $0.50 | $0.90 | $0.42 |
| 8 | Drill seed (temporary_warm_cool) (164-7015) | SY | 22,220 | $0.50 | $0.40 | $0.75 | $0.45 | $0.50 | $0.80 | $0.40 |
| 9 | Vegetative watering (168-7001) | TGL | 6,610.90 | $20.00 | $1.00 | $0.25 | $10.00 | $1.00 | $3.00 | $17.60 |
| 10 | FL BS (compacted in place)(type D GR 1-2) (10") (247-7102) | SY | 2,102 | $35.00 | $55.00 | $35.00 | $60.00 | $31.00 | $38.50 | |
| 11 | FL BS (compacted in place)(type D GR 1-2) (12") (247-7125) | SY | 7,651 | $30.00 | $36.00 | $45.00 | $36.00 | $60.00 | $37.00 | $38.50 |
| 12 | FL BS (roadway del)(type D GR 1-2)(final pos) (247-7271) | CY | 1,110 | $100.00 | $96.00 | $100.00 | $85.00 | $85.00 | $120.00 | $289.30 |
| 13 | Rework BS metal (type C)(6")(ord comp) (251-7049) | SY | 2,218 | $3.00 | $6.00 | $14.00 | $10.00 | $25.00 | $9.00 | $22.00 |
| 14 | Rework BS metal (type C)(8")(ord comp) (251-7051) | SY | 5,433 | $7.00 | $10.00 | $5.00 | $25.00 | $4.00 | $33.00 | |
| 15 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 57.22 | $360.00 | $400.00 | $350.00 | $350.00 | $450.00 | $375.22 | |
| 16 | Lime TRT (existing material)(8") (260-7007) | SY | 2,102 | $10.00 | $30.00 | $10.00 | $15.00 | $15.00 | $22.00 | |
| 17 | Cement (275-7001) | TON | 63.80 | $250.00 | $260.00 | $350.00 | $320.00 | $400.00 | $290.00 | $254.84 |
| 18 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 2,218 | $2.50 | $5.00 | $24.00 | $10.00 | $15.00 | $18.00 | $22.00 |
| 19 | Cement TRT (existing material & new base)(8") (275-7007) | SY | 5,433 | $5.50 | $22.00 | $7.00 | $15.00 | $18.00 | $27.50 | |
| 20 | Salvage, haul & stockpile reclaimed asphalt PV (3") (305-7016) | SY | 1,724 | $6.50 | $15.00 | $15.00 | $25.00 | $8.00 | $4.40 | |
| 21 | Prime coat (multi option) (310-7015) | GAL | 411 | $24.00 | $29.00 | $22.00 | $20.00 | $16.00 | $24.20 | |
| 22 | Emuls asphalt (prime)(AE-P) (314-7017) | GAL | 1,531 | $7.00 | $28.00 | $31.00 | $25.00 | $15.00 | $14.00 | $27.50 |
| 23 | Asphalt (CRS-2P) (316-7012) | GAL | 4,642 | $6.50 | $30.00 | $29.50 | $27.00 | $10.00 | $6.00 | $30.25 |
| 24 | Asphalt (RC-250) (316-7016) | GAL | 714 | $4.50 | $56.00 | $55.00 | $51.00 | $15.00 | $13.00 | $56.10 |
| 25 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 3,826 | $5.50 | $28.00 | $30.00 | $25.00 | $15.00 | $7.00 | $27.50 |
| 26 | Aggregate (type-B, GR-3)(sac-B) (316-7171) | CY | 48 | $150.00 | $1,200.00 | $1,400.00 | $1,100.00 | $1,500.00 | $555.00 | $1,210.00 |
| 27 | Aggregate (type-B, GR-5)(sac-B) (316-7175) | CY | 21 | $120.00 | $1,400.00 | $1,500.00 | $1,220.00 | $1,500.00 | $1,100.00 | $1,342.00 |
| 28 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 65 | $150.00 | $1,490.00 | $1,600.00 | $1,325.00 | $1,000.00 | $1,200.00 | $1,457.50 |
| 29 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 339 | $266.00 | $325.00 | $244.00 | $250.00 | $270.00 | $268.40 | |
| 30 | Tack coat (344-7077) | GAL | 123 | $1.70 | $5.00 | $2.00 | $10.00 | $12.00 | $1.65 | |
| 31 | Cem stabil BKFL (400-7010) | CY | 151 | $250.00 | $273.00 | $325.00 | $350.00 | $300.00 | $350.00 | $330.00 |
| 32 | Trench excavation protection (402-7001) | LF | 1,871 | $10.00 | $9.00 | $8.00 | $10.00 | $5.00 | $13.00 | $9.90 |
| 33 | Temporary special shoring (403-7001) | SF | 8,106 | $40.00 | $33.00 | $12.50 | $55.00 | $25.00 | $75.00 | $49.50 |
| 34 | Drilled shaft (24 in) (416-7004) | LF | 2,235 | $225.00 | $184.00 | $275.00 | $300.00 | $155.00 | $300.00 | $108.94 |
| 35 | Drilled shaft (30 in) (416-7005) | LF | 320 | $216.00 | $300.00 | $350.00 | $175.00 | $420.00 | $117.02 | |
| 36 | Class C concrete (abutment)(HPC) (420-7013) | CY | 115.20 | $1,500.00 | $1,220.00 | $1,400.00 | $1,300.00 | $2,000.00 | $4,000.00 | $1,705.00 |
| 37 | Class C concrete (cap)(HPC) (420-7023) | CY | 101.70 | $1,500.00 | $1,430.00 | $1,800.00 | $1,550.00 | $2,200.00 | $4,200.00 | $1,925.00 |
| 38 | Class C concrete (column)(HPC) (420-7039) | CY | 57.60 | $2,000.00 | $1,700.00 | $2,000.00 | $1,200.00 | $2,200.00 | $3,200.00 | $1,925.00 |
| 39 | Reinforced concrete slab (HPC) (422-7002) | SF | 16,770 | $26.00 | $31.00 | $28.00 | $25.00 | $24.00 | $48.00 | $29.70 |
| 40 | Approach slab (422-7013) | CY | 277 | $800.00 | $922.00 | $800.00 | $800.00 | $1,000.00 | $1,200.00 | $935.00 |
| 41 | Retaining wall (MSE) (423-7001) | SF | 3,537 | $70.00 | $125.00 | $85.00 | $120.00 | $150.00 | $141.90 | |
| 42 | Prestressed concrete slab beam (4SB12) (425-7016) | LF | 1,726.02 | $250.00 | $214.00 | $240.00 | $250.00 | $290.00 | $240.00 | $190.07 |
| 43 | Prestressed concrete slab beam (5SB12) (425-7017) | LF | 1,844.52 | $270.00 | $221.00 | $240.00 | $250.00 | $290.00 | $240.00 | $190.07 |
| 44 | Riprap (mow strip)(4 in) (432-7013) | CY | 111.20 | $750.00 | $630.00 | $750.05 | $500.00 | $700.00 | $750.00 | $880.00 |
| 45 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 322 | $132.00 | $130.00 | $130.00 | $160.00 | $130.00 | $220.00 | |
| 46 | Riprap (stone protection)(24 in) (432-7045) | CY | 2,146 | $127.00 | $130.00 | $130.00 | $180.00 | $120.00 | $231.00 | |
| 47 | Riprap (stone protection)(30 in) (432-7047) | CY | 5,929 | $220.00 | $127.00 | $141.00 | $135.00 | $242.00 | $120.00 | $231.00 |
| 48 | Riprap (stone protection)(36 in) (432-7048) | CY | 2,761 | $127.00 | $150.00 | $140.00 | $300.00 | $120.00 | $231.00 | |
| 49 | Rail (type T221) (450-7004) | LF | 332 | $120.00 | $165.00 | $180.00 | $170.00 | $180.00 | $209.00 | |
| 50 | Rail (type T223)(HPC) (450-7009) | LF | 850 | $150.00 | $125.00 | $175.00 | $220.00 | $170.00 | $240.00 | $220.00 |
| 51 | Type A joint (454-7001) | LF | 413 | $165.00 | $55.00 | $95.00 | $180.00 | $100.00 | $52.00 | $132.00 |
| 52 | RC pipe (CL III)(24 in) (464-7005) | LF | 80 | $115.00 | $135.00 | $100.00 | $110.00 | $120.00 | $110.00 | $143.00 |
| 53 | RC pipe (CL III)(30 in) (464-7007) | LF | 30 | $175.00 | $150.00 | $170.00 | $125.00 | $225.00 | $176.00 | |
| 54 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 4 | $1,700.00 | $2,600.00 | $3,500.00 | $2,690.00 | $3,500.00 | $1,300.00 | $2,420.00 |
| 55 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 1 | $5,000.00 | $6,000.00 | $5,870.00 | $3,500.00 | $2,900.00 | $6,050.00 | |
| 56 | Removing structure (set) (496-7004) | EACH | 2 | $1,000.00 | $500.00 | $500.00 | $500.00 | $1,600.00 | $660.00 | |
| 57 | Removing structure (pipe) (496-7007) | LF | 65 | $25.00 | $30.00 | $20.00 | $50.00 | $10.00 | $95.00 | $30.80 |
| 58 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 3 | $35,000 | $23,000 | $30,000 | $50,000 | $36,000 | $95,000 | $44,000 |
| 59 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $40,000 | $50,000 | $50,000 | $50,000 | $150,000 | $55,000 | |
| 60 | Mobilization (500-7001) | LS | 1 | $930,000 | $961,039 | $800,000 | $400,000 | $1,015,000 | $1,100,000 | $1,171,733 |
| 61 | Barricades, signs and traffic handling (502-7001) | MO | 35 | $6,500.00 | $7,700.00 | $2,000.00 | $5,000.00 | $2,500.00 | $5,050.00 | $5,500.00 |
| 62 | TMA (stationary) (505-7001) | DAY | 4 | $215.00 | $400.00 | $400.00 | $1,000.00 | $350.00 | $450.00 | $300.06 |
| 63 | TMA (mobile operation) (505-7003) | DAY | 4 | $200.00 | $800.00 | $150.00 | $1,000.00 | $350.00 | $780.00 | $434.13 |
| 64 | Rock filter dams (install) (type 2) (506-7002) | LF | 709 | $45.00 | $40.00 | $40.00 | $45.00 | $1.00 | $41.00 | $47.94 |
| 65 | Rock filter dams (install) (type 3) (506-7003) | LF | 260 | $80.00 | $90.00 | $55.00 | $65.00 | $1.00 | $80.00 | $94.90 |
| 66 | Rock filter dams (remove) (506-7011) | LF | 969 | $15.00 | $12.00 | $5.00 | $15.00 | $1.00 | $13.00 | $22.65 |
| 67 | Construction exits (install) (type 1) (506-7020) | SY | 1,956 | $35.00 | $40.00 | $15.00 | $25.00 | $1.00 | $35.00 | $39.37 |
| 68 | Construction exits (remove) (506-7024) | SY | 1,956 | $12.00 | $12.00 | $5.00 | $15.00 | $1.00 | $10.00 | $15.31 |
| 69 | Temporary sediment control fence (install) (506-7039) | LF | 7,230 | $4.00 | $4.00 | $3.50 | $4.00 | $1.00 | $4.30 | $5.49 |
| 70 | Temporary sediment control fence (remove) (506-7041) | LF | 7,230 | $1.00 | $1.20 | $1.00 | $1.00 | $1.00 | $1.00 | $1.76 |
| 71 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 440 | $6.00 | $7.00 | $12.00 | $10.00 | $5.00 | $6.50 | $8.11 |
| 72 | Biodegradable erosion control logs (remove) (506-7046) | LF | 440 | $1.50 | $1.40 | $6.00 | $1.00 | $1.00 | $2.20 | $2.43 |
| 73 | Constructing detours (508-7001) | SY | 1,565 | $125.00 | $115.00 | $135.00 | $180.00 | $100.00 | $110.00 | $110.00 |
| 74 | One-way traffic control (port traffic signal) (510-7003) | MO | 35 | $5,500.00 | $3,300.00 | $3,000.00 | $7,500.00 | $4,000.00 | $5,500.00 | $6,285.72 |
| 75 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 4,560 | $45.00 | $40.00 | $49.00 | $75.00 | $80.00 | $62.00 | $59.16 |
| 76 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 2,250 | $15.00 | $8.00 | $50.00 | $25.00 | $20.00 | $22.00 | $18.46 |
| 77 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 4,560 | $15.00 | $14.00 | $11.00 | $25.00 | $35.00 | $25.00 | $25.45 |
| 78 | Driveways (ACP) (530-7010) | SY | 240 | $60.00 | $156.00 | $150.00 | $70.00 | $50.00 | $125.00 | $104.50 |
| 79 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 450 | $14.00 | $10.00 | $6.00 | $30.00 | $9.00 | $9.35 | |
| 80 | Right of way markers (538-7001) | EACH | 25 | $400.00 | $230.00 | $500.00 | $100.00 | $80.00 | $900.00 | $476.15 |
| 81 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,525 | $26.00 | $32.00 | $34.00 | $27.00 | $30.00 | $30.00 | $31.35 |
| 82 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 13 | $2,300.00 | $2,500.00 | $2,000.00 | $1,850.00 | $2,000.00 | $2,300.00 | $2,420.00 |
| 83 | Short radius (28") (540-7013) | LF | 42 | $50.00 | $34.00 | $150.00 | $55.00 | $35.00 | $32.00 | $33.00 |
| 84 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,500.00 | $1,300.00 | $2,000.00 | $2,100.00 | $1,500.00 | $1,300.00 | $1,320.00 |
| 85 | Remove metal beam guard fence (542-7001) | LF | 1,600 | $3.50 | $4.50 | $5.00 | $3.00 | $2.00 | $4.00 | $4.40 |
| 86 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 16 | $350.00 | $255.00 | $250.00 | $2,750.00 | $100.00 | $270.00 | $275.00 |
| 87 | Guardrail end treatment (install) (544-7001) | EACH | 13 | $3,200.00 | $3,000.00 | $3,400.00 | $3,200.00 | $3,000.00 | $3,100.00 | $3,245.00 |
| 88 | Guardrail end treatment (remove) (544-7003) | EACH | 16 | $350.00 | $255.00 | $500.00 | $350.00 | $500.00 | $260.00 | $275.00 |
| 89 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 8 | $1,700.00 | $1,250.00 | $2,000.00 | $2,000.00 | $2,500.00 | $1,300.00 | $1,320.00 |
| 90 | Crash cushion attenuator (remove) (545-7004) | EACH | 10 | $900.00 | $900.00 | $1,000.00 | $2,500.00 | $1,000.00 | $900.00 | $935.00 |
| 91 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 11 | $9,000.00 | $9,000.00 | $9,250.00 | $7,500.00 | $9,000.00 | $8,000.00 | $8,250.00 |
| 92 | Pipe underdrains (type 7) (6") (556-7007) | LF | 358 | $42.00 | $100.00 | $35.00 | $40.00 | $42.00 | $66.00 | |
| 93 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 1 | $312.00 | $750.00 | $350.00 | $2,500.00 | $980.00 | $341.00 | |
| 94 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $725.00 | $660.00 | $1,200.00 | $850.00 | $2,000.00 | $1,300.00 | $825.00 |
| 95 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 33 | $25.00 | $42.00 | $30.00 | $35.00 | $45.00 | $45.00 | $44.00 |
| 96 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 37 | $30.00 | $46.00 | $30.00 | $35.00 | $45.00 | $48.00 | $44.00 |
| 97 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 217 | $5.50 | $7.00 | $6.00 | $8.00 | $10.00 | $5.50 | $4.79 |
| 98 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 17,739 | $1.50 | $1.50 | $1.50 | $2.50 | $2.50 | $1.10 | $0.92 |
| 99 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 120 | $12.00 | $10.00 | $15.00 | $10.00 | $15.00 | $8.00 | $6.99 |
| 100 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 16,500 | $1.00 | $1.40 | $1.50 | $2.50 | $2.50 | $1.10 | $0.92 |
| 101 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,644 | $1.50 | $1.40 | $1.50 | $1.00 | $2.00 | $4.00 | $4.40 |
| 102 | Pavement sler 4" (666-7346) | LF | 10,776 | $0.50 | $0.50 | $0.75 | $0.50 | $0.60 | $0.40 | $0.33 |
| 103 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 5,388 | $1.00 | $1.30 | $1.50 | $3.00 | $3.00 | $1.00 | $0.87 |
| 104 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 5,388 | $1.00 | $1.30 | $1.50 | $3.00 | $3.00 | $1.00 | $0.87 |
| 105 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 73 | $5.50 | $17.00 | $20.00 | $10.00 | $15.00 | $13.00 | $11.00 |
| 106 | Eliminating existing PM & markers (4") (677-7001) | LF | 23,966 | $0.50 | $1.10 | $0.90 | $0.70 | $1.00 | $0.70 | $0.66 |
| 107 | Full - width mowing (730-7022) | ACRE | 1.53 | $35.00 | $4,000.00 | $1,000.00 | $5,000.00 | $100.00 | $6,000.00 | $4,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way